THIS IS THE ARCHIVE FOR SAHRIS 1.0
THIS SITE IS NOW AN ARCHIVE AND IS NOT SUITABLE FOR MAKING APPLICATIONS
Please be aware that no content and application creation or changes to information on this version of SAHRIS will be retained.
To make applications or utilise SAHRIS for the creation of information, please use the new site:
https://sahris.org.za
Changes to SAHRIS!
The South African Heritage Resources Information System (SAHRIS) has undergone a generational upgrade and restructure. These changes to the site include, but are not limited to:
- A new & modernised look and layout
- Improved site usage flows with respect to applications and content creation
- Improved site performance and stability
Launch for the new version of SAHRIS occurred on Monday the 30th of October 2023.
The new site can be found here:
SAHRIS | SAHRIS
Displaying 13301 - 13350 of 18975
ReportRef | ReportTitle | ReportType | ReportDate | Authors | AuthoringBody | CommissioningCompany | Post date |
---|---|---|---|---|---|---|---|
Exemption from Phase 1 Palaeontological Impact Assessment: Upgrading of Jan Smuts Avenue between Kent Road and 8th Avenue and between Bolton Road and Northwold Drive, Johannesburg, Gauteng Province | Exemption from Phase 1 Palaeontological Impact Assessment: Upgrading of Jan Smuts Avenue between Kent Road and 8th Avenue and between Bolton Road and Northwold Drive, Johannesburg, Gauteng Province | PIA Desktop | 10/11/2017 | Lloyd Rossouw | Paleo Field Services | Envirolution Consulting (Pty) Ltd | 18/06/2018 - 09:53 |
Draft Heritage Report for the proposed P236 Road Upgrade from km 14.00 to km 32.00 | FIRST PHASE CULTURAL HERITAGE IMPACT ASSESSMENT OF THE PROPOSED P236 ROAD UPGRADES FROM KM14 TO KM32, UBOMBU, KWAZULU-NATAL | HIA Phase 1 | 10/11/2017 | Active Heritage CC | 13/03/2018 - 09:47 | ||
Third Road Bridge Heritage Screener Report | Third Road Bridge Heritage Screener Report | Heritage Impact Assessment Specialist Reports | 10/11/2017 | Nicholas Wiltshire | Envirolution Consulting (Pty) Ltd | 09/01/2018 - 09:10 | |
Banks Drift Heritage Study | Phase 1 Heritage Impact Assessment of proposed installation of new irrigation pivots and associated infrastructure on the farm Banks Drift 163 near Douglas, Northern Cape Province. | AIA Phase 1 | 13/11/2017 | Lloyd Rossouw | Paleo Field Services | Paleo Field Services | 04/12/2017 - 16:49 |
Pase 1 HIA study for proposed Mafube Road Realignment | A PHASE I HERITAGE IMPACT ASSESSMENT (HIA) STUDY FOR THE PROPOSED MAFUBE LIFE X ROAD REALIGNMENT PROJECT NEAR BELFAST IN THE MPUMALANGA PROVINCE | Heritage Study | 13/11/2017 | Dr Julius CC Pistorious Archaeologist and heritage Consultant | Golder Associates Africa (Pty) Ltd | 19/03/2018 - 10:08 | |
Zulani Heritage Study | Phase 1 Heritage Impact Assessment of proposed installation of new irrigation pivots and associated infrastructure on the farm Zulani 167 near Douglas, Northern Cape Province. | AIA Phase 1 | 13/11/2017 | Lloyd Rossouw | Paleo Field Services | Paleo Field Services | 04/12/2017 - 16:56 |
ILI3864 - Normandie-Iphiva NDA | Needs and Desirability Application Form for the Eskom Northern KZN Strengthening Project - Normandie-Iphiva 400 kV Powerline | Heritage Impact Assessment Specialist Reports | 13/11/2017 | Justin du Piesanie | Digby Wells Environmental | Eskom Holdings SOC Limited | 13/11/2017 - 15:20 |
Lorraine Heritage Study | Phase 1 Heritage Impact Assessment of proposed installation of new irrigation pivots and associated infrastructure on the farm Lorraine 100 near Douglas, Northern Cape Province. | HIA Phase 1 | 13/11/2017 | Lloyd Rossouw | Paleo Field Services | Paleo Field Services | 04/12/2017 - 16:04 |
ILI3864 - Iphiva Substation | Needs and Desirability Application Form: Eskoms Northern KZN Strengthening Project Iphiva Substations | Heritage Impact Assessment Specialist Reports | 13/11/2017 | Justin du Piesanie | Digby Wells Environmental | Eskom Holdings SOC Limited | 13/11/2017 - 17:03 |
Heritage Screener: Norkem Park Development, Gauteng | Heritage Screener: Norkem Park Development, Gauteng | Heritage Scoping | 14/11/2017 | Katie Smuts | CTS Heritage | GKM Environmental Consultants | 14/11/2017 - 13:55 |
HIA Ventersdorp, North West Province | HERITAGE IMPACT ASSESSMENT FOR THE PROPOSED VENTERSDORP TOWNSHIP ESTABLISHMENT, NORTH WEST PROVINCE PROJECT | HIA Phase 1 | 14/11/2017 | Jaco van der Walt | Heritage Contracts and Archaeological Consulting | METHALE ENVIRONMENTAL CONSULTING | 13/02/2018 - 08:03 |
Phase 1 Archaeological Impact Assessment for the proposed expansion of the Moeijelijk Chrome Mine | Phase 1 Archaeological Impact Assessment for Eco Elementum (Pty) Ltd for the proposed expansion of the Moeijelyk Chrome Mine on the remaining extent of the farm Moeijelijk 412 KS, Sekhukhune, Limpopo | AIA Phase 1 | 14/11/2017 | Eco Elementum (Pty) Ltd | Red Kite Environmental Solutions (Pty) Ltd | 13/03/2018 - 13:45 | |
Thomas Nkobi HIA | PHASE 1 HIA REPORT FOR PROPOSED DEVELOPMENT OF THE THOMAS TITUS NKOBI MEMORIAL PARK (ALSO KNOWN AS SOUTH PARK CEMETERY) EXTENSION PROJECT | HIA Phase 1 | 15/11/2017 | Anton Pelser | 12/12/2017 - 03:56 | ||
Palaeontological desktop Study Queenswood 14 | Amendment of approved township on a certain part of Portion 69 of the Farm Koedoespoort 325–JR. Queenswood Extension 14 City of Tshwane Metropolitan Municipality, Gauteng Province Farm: A certain part of Portion 69 of the Farm Koedoespoort 325-JR Fourie, H. Dr heidicindy@yahoo.com 012 322 7632/012 993 3110 Palaeontological Impact Assessment: Desktop Study Facilitated by: J. Paul v. Wyk Urban Economists & Planners CC P.O. Box 11522, Hatfield, 0028 Tel: 012 361 0217 2017/11/19 Ref: Pending | PIA Desktop | 19/11/2017 | Dr. Heidi Fourie | Dr Heidi Fourie | J Paul van Wyk | 12/01/2018 - 12:41 |
First Phase Heritage impact assessment of section of Farm PTN 1 Lot 252 EMP 13313 | First Phase Heritage impact assessment of section of Farm PTN 1 Lot 252 EMP 13313 | Heritage Impact Assessment Specialist Reports | 19/11/2017 | Frans Prins | Active Heritage CC | Active Heritage CC | 20/11/2017 - 22:35 |
Aquadene Heritage Scoping Report | Heritage Scoping | 20/11/2017 | Len van Schalkwyk | GIBB (Pty) Ltd | 06/12/2017 - 13:36 | ||
HIA Screening SAB Rosslyn Pipeline | NEW NATURAL GAS TRANSMISSION SUPPLY PIPELINE TO SAB PTY LTD, ROSSLYN, TSHWANE METROPOLITAN MUNICIPALITY, GAUTENG Construction of new natural gas pipeline on Erf 79, Erf 9 and Erf 66 Rosslyn, Akasia, City of Tshwane Metropolitan Municipality, Gauteng Province Site Assessment and Heritage Screening Report | Heritage Scoping | 20/11/2017 | Jennifer Kitto | PGS Heritage (Pty) Ltd | Environmental Impact Management Services (Pty) Ltd | 20/11/2017 - 15:25 |
HIA for Mthunzi Chicken Supplier | Heritage Impact Assessment For the Proposed Mthunzi Chicken Supplier, Gauteng Province | Heritage Impact Assessment Specialist Reports | 20/11/2017 | Jaco van der Walt | Heritage Contracts and Archaeological Consulting | Council for Scientific and Industrial Research | 16/04/2018 - 12:36 |
Heritage Desktop Study for Curro Midrand, Gauteng Province | Heritage Desktop Study with regard to proposed development of a new school on Portion 54 of the Farm 397-JR in Midrand, Gauteng Province. | Heritage Statement | 21/11/2017 | Lloyd Rossouw | Palaeo Field Services | Enviroworks | 25/06/2019 - 00:02 |
Phase 1 Palaeontological Impact Assessment for structure locations marked along the proposed new 9 km-long section of the Helios power line near Loeriesfontein, Northern Cape Province. | Phase 1 Palaeontological Impact Assessment for structure locations marked along the proposed new 9 km-long section of the Helios power line near Loeriesfontein, Northern Cape Province. | PIA Phase 1 | 22/11/2017 | Lloyd Rossouw | Paleo Field Services | AECOM SA - Head Office | 27/11/2017 - 10:09 |
BRYPAAL SOLAR POWER (PV) PROJECT Paleontological Report | BRYPAAL SOLAR POWER (PV) PROJECT Paleontological Report | Palaeontological Specialist Reports | 22/11/2017 | Piet van Deventer | Boscia Environmental Solutions | Boscia Environmental Solutions | 18/06/2018 - 21:26 |
Addendum to HIA, Springbok Wind Farm | SPRINGBOK WIND ENERGY FACILITY Portions 17 and 19 of Farm No. 134; Portion 0 (Remaining Extent) and Portion 1 (Remaining Extent) of Farm No. 132;Portion 0 (Remaining Extent) of Farm No. 946; Portion 0 (Remaining Extent) of Farm No. 215;Portion 0 of Farm No. 635; and Portion 9 (Remaining Extent) of Farm No. 133 NAMAQUALAND MAGISTERIAL DISTRICT | HIA Phase 2 | 23/11/2017 | Ron Martin | Ron Martin Heritage Consultancy | Longyuan Mulilo Wind Power (Pty) Ltd | 22/11/2017 - 12:47 |
HIA Kaolin Mine on Rondawel 638 | HERITAGE IMPACT ASSESSMENT FOR THE EXTENSION OF THE 5 HA KAOLIN MINE ON PORTION 1 OF THE FARM RONDAWEL 638, NAMAQUALAND DISTRICT, NORTHERN CAPE | HIA Phase 1 | 23/11/2017 | ACO Associates CC | Imvusa Kaolien (Pty) Ltd | 23/11/2017 - 11:15 | |
Phase 1 Archaeological Impact Assessment for the proposed Bauba Platinum Farms Mining Project | PHASE 1 ARCHAEOLOGICAL IMPACT ASSESSMENT for the proposed opencast mining and initial site areas of the Northern and Southern Clusters of the Bauba Platinum Farms Mining Project, Sekhukhune, Limpopo | AIA Phase 1 | 24/11/2017 | Eco Elementum (Pty) Ltd | Red Kite Environmental Solutions (Pty) Ltd | 13/03/2018 - 14:21 | |
Palaeontological Impact Assessment: Desktop Study | Palaeontological Impact Assessment: Desktop Study: The Proposed Diamonds Alluvial & Diamonds General Prospecting Right near Schweizer Reneke on Portion 2 and a certain Extent of the Remaining Extent of the Farm Kameelkuil 88, Registration Division: HO, North West Province. Dr Ruth Segomotsi Mompati District Municipality, Mamusa Local Municipality, North West Province | PIA Desktop | 24/11/2017 | Dr. Heidi Fourie | 27/11/2017 - 15:08 | ||
AIA-Panorama Farm Centre Pivot Irrigation Development, near Cradock, Inxuba Yethemba Local Municipality, Eastern Cape | AIA-Panorama Farm Centre Pivot Irrigation Development, near Cradock, Inxuba Yethemba Local Municipality, Eastern Cape | AIA Phase 1 | 27/11/2017 | Karen Van Ryneveld | isi-Xwiba Consulting cc | 27/11/2017 - 09:23 | |
PIA-Panorama Farm Cenre Pivot Irrigation Development, near Cradock, Inxuba Yethemba Local Municipality, Eastern Cape | PIA-Panorama Farm Cenre Pivot Irrigation Development, near Cradock, Inxuba Yethemba Local Municipality, Eastern Cape | PIA Desktop | 27/11/2017 | Elize Butler | 27/11/2017 - 09:52 | ||
Estcourt | HERITAGE SURVEY OF THE PROPOSED WATER RETICULATION SCHEME ESTCOURT, KZN | Heritage Impact Assessment Specialist Reports | 27/11/2017 | Gavin Anderson | Umlando: Archaeological Surveys & Heritage Management | Terratest (Pty) Ltd | 10/04/2018 - 08:45 |
AIA-Panorama Farm Cenre Pivot Irrigation Development, near Cradock, Inxuba Yethemba Local Municipality, Eastern Cape | AIA-Panorama Farm Cenre Pivot Irrigation Development, near Cradock, Inxuba Yethemba Local Municipality, Eastern Cape | AIA Phase 1 | 27/11/2017 | Karen Van Ryneveld | 27/11/2017 - 09:54 | ||
Aggeneis-Paulputs Amended Heritage Report | Amendment of the Final Heritage Impact assessment for the Proposed Aggeneis-Paulputs 400kV Transmission Powerline and Substations Upgrade, Northern Cape, DEA REF: 14/12/16/3/3/2/1012 | Heritage Impact Assessment Specialist Reports | 27/11/2017 | David Morris | SAHRA Council | McGregor Museum | 28/11/2017 - 12:27 |
Palaeontological Impact Assessment | Palaeontological Impact Assessment for the proposed Rehabilitation of the wetland, Loskop Dam Natre Reserve, Farm Hondekraal 234, Mpumalanga Province | PIA Desktop | 27/11/2017 | Marion Bamford | Prof Marion Bamford | 12/07/2018 - 11:26 | |
Aggeneis-Paupluts_Palaeontological Heritage Assessment: Desktop Study | Palaeontological Heritage Assessment for the Proposed Aggeneis-Paulputs 400kV Transmission Powerline and substations Upgrades, Namaqua and Siyanda Districts, Northern Cape Province | PIA Desktop | 27/11/2017 | John Almond | SAHRA Council | Natura Viva CC | 28/11/2017 - 12:54 |
AIA Scoping - Boulders WEF (Feb'18) | Archaeological Scoping Study of the Proposed Boulders Wind Farm, Vredenburg Peninsula, Western Cape | Archaeological Specialist Reports | 29/11/2017 | Dave Halkett, Lita Webley | ACO Associates CC | Savannah Environmental (Pty) Ltd | 28/02/2018 - 13:52 |
HIA report for Ventersdorp | A Heritage report for the proposed Human Development Settlement in Ventersdorp in the J. B Marks Local Municipality. | Built Environment and Cultural Landscapes | 30/11/2017 | Auditors | African Heritage Consultants CC | Lesekha Consulting | 21/11/2017 - 09:11 |
SIB4276 HIA | Heritage Impact Assessment for the Millsite TSF Complex | Heritage Impact Assessment Specialist Reports | 30/11/2017 | Justin du Piesanie | Digby Wells Environmental | Sibanye Gold Limited | 19/12/2017 - 08:13 |
AVENUE ROAD BRIDGE UPGRADE HIA | THE PROPOSED UPGRADE OF THE AVENUE ROAD BRIDGE IN NORWOOD, CITY OF JOHANNESBURG METROPOLITAN MUNICIPALITY, GAUTENG PROVINCE | Heritage Impact Assessment Specialist Reports | 30/11/2017 | Johnny Van Schalkwyk | Gauteng - Department of Agriculture and Rural Development | Envirolution Consulting (Pty) Ltd | 30/11/2017 - 13:46 |
Third Road Bridge Screening Report | Klein Jukskei River Bridge Rehabilitation and Upgrade | Heritage Impact Assessment Specialist Reports | 30/11/2017 | Nicholas Wiltshire | Gauteng Department of Agriculture and Rural Development | Envirolution Consulting (Pty) Ltd | 30/11/2017 - 14:20 |
San Kraal WEF Heritage Impact Assessment | Heritage Impact Assessment for the Proposed San Kraal Wind Energy Facility to be situated in the Northern Cape | Heritage Impact Assessment Specialist Reports | 30/11/2017 | Tim Hart | ACO Associates CC | Arcus Consulting | 08/02/2018 - 12:10 |
Phase 1 Cultural Heritage Impact Assessment: | THE PROPOSED CONSTUCTION OF THE MEYERSDAL RESERVOIR OVERFLOW PIPELINE, CITY OF JOHANNESBURG METROPOLITAN MUNICIPALITY, GAUTENG PROVINCE | HIA Phase 1 | 30/11/2017 | Johnny Van Schalkwyk | JA van Schalkwyk Heritage Consultant | Envirolution Consulting (Pty) Ltd | 18/01/2018 - 09:52 |
Phezukomoya Heritage Impact Assessment | Heritage Impact Assessment for the Proposed Phezukomoya Wind Energy Facility to be situated in the Northern Cape | Heritage Impact Assessment Specialist Reports | 30/11/2017 | Tim Hart | ACO Associates CC | Arcus Consulting | 08/02/2018 - 14:04 |
HIA 341-403 Sydney Road, Congella, Durban | Heritage Impact assessment of structures at 341-403 Sydney Road, Congella, Durban, Ethekwini, KZN | HIA Phase 2 | 30/11/2017 | Lindsay Napier | Lindsay Napier Architect | Premier FMCG (Pty)Ltd | 09/03/2022 - 16:34 |
PHASE I ARCHAEOLOGICAL AND CULTURAL HERITAGE IMPACT ASSESSMENT FOR THE PROPOSED CONSTRUCTION OF APPROXIMATELY 170KM 1 X 400KV POWERLINE | PHASE I ARCHAEOLOGICAL AND CULTURAL HERITAGE IMPACT ASSESSMENT SPECIALIST REPORT FOR THE PROPOSED CONSTRUCTION OF APPROXIMATELY 170KM 1 X 400KV POWERLINE FROM MAPHUTHA SUBSTATION TO WITKOP SUBSTATION WITHIN THE SEKHUKHUNE AND CAPRICON DISTRICT MUNICIPALITIES OF LIMPOPO PROVINCE | HIA Phase 1 | 30/11/2017 | Munyadziwa Magoma | Nsovo Environmental Consulting | Nsovo Environmental Consulting | 09/02/2018 - 12:18 |
PALAEONTOLOGICAL IMPACT ASSESSMENT | PALAEONTOLOGICAL IMPACT ASSESSMENT OF THE PROPOSED DIAMONDS ALLUVIAL & DIAMONDS GENERAL PROSPECTING RIGHT APPLICATION NEAR CHRISTIANA ON THE REMAINING EXTENT OF PORTION 1 OF THE FARM KAFFRARIA 314, REGISTRATION DIVISION HO, NORTH WEST PROVINCE | PIA Desktop | 30/11/2017 | Elize Butler | 04/12/2017 - 16:16 | ||
Natia Development HIA | CULTURAL HERITAGE IMPACT ASSESSMENT OF THE PROPOSED NATIA COMMERCIAL DEVELOPMENT, HAMMARSDALE, KWAZULU-NATAL. | HIA Phase 1 | 01/12/2017 | Frans Prins | Active Heritage CC | Enviroedge | 01/08/2018 - 14:31 |
SOUTHERN REGIONAL BULK WATER AND SANITATION SCHEME | FIRST PHASE HERITAGE IMPACT ASSESSMENT OF THE PROPOSED SOUTHERN REGIONAL BULK WATER AND SANITATION SCHEME, ILEMBE DISTRICT MUNICIPALITY, KWAZULUNATAL. | HIA Phase 1 | 01/12/2017 | Frans Prins | Active Heritage CC | Triplo4 Sustainable Solutions (Pty) Ltd | 12/01/2018 - 05:58 |
Umbumbulo Pump Station | PHASE ONE HERITAGE IMPACT ASSESSMENT OF THE PROPOSED UMBUMBULO PUMP STATION, ETHEKWENI MUNICIPALITY, KZN. | HIA Phase 1 | 01/12/2017 | Frans Prins | Kerry Seppings Environmental Management | Active Heritage CC | 09/01/2018 - 06:16 |
Madonsi Gold MIne HIA | Madonsi Gold MIne Heritage Impact Assessment | Heritage Impact Assessment Specialist Reports | 01/12/2017 | Nelius Kruger | Exigo3 Sustainability | 27/01/2018 - 09:06 | |
Phase 1 Cultural Heritage Impact Assessment: | THE CONSTRUCTION OF A 132KV CHIKADEE POWER LINE ON THE FARM TWEEFONTEIN 458JS, SOUTHEAST OF MIDDELBURG, STEVE TSHWETE LOCAL MUNICIPALITY, MPUMALANGA PROVINCE | HIA Phase 1 | 01/12/2017 | Johnny Van Schalkwyk | Eskom Distribution Division | Envirolution Consulting (Pty) Ltd | 19/01/2018 - 12:56 |
Exemption from Phase 1 Palaeontological Impact Assessment: New township development on the farm Elandskuil, Ventersdorp, North West Province | Exemption from Phase 1 Palaeontological Impact Assessment: New township development on the farm Elandskuil, Ventersdorp, North West Province | PIA Desktop | 03/12/2017 | Lloyd Rossouw | Paleo Field Services | METHALE ENVIRONMENTAL CONSULTING | 13/02/2018 - 07:59 |
Proposed Umsimbithi eMakhazeni Mining Project | Heritage Impact assessment Report for the proposed Umsimbithi eMakhazeni Mining Project near Belfast, Mpumalanga Province | Heritage Impact Assessment Specialist Reports | 04/12/2017 | Jessica Angel | PGS Heritage (Pty) Ltd | Kongiwe Environmental (Pty) Ltd | 18/05/2018 - 10:15 |