THIS IS THE ARCHIVE FOR SAHRIS 1.0
THIS SITE IS NOW AN ARCHIVE AND IS NOT SUITABLE FOR MAKING APPLICATIONS
Please be aware that no content and application creation or changes to information on this version of SAHRIS will be retained.
To make applications or utilise SAHRIS for the creation of information, please use the new site:
https://sahris.org.za
Changes to SAHRIS!
The South African Heritage Resources Information System (SAHRIS) has undergone a generational upgrade and restructure. These changes to the site include, but are not limited to:
- A new & modernised look and layout
- Improved site usage flows with respect to applications and content creation
- Improved site performance and stability
Launch for the new version of SAHRIS occurred on Monday the 30th of October 2023.
The new site can be found here:
SAHRIS | SAHRIS
Displaying 14051 - 14100 of 18975
ReportRef | ReportTitle | ReportType | ReportDate | Authors | AuthoringBody | CommissioningCompany | Post date |
---|---|---|---|---|---|---|---|
Liberty Midlands Mall Phase 4 development | Liberty Midlands Mall Phase 4 development (Midlands Park Run and Bike Track, Msundusi Local Municipality, KwaZulu-Natal | HIA Phase 1 | Jean Beater | JLB Consulting | Afzelia Environmental Consultants Pty Ltd | 29/01/2020 - 10:07 | |
HIA Report for Moakeng Housing Development | PHASE I HERITAGE IMPACT ASSESSMENT (INCLUDING PALAEONTOLOGICAL DESKTOP ASSESSMENT) IN TERMS OF SECTION 38 OF THE NATIONAL HERITAGE RESOURCES ACT NO 25/1999 FOR THE PROPOSED MAOKENG HOUSING DEVELOPMENT (KROONSTAD) FREE STATE PROVINCE | HIA Phase 1 | 15/01/2020 | Edward Matenga | Archaeological and Heritage Services Africa (Pty) Ltd | Archaeological and Heritage Services Africa (Pty) Ltd | 29/01/2020 - 18:54 |
Heritage Assessment Report for Proposed Development at Cradock ERF 2578 corner R 61 and N 10 | Proposed development and related operation of facilities or infrastructure for the storage, or for the storage and handling, of a dangerous good (filling or service station) where such storage occurs in containers with a combine capacity of more than 80 m3 but less than 500 m3 with the combined capacity of [1x46 m3 Unleaded 93, 1x46 m3 95, 1x46 m3 diesel 50 & 1x46 m3 diesel 500; (Combined capacity=184m3)]; car wash and convenient store at Cradock; Erf Number 2578 corner R61 Road and N10; Chris Hani region within jurisdiction of Inxuba Yethemba Local Municipality, Eastern Cape Province. | Heritage Impact Assessment Specialist Reports | 30/01/2020 | 30/01/2020 - 01:42 | |||
HIA for Kanakies | Heritage Impact Assessment for Farm Kanakies 332 | Heritage Impact Assessment Specialist Reports | Cabanga Environmental | Archaetnos Culture & Cultural Resource Consultants | 30/01/2020 - 09:41 | ||
Heritage Impact Assessment for the proposed Ilima Coal Company Kranspan Project | Heritage Impact Assessment for the proposed Ilima Coal Company Kranspan Project | HIA Phase 1 | 02/08/2019 | Jaco van der Walt | Heritage Contracts and Archaeological Consulting | ABS Africa | 30/01/2020 - 10:19 |
Imfunda Yophongolo irrigation cluster | HERITAGE SURVEY OF THE PROPOSED MFUNDA YOPHONGOLO IRRIGATION CLUSTER ONE PROJECT, KZN | HIA Phase 1 | 30/11/2019 | Gavin Anderson | Umlando: Archaeological Surveys & Heritage Management | Afzelia Environmental Consultants Pty Ltd | 30/01/2020 - 12:26 |
Proposed (8 Broiler houses) on portion 42 of the farm Zandfontein 386 JQ. | ARCHAEOLOGICAL IMPACT ASSESSMENT RELATING TO THE PROPOSED POULTRY FARM ( 8 BROILER HOUSES) ON PORTION 42 OF THE FARM ZANDFONTEIN 386 JQ NEAR MAGALIESBURG WITHIN RUSTENBURG LOCAL MUNICIPALITY OF THE BOJANALA DISTRICT, NORTH WESTPROVINCE, SOUTH AFFRICA | AIA Phase 1 | 07/11/2019 | Ndivhuho Eric Mathoho | North West Provincial Heritage Resources Authority | Tholoana Sustainable Development and Environmental Consultants | 30/01/2020 - 16:56 |
Stockowners Filling Station Heritage Impact Report | A Phase One Cultural Heritage Impact Assessment For The Proposed Establishment Of A Filling Station On Erf 3148, Howick, Umngeni Municipality, KwaZulu-Natal | HIA Phase 1 | 16/12/2019 | Active Heritage CC | Green Door Environmental | 31/01/2020 - 09:15 | |
PROPOSED IBISI INFILL HOUSING PROJECT, UMZIMKHULU LOCAL MUNICIPALITY KWAZULU-NATAL | PROPOSED IBISI INFILL HOUSING PROJECT, UMZIMKHULU LOCAL MUNICIPALITY KWAZULU-NATAL | HIA Phase 1 | 01/12/2019 | Jean Beater | JLB Consulting | Enviroedge | 31/01/2020 - 10:44 |
Alterations to Director's Office at the South African Observatory | Alterations to Director's Office at the South African Observatory | 31/01/2020 | SOUTH AFRICAN ASTRONOMICAL OBSERVATORY NATIONAL RESEARCH FOUNDATION | 31/01/2020 - 11:30 | |||
HIA for the proposed housing development in Moakeng(Phase II) (5390 Erven), Kroonstad FS | PHASE I HERITAGE IMPACT ASSESSMENT (INCLUDING PALAEONTOLOGICAL DESKTOP ASSESSMENT) IN TERMS OF SECTION 38 OF THE NATIONAL HERITAGE RESOURCES ACT NO 25/1999 FOR THE PROPOSED PHASE II MAOKENG HOUSING DEVELOPMENT(5390 ERVEN MOAKENG) (KROONSTAD), FREE STATE PROVINCE | HIA Phase 1 | 25/11/2020 | Edward Matenga | Edward Matenga | Archaeological and Heritage Services Africa (Pty) Ltd | 31/01/2020 - 12:01 |
AfriSam HIA | 1st phase H.I.A. of a study area that includes portion 3 (Bergville) of the farm Hondefontein 216, portion 2 of the farm Vogelfontein 176 and a portion of Erven 4 Delportshoop, Kimberley district Northern Cape for: AfriSam – Ulco. Northern Cape | HIA Phase 1 | 01/07/2018 | Sidney Miller | Afrisam (PTY) LTD Ulco Cement Operation | 31/01/2020 - 12:32 | |
AfriSam PIA | AfriSam (South Africa) Properties (Pty) Ltd: Ulco Cement Plant and Mining Operation: Proposed Bergville Project Dikgatlong Local Municipality, Frances Baard District Municipality, Northern Cape Province. Farm: Portion 3 (Bergville) of Hondefontein 216, Portion 2 of Vogelfontein 176, Portion of Erven 4 Delportshoop Palaeontological Impact Assessment: Desktop Study | PIA Desktop | 19/12/2019 | Dr. Heidi Fourie | Afrisam (PTY) LTD Ulco Cement Operation | 31/01/2020 - 12:35 | |
HIA Inland Diesel Depot Portion 5 of the Farm Franshoek No. 1861, Swinburne Free State. | A REPORT ON A CULTURAL HERITAGE IMPACT ASSESSMENT FOR A PROPOSED DEVELOPMENT OF AN INLAND DIESEL WHOLESALE DEPOT INCLUDING A TRANSPORTATION PIPELINE ON PORTION 5 OF THE FARM FRANSHOEK 1861, SWINBURNE, FREE STATE PROVINCE | Heritage Impact Assessment Specialist Reports | 10/06/2019 | Prof. Anton van Vollenhoven | SAHRA Council | Archaetnos Culture & Cultural Resource Consultants | 03/02/2020 - 08:09 |
Phase 1 Heritage Impact Assessment | PROSPECTING RIGHT APPLICATION ON VARIOUS PORTIONS OF THE FARM READS DRIFT 74, DOUGLAS REGION, PIXLEY KA SEME DISTRICT MUNICIPALITY, NORTHERN CAPE PROVINCE | HIA Phase 1 | 30/11/2019 | J.A. van Schalkwyk | 03/02/2020 - 12:37 | ||
national assembly kitchens | Heritage Assessment for Alterations to the National Assembly Kitchens | HIA Phase 3 | 31/01/2020 | Brendan Hart | Mayat Hart | Department of Public Works | 03/02/2020 - 14:10 |
Bloemsmond 4 Heritage Impact Assessment | HERITAGE IMPACT ASSESSMENT (REQUIRED UNDER SECTION 38(8) OF THE NHRA (No. 25 OF 1999) Bloemsmond 4 PV Project, Upington, Northern Cape Province | AIA Phase 1 | 04/09/2019 | Jaco van der Walt | Heritage Contracts and Archaeological Consulting | Cape Environmental Assessment Practitioners | 03/02/2020 - 14:20 |
Bloemsmond 4 Palaeontology desktop assessment | RECOMMENDED EXEMPTION FROM FURTHER PALAEONTOLOGICAL STUDIES: PROPOSED BLOEMSMOND 3, BLOEMSMOND 4 AND BLOEMSMOND 5 SOLAR PV FACILITIES ON PORTIONS 5 AND 14 OF THE FARM BLOEMSMOND 455 NEAR UPINGTON AND THEIR CONNECTION TO THE NATIONAL GRID VIA THE UPINGTON MAIN TRANSMISSION SUBSTATION, ZF MGCAWU DISTRICT MUNICIPALITY, NORTHERN CAPE | PIA Desktop | 04/09/2019 | John Almond | Natura Viva CC | Cape Environmental Assessment Practitioners | 03/02/2020 - 14:29 |
Bloemsmond 4 Visual Impact Assessment | THE PROPOSED BLOEMSMOND 4 SOLAR PROJECT, NORTHERN CAPE PROVINCE, SOUTH AFRICA Final Visual Impact Basic Assessment Report | Visual Impact Assessment | 05/09/2019 | Stephen Stead | Visual Resource Management Africa cc | Cape Environmental Assessment Practitioners | 03/02/2020 - 14:40 |
HIA for Serurubele solar PV | Heritage Impact Assessment for Serurubele Solar PV | Heritage Impact Assessment Specialist Reports | 03/02/2020 - 15:40 | ||||
Bloemsmond 5 Heritage Impact Assessment Report | HERITAGE IMPACT ASSESSMENT (REQUIRED UNDER SECTION 38(8) OF THE NHRA (No. 25 OF 1999) Bloemsmond 5 PV Project, Upington, Northern Cape Province | HIA Phase 1 | 04/09/2019 | Jaco van der Walt | Heritage Contracts and Archaeological Consulting | Cape Environmental Assessment Practitioners | 03/02/2020 - 16:51 |
Bloemsmond 5 Palaeontology Desktop Assessment | RECOMMENDED EXEMPTION FROM FURTHER PALAEONTOLOGICAL STUDIES: PROPOSED BLOEMSMOND 3, BLOEMSMOND 4 AND BLOEMSMOND 5 SOLAR PV FACILITIES ON PORTIONS 5 AND 14 OF THE FARM BLOEMSMOND 455 NEAR UPINGTON AND THEIR CONNECTION TO THE NATIONAL GRID VIA THE UPINGTON MAIN TRANSMISSION SUBSTATION, ZF MGCAWU DISTRICT MUNICIPALITY, NORTHERN CAPE | PIA Desktop | 05/09/2019 | John Almond | Natura Viva CC | Cape Environmental Assessment Practitioners | 03/02/2020 - 16:53 |
Bloemsmond 5 Visual Impact Assessment Report | Bloemsmond 5 Visual Impact Assessment Report | Visual Impact Assessment | 04/09/2019 | Stephen Stead | Visual Resource Management Africa cc | Cape Environmental Assessment Practitioners | 03/02/2020 - 16:56 |
Construction of Mafakathini Shopping Centre and Fuel Filling Station | Letter of Exemption for the Construction of Mafakathini Shopping Centre and Fuel Filling Station | HIA Letter of Exemption | 04/02/2020 | Gavin Anderson | Umlando: Archaeological Surveys & Heritage Management | Mondli Consulting | 04/02/2020 - 12:23 |
Construction of Mafakathini Shopping Centre and Fuel Filling Station | Exemption letter for the Construction of Mafakathini Shopping Centre and Fuel Filling Station | HIA Letter of Exemption | 04/02/2020 | Gavin Anderson | Umlando: Archaeological Surveys & Heritage Management | Mondli Consulting | 04/02/2020 - 12:33 |
Construction of Milky Way Shopping centre and Fuel service station | Letter of Exemption for the construction of Milky Way Shopping centre and Fuel service station | HIA Letter of Exemption | 04/02/2020 | Gavin Anderson | Umlando: Archaeological Surveys & Heritage Management | Mondli Consulting | 04/02/2020 - 13:03 |
Construction of Milky Way Shopping centre and Fuel service station | Letter of Exemption for the construction of Milky Way Shopping centre and Fuel service station | HIA Letter of Exemption | 04/02/2020 | Gavin Anderson | Umlando: Archaeological Surveys & Heritage Management | Mondli Consulting | 05/02/2020 - 06:03 |
District Six Monitoring: Phase 4 Rubble Removal | Archaeological Permit Application for Monitoring Rubble Removal, Submitted in Support of a Permit Application in Terms of Section 35 of the NHRA (1999) for District Six Phase Four Development on Parcels P and N, District Six, Cape Town, Erven 177646, 10010 and 117891-117898 | Archaeological Monitoring | 05/02/2020 | Katie Smuts | Rennie Scurr Adendorff | Delta Built Environment Consultants (Pty) Ltd | 05/02/2020 - 13:12 |
90 Plein Street Kitchens | Alterations to the Kitchens at 90 Plein Street | HIA Phase 3 | 31/01/2020 | Brendan Hart | Mayat Hart Architecture | Department of Public Works | 05/02/2020 - 16:05 |
Marks Buildings Kitchens | Alterations to the Kitchens in the Marks Building | HIA Phase 3 | 31/01/2020 | Brendan Hart | Mayat Hart | Department of Public Works | 05/02/2020 - 16:07 |
90 Plein Street Kitchens | Alterations to the Kitchens in the 90 Plein Street Building | HIA Phase 3 | 31/01/2020 | Brendan Hart | Mayat Hart | Department of Public Works | 05/02/2020 - 16:09 |
HERITAGE IMPACT ASSESSMENT (HIA) FOR THE PROPOSED POWER LINE DEVELOPMENT AT THE MAMPHULI-DZWERANI EXT A SUBSTATION | HERITAGE IMPACT ASSESSMENT (HIA) FOR THE PROPOSED POWER LINE DEVELOPMENT AT THE MAMPHULI-DZWERANI EXT A SUBSTATION AT MAMPHULI VILLAGE AND AN APPROXIMATELY 6KM LOOP IN LOOP OUT BERSFORT OF 2X132KV POWER LINE FROM AN EXISTING 132KV POWERLINE AT TSHITUNGULWANE VILLAGE, NEAR VUWANI TOWN UNDER VHEMBE DISTRICT IN THE LIMPOPO PROVINCE | HIA Phase 1 | 06/02/2020 | Edward Matenga | Ecorite Consultants | Eskom - LOU | 06/02/2020 - 09:48 |
ON PORTION 488 OF LYDENBURG TOWNLANDS 31JT, IN LYDENBURG | ON PORTION 488 OF LYDENBURG TOWNLANDS 31JT, IN LYDENBURG | HIA Phase 1 | 01/03/2019 | Anton Pelser | APELSER ARCHAEOLOGICAL CONSULTING | Philo Environmental Management | 06/02/2020 - 10:33 |
HIA FOR NKOMATI ANTHRACITE | A REPORT ON A HERITAGE IMPACT ASSESSMENT FOR NKOMATI ANTHRACITE MINE IN THE MAGISTERIAL DISCTRICT OF BABERTON, MPUMALANGA PROVINCE | HIA Phase 3 | 01/07/2011 | Prof. Anton van Vollenhoven | Archaetnos Culture & Cultural Resource Consultants | Archaetnos Culture & Cultural Resource Consultants | 06/02/2020 - 11:03 |
Tuna Park HIA | Cultural Heritage Impact Assessment: Phase 1 Investigation for the Proposed Tuna Park Open Space Project on the Farm Bultfontein 192 IR in Nigel, Ekurhuleni Metropolitan Municipality, Gauteng | HIA Phase 1 | 01/09/2019 | Francois P Coetzee | Francois Coetzee | NuLeaf Planning & Environmental | 06/02/2020 - 12:04 |
Dordrecht Sports Field | A LETTER OF RECOMMENDATION FOR EXEMPTION FOR DORDRECHT SPORTS FIELD UPGRADE | HIA Letter of Exemption | 04/02/2020 | Gavin Anderson | Umlando: Archaeological Surveys & Heritage Management | Indwe Environmental Consulting | 06/02/2020 - 12:37 |
LETTER FOR HIA EXEMPTION REQUEST | LETTER FOR HIA EXEMPTION REQUEST: Q4 FUEL RUSTENBURG: PROPOSED EXPANSION OF FACILITIES, NORTH WEST PROVINCE | HIA Letter of Exemption | 13/09/2019 | Prof. Anton van Vollenhoven | Archaetnos Culture & Cultural Resource Consultants | Setala Environmental | 06/02/2020 - 13:53 |
ARCHAEOLOGICAL SURVEY | PHASE 1 ARCHAEOLOGICAL SURVEY ON PORTION 3 OF THE FARM EZAKHENI C 16863 GS IN ALFRED DUMA LOCAL MUNICIPALITY, KWAZULU NATAL PROVINCE | AIA Phase 1 | 10/07/2019 | Churchill Mpiyesizwe Guduza | Nkululeko Environment and Development Agency | Nkululeko Environment and Development Agency | 06/02/2020 - 18:29 |
Lotus Gardens Extension 18 and Extension 32 to 32 | LOTUS GARDENS EXTENSION 18 AND EXTENSIONS 28 TO 32 (PREVIOUSLY EXTENSIONS 18 TO 28) ON PORTIONS 523 (PORTION OF PORTION 6) AND PORTION 540 (PORTION OF PORTION 524) OF TH FARM PRETORIA TOWN AND TOWNLANDS 351 JR, CITY OF TSHWANE METROPOLITAN MUNICIPALITY | HIA Phase 1 | 10/11/2014 | 07/02/2020 - 12:18 | |||
Heritage Screener: Van Oudtshoornstroom Colliery | Desktop Heritage Screening Assessment for the Proposed development of the Van Oudtshoornstroom Colliery, Ermelo | Heritage Scoping | 23/01/2020 | Jenna Lavin | CTS Heritage | Eco Elementum (Pty) Ltd | 10/02/2020 - 09:22 |
Heritage impact assessment for Portion14 of Ascot-JM, Ascot | 10/02/2020 - 15:42 | ||||||
Karusa walls monitoring permit report | MONITORING OF DEMOLITION OF HISTORIC STONE WALLS ON STANDVASTIGHEID 210/REM FOR THE PROPOSED KARUSA WIND ENERGY FACILITY, SUTHERLAND MAGISTERIAL DISTRICT, NORTHERN CAPE | Archaeological Permit Report | 07/02/2020 | Jayson Orton | ASHA Consulting(Pty) Ltd | ACED Renewables Hidden Valley | 10/02/2020 - 16:23 |
PHASE 1 HIA REPORT FELDSPAR MINING, FARM ROZYNEN BOSCH NO. 104, PORTIONS 4 AND 5, KAKAMAS SOUTH, NORTHERN CAPE | PROPOSED FELDSPAR PROSPECTING RIGHTS AND MINING PERMIT APPLICATION, FARM ROZYNEN BOSCH NO. 104, PORTION 4 AND 5, KAKAMAS SOUTH SETTLEMENT, KAI !GARIB MUNICIPALITY, Z.F. MGCAWU DISTRICT MUNICIPALITY, NORTHERN CAPE. | HIA Phase 1 | 07/11/2019 | Heidi Fivaz, Jan Engelbrecht, Elize Butler | UBIQUE HERITAGE CONSULTANTS | Enviroafrica CC | 11/02/2020 - 08:33 |
Badirile Extension Township Development | A REPORT ON A CULTURAL HERITAGE IMPACT ASSESSMENT FOR THE PROPOSED BADIRILE EXTENTION TOWNSHIP DEVELOPMENT, CLOSE TO RANDBURG, GAUTENG PROVINCE | HIA Phase 1 | 26/09/2018 | Anton van Vollenhoven | Archaetnos CC | Texture Environmental Consultants | 12/02/2020 - 11:06 |
LoR - Proposed Sewer Pipeline and Wetland Rehabilitation associated with Jupiter Extensions 9-16, Germiston, Ekurhuleni Municipality, Gauteng | LoR - Proposed Sewer Pipeline and Wetland Rehabilitation associated with Jupiter Extensions 9-16, Germiston, Ekurhuleni Municipality, Gauteng | HIA Letter of Exemption | 12/02/2020 | Karen Van Ryneveld | 12/02/2020 - 11:34 | ||
Vaalhoek HIA | Heritage Impact Assessment: Vaalhoek PROSPECTING RIGHT APPLICATION FOR BLACK MOUNTAIN MINING | Heritage Impact Assessment Specialist Reports | 02/09/2019 | Jennifer Kitto | PGS Heritage (Pty) Ltd | 12/02/2020 - 17:33 | |
Knowelsley Mine | A LETTER OF EXEMPTION FOR THE EXISTING KNOWESLEY MINE, NEWCASTLE, KZN | HIA Letter of Exemption | 13/02/2020 | Gavin Anderson | Umlando: Archaeological Surveys & Heritage Management | Geoff Silk Civil & Mining Consultant cc | 13/02/2020 - 09:03 |
HIA: Noenieput Pipelines | HERITAGE IMPACT ASSESSMENT In terms of Section 38(8) of the NHRA for a Proposed development of water pipelines near Noenieput, Northern Cape | HIA Phase 1 | 14/02/2020 | Jenna Lavin | CTS Heritage | Enviroworks | 14/02/2020 - 09:12 |
Umsobomvu Heritage BA Report | PROPOSED UMSOBOMVU SOLAR PV ENERGY FACILITIES Heritage Impact Report | Heritage Impact Assessment Specialist Reports | 11/11/2020 | Wouter Fourie | PGS Heritage (Pty) Ltd | SiVEST SA (Pty) Ltd | 14/02/2020 - 10:45 |
HIA Inland diesel depot Portion 5 of the Farm Franshoek No. 1861, Swinburne, Free State | A REPORT ON A CULTURAL HERITAGE IMPACT ASSESSMENT FOR A PROPOSED DEVELOPMENT OF AN INLAND DIESEL WHOLESALE DEPOT INCLUDING A TRANSPORTATION PIPELINE ON PORTION 5 OF THE FARM FRANSHOEK 1861, SWINBURNE, FREE STATE PROVINCE | Heritage Impact Assessment Specialist Reports | 10/06/2019 | Prof. Anton van Vollenhoven | Archaetnos Culture & Cultural Resource Consultants | 17/02/2020 - 10:54 |