THIS IS THE ARCHIVE FOR SAHRIS 1.0
THIS SITE IS NOW AN ARCHIVE AND IS NOT SUITABLE FOR MAKING APPLICATIONS
Please be aware that no content and application creation or changes to information on this version of SAHRIS will be retained.
To make applications or utilise SAHRIS for the creation of information, please use the new site:
https://sahris.org.za
Changes to SAHRIS!
The South African Heritage Resources Information System (SAHRIS) has undergone a generational upgrade and restructure. These changes to the site include, but are not limited to:
- A new & modernised look and layout
- Improved site usage flows with respect to applications and content creation
- Improved site performance and stability
Launch for the new version of SAHRIS occurred on Monday the 30th of October 2023.
The new site can be found here:
SAHRIS | SAHRIS
Displaying 14201 - 14250 of 18975
ReportRef | ReportTitle | ReportType | ReportDate | Authors | AuthoringBody | CommissioningCompany | Post date |
---|---|---|---|---|---|---|---|
Integrated Cultural Resources Management Study for the proposed Mfolozi-Mbewu 765KV Transmission Line | Integrated Cultural Resources Management Study and HIA for the proposed Mfolozi-Mbewu 765KV Transmission Line, Zululand and King Cetshwayo District Municipality, KwaZulu-Natal. | Heritage Impact Assessment Specialist Reports | 20/12/2018 | Cherene de Bruyn | MOKGOPE CONSULTING CC | 20/12/2018 - 13:37 | |
HIA DMS UPGRADE PROJECT | HIA DMS UPGRADE PROJECT | HIA Phase 1 | 20/12/2018 | Polke Birkholtz | PGS Heritage (Pty) Ltd | EXM Advisory Services (Pty) Ltd | 20/12/2018 - 14:21 |
HIA Report_Vorna Valley Water Pipeline | Phase 1 Cultural Heritage Impact Assessment: REPLACEMENT OF THE VORNA VALLEY EMERGENCY WATER PIPELINE, MIDRAND REGION, CITY OF JOHANNESBURG METROPOLITAN MUNICIPALITY, GAUTENG PROVINCE | HIA Phase 1 | 20/12/2018 | 25/01/2019 - 12:59 | |||
MoedingPV_PIA_Dec'18 | Palaeontological Field Assessment for the Moeding Solar PV Facility and Associated Grid Connection, North West Province | Palaeontological Specialist Reports | 20/12/2018 | Elize Butler | Banzai Environmental (Pty) Ltd | Savannah Environmental (Pty) Ltd | 14/01/2019 - 13:12 |
Grypoort Klipfontein Archaeological and Palaeontological study | Archaeological and Paleontological study of footprint area of proposed new Grypoort Klipfontein powerline. | Heritage Impact Assessment Specialist Reports | 27/12/2018 | Lloyd Rossouw | SiVEST - Durban | 10/01/2018 - 09:47 | |
Management plan - Nkomati Anthracite graves | Report 01866V - Management plan - Nkomati Anthracite graves | Conservation Management Plan | 27/12/2018 | Anton Carl | Nkomati Anthracite(Pty)Ltd | 18/03/2019 - 10:25 | |
Nkomati Anthracite Mine | A conservation Management Plan for the graves site at the Nkomati Anthracite Mine in the magisterial district of Barberton, Mpumalanga Province | Burial Grounds and Graves Specialist Reports | 27/12/2018 | Anton Carl | Archaetnos Culture & Cultural Resource Consultants | 29/10/2019 - 07:53 | |
HIA Report_Glenvista Water Pipeline | Phase 1 Cultural Heritage Impact Assessment: THE REPLACEMENT AND UPGRADE OF WATER RETICULATION PIPELINES ALONG A NUMBER OF STREETS IN GLENVISTA, JOHANNESBURG SOUTH, CITY OF JOHANNESBURG , GAUTENG PROVINCE | HIA Phase 1 | 28/12/2018 | Johan van Schalkwyk | 16/01/2019 - 10:50 | ||
HIA Report_Vorna Valley Water Pipeline | Phase 1 Cultural Heritage Impact Assessment: REPLACEMENT OF THE VORNA VALLEY EMERGENCY WATER PIPELINE, MIDRAND REGION, CITY OF JOHANNESBURG METROPOLITAN MUNICIPALITY, GAUTENG PROVINCE | HIA Phase 1 | 28/12/2018 | J.A. van Schalkwyk | 28/01/2019 - 09:54 | ||
Adistra 11 CC | Basic Assessment Report | HIA Phase 1 | 31/12/2018 | POR Sehunelo | Adistra 11 CC | Adistra 11 CC | 29/11/2018 - 14:02 |
Stellenbosch Municipal Heritage Survey - Phase 4 | HERITAGE INVENTORY OF, AND MANAGEMENT PLAN FOR, THE TANGIBLE RESOURCES IN THE STELLENBOSCH MUNICIPALITY - PHASE 4 | Heritage Study | 01/01/2019 | Liana Jansen | Cape Winelands Professional Practices in Association | Stellenbosch Municipality | 25/06/2019 - 12:09 |
REPORT ON A PHASE 1 HERITAGE IMPACT ASSESSMENT FOR THE SEFATENG CHROME MINE PROJECT 60KM NORTH-WEST OF BURGERSFORT, SEKHUKHUNE DISTRICT MUNICIPALITY | REPORT ON A PHASE 1 HERITAGE IMPACT ASSESSMENT FOR THE SEFATENG CHROME MINE PROJECT 60KM NORTH-WEST OF BURGERSFORT, SEKHUKHUNE DISTRICT MUNICIPALITY | AIA Phase 1 | 01/01/2019 | Anton Pelser | APELSER ARCHAEOLOGICAL CONSULTING | Red Kite Environmental Solutions (Pty) Ltd | 07/05/2022 - 18:22 |
Kelland Wetland Rehabilitation AIA | PHASE1: ARCHAEOLOGICAL IMPACT ASSESSMENT RELATING TO THE PROPOSED DESIGN AND CONSTRUCTION OF MITIGATION MEASURES IN FAIRLANDS AND DARRENWOOD SPRUIT AND REMEDIAL WORKS FOR THE KELLAND WETLAND, WILLOWS IN RANDBURG, GAUTENG PROVINCE, SOUTH AFRICA. | AIA Phase 1 | 06/01/2019 | Ndivhuwo Eric Mathoho | South African Heritage Resources Agency, Provincial Heritage Resources Authority Gauteng | Tholoana Sustainable Development and Environmental Consultants | 26/06/2019 - 15:06 |
HIA Dwarsug 07-01-19 | Proposed Construction of an Access Road for the Dwarsrug Wind Farm, Near Loeriesfontein Phase 1 HIA | Heritage Impact Assessment Specialist Reports | 07/01/2019 | IIan Smeyatsky | PGS Heritage (Pty) Ltd | Savannah Environmental (Pty) Ltd | 04/04/2019 - 15:59 |
HIA Phase 1 - Dwarsrug WF Access Road | P{hase 1 - Heritage Impact Assessment for the Proposed Construction of an Access Road for the Dwarsrug Wind Farm, near Loeriesfontein, Northern Cape Province | HIA Phase 1 | 07/01/2019 | PGS Heritage (Pty) Ltd | Savannah Environmental (Pty) Ltd | 14/02/2019 - 13:15 | |
PIA Report Graspan | Palaeontological Impact Assessment for the proposed prospecting rights application on farm Graspan 112 near Copperton, North West Province | PIA Desktop | 10/01/2019 | Marion Bamford | Prof Marion Bamford | ABS Africa | 07/02/2019 - 10:41 |
Mathulini AIA | PHASE I ARCHAEOLOGICAL AND CULTURAL HERITAGE IMPACT ASSESSMENT SPECIALIST REPORT FOR THE PROPOSED MATHULINI HOUSING DEVELOPMENT PROJECT AT MATHULINI VILLAGE IN UMSHWATHI LOCAL MUNICIPALITY OF UMGUNGUNDLOVU DISTRICT WITHIN KWAZULU NATAL PROVINCE | AIA Phase 1 | 11/01/2019 | Munyadziwa Magoma | Vhubvo Archaeo-Heritage Consultants | Vhubvo Archaeo-Heritage Consultants | 10/04/2019 - 08:31 |
PHASE 1 ARCHAEOLOGICAL IMPACT ASSESSMENT | PHASE 1 Archaeological Impact Assessment for the proposed Gulf service station on ERF 10742, Umhlathuze Village, Empangeni, KwaZulu-Natal | AIA Phase 1 | 13/01/2019 | Tobias Coetzee | Tobias Coetzee | 26/02/2019 - 09:39 | |
RIM Memorialisation Project - S27 assessment | Assessment of Impact In terms of Section 27(18) of the NHRA for the DEVELOPMENT OF A PROPOSED NEW VISITOR EXPERIENCE AT ROBBEN ISLAND NATIONAL HERITAGE SITE | Heritage Study | 14/01/2019 | Jenna Lavin | CTS Heritage | Robben Island Museum | 16/01/2019 - 15:30 |
FINAL HIA REPORT RELATED TO PROPOSED BUSINESS DEVELOPMENT (CITY DEEP EXT. 29) & ALTERATION PERMIT APPLICATION FOR THECITY DEEP NO.4 SHAFT HEADGEAR | FINAL HIA REPORT RELATED TO PROPOSED BUSINESS DEVELOPMENT (CITY DEEP EXT. 29) & ALTERATION PERMIT APPLICATION FOR THE CITY DEEP NO.4 SHAFT HEADGEAR LOCATED ON THE REMAINING EXTENT OF KLIPRIVIERSBERG 106IR CITY OF JOHANNESBURG METROPOLITAN MUNICIPALITY, GAUTENG - APAC019/02 | Heritage Impact Assessment Specialist Reports | 14/01/2019 | Anton Pelser | APELSER ARCHAEOLOGICAL CONSULTING | iProp Proprietary Limited | 01/02/2019 - 11:38 |
FINAL HIA REPORT RELATED TO PROPOSEDBUSINESS DEVELOPMENT (CITY DEEP EXT. 29) & DEMOLITION PERMIT APPLICATION FOR THE CURRENT OFFICE BLOCK CLOSE TO THE CITY DEEP NO.4 SHAFT HEADGEAR | FINAL HIA REPORT RELATED TO PROPOSED BUSINESS DEVELOPMENT (CITY DEEP EXT. 29) & DEMOLITION PERMIT APPLICATION FOR THE CURRENT OFFICE BLOCK CLOSE TO THE CITY DEEP NO.4 SHAFT HEADGEAR LOCATED ON THE REMAINING EXTENT OF KLIPRIVIERSBERG 106IR CITY OF JOHANNESBURG METROPOLITAN MUNICIPALITY, GAUTENG | Heritage Impact Assessment Specialist Reports | 14/01/2019 | Anton Pelser | APELSER ARCHAEOLOGICAL CONSULTING | iProp Proprietary Limited | 01/02/2019 - 11:46 |
HIA Phongola Hydro | Desktop Heritage Impact Assessment for the Proposed Development of a 4 Megawatt per hour Micro-Hydro Power Station in the Jozini Local Municipality, within the Umkhanyakude District of the KwaZulu–Natal Province. | HIA Phase 1 | 14/01/2019 | Stephan Gaigher | G & A Heritage | G & A Heritage | 14/01/2019 - 11:25 |
PHASE 1 HIA REPORT FOR THE LINDEN SCHOOL PROJECT | PHASE 1 HIA REPORT FOR THE LINDEN SCHOOL PROJECT LOCATED ON ERF 577, LINDEN CITY OF JOHANNESBURG METROPOLITAN MUNICIPALITY, GAUTENG - APAC019/06 | HIA Phase 1 | 14/01/2019 | Anton Pelser | APELSER ARCHAEOLOGICAL CONSULTING | IIE (Pty) Ltd t/a Property Division | 01/02/2019 - 12:24 |
PIA Portion 93, Rondebosch 403 JS | Palaeontological Impact Assessment: Phase 1 Field Study: The Development of a Residential Area on a Portion of Portion 93 of the Farm Rondebosch 403 JS, Middelburg, Mpumalanga Province. | PIA Phase 1 | 14/01/2019 | Dr. Heidi Fourie | Dr Heidi Fourie | AdiEnvironmental cc | 28/01/2019 - 12:56 |
Ogle Farm Heritage Impact Assessment | Phase one cultural Heritage Impact Assessment of the proposed Ogle Farm mixed-use development, within the uBuhlebezwe local and Harry Gwala District Municipalities. | HIA Phase 1 | 14/01/2019 | Frans Prins | Active Heritage CC | Kerry Seppings Environmental Management | 10/01/2019 - 09:36 |
Heritage Report - Graspan Prospecting, Northern Cape Province. | HERITAGE DESKTOP REPORT FOR THE PROPOSED ORION NO 5 PROSPECTING APPLICATION ON THE FARMS GRASPAN AND UITSPAN, COPPERTON AREA, NORTHERN CAPE PROVINCE | Heritage Scoping | 15/01/2019 | Jaco van der Walt | Heritage Contracts and Archaeological Consulting | ABS Africa | 07/02/2019 - 10:35 |
PROPOSED DEVELOPMENT OF DAMS AND ORCHARDS ON PORTION 7 OF THE FARM TWISTWYK NO. 182, CALEDON REGISTRATION DIVISION, RIVIERSONDEREND | HIA: PROPOSED DEVELOPMENT OF DAMS AND ORCHARDS ON PORTION 7 OF THE FARM TWISTWYK NO. 182, CALEDON REGISTRATION DIVISION, RIVIERSONDEREND. | HIA Phase 1 | 15/01/2019 | Jenna Lavin | CTS Heritage | Cornerstone Consultants | 28/09/2020 - 12:39 |
Hesters Rust Cultural Heritage Impact Assessment | Cultural Heritage Impact Assessment: Phase 1 Investigation for the Amendment of an Existing Environmental Authorisation for an Existing Mining Right of Corobrik (Pty) Ltd (Odendaalsrus Factory) on the Farm Hesters Rust 29, near Welkom, Matjhabeng Local Municipality and Lejweleputswa District Municipality, Free State Province | HIA Phase 1 | 16/01/2019 | Francois Coetzee | 21/02/2019 - 12:48 | ||
LETTER OF RECOMMENDATION FOR EXEMPTION | LETTER OF RECOMMENDATION FOR EXEMPTION: MINING PERMIT APPLICATION FOR THE REMOVAL OF DIAMONDS ALLUVIAL AND DIAMONDS KIMBERLITE ON A CERTAIN PORTION OF THE FARM VAN ZOELEN’S LAAGTE 158, FRANCES BAARD LOCAL MUNICIPALITY, NORTHERN CAPE PROVINCE. | HIA Letter of Exemption | 16/01/2019 | J.A. van Schalkwyk | 18/01/2019 - 09:20 | ||
Lanele Liquid Fuel Storage Facility | Heritage Impact Assessment Report Proposed Lanele Liquid Fuel Storage Facility, Terminal 1. Lot 1, Ambrose Park, Bayhead Durban Harbour eThekweni Municipality | HIA Phase 1 | 16/01/2019 | Len van Schalkwyk | eThembeni Cultural Heritage | Golder Associates Africa (Pty) Ltd | 08/03/2019 - 15:03 |
Great Karoo WEF - Heritage Screener (Jan'19) | Heritage Screener for the Proposed Amendment to the Great Karoo Wind Farm to be located on Farm Kentucky 206 and Portion 1 of Farm Wolvenkop 207, Northern Cape | Heritage Impact Assessment Specialist Reports | 17/01/2019 | CTS Heritage | Savannah Environmental (Pty) Ltd | 25/04/2019 - 10:43 | |
Heritage report for the Proposed Welgedacht Coal Prospecting Right and Environmental Authorisation Application, Gauteng Province, South Africa | Heritage report for the Proposed Welgedacht Coal Prospecting Right and Environmental Authorisation Application, Gauteng Province, South Africa | Heritage Scoping | 19/01/2019 | Jaco van der Walt | Heritage Contracts and Archaeological Consulting | Enviro-Insight CC | 08/02/2019 - 22:28 |
Palaeontological Impact Assessment | Palaeontological Impact Assessment for the proposed mine prospecting application for Farm Schmidtsdrif 248 portion 1, Herbert District, Northern Cape Province | PIA Desktop | 20/01/2019 | Marion Bamford | Nyezi Holdings (Pty) Ltd | 21/01/2019 - 13:46 | |
HIA Report_Alan Manor Water Pipeline | Phase 1 Cultural Heritage Impact Assessment: THE REPLACEMENT AND UPGRADE OF WATER RETICULATION PIPELINES ALONG A NUMBER OF STREETS IN ALAN MANOR, JOHANNESBURG SOUTH, CITY OF JOHANNESBURG METROPOLITAN MUNICIPALITY, GAUTENG PROVINCE | HIA Phase 1 | 20/01/2019 | Johan van Schalkwyk | 21/02/2019 - 09:01 | ||
HERITAGE IMPACT ASSESSMENT: of Scoping and Environmental Impact Assessment For the Proposed Development of the 300 MW Paulputs Solar PV Energy Facility on Konkoonsies 91/2/rem and 91/5 near Pofadder, in the Khaî-Ma Local Municipality. | HERITAGE IMPACT ASSESSMENT: Scoping and Environmental Impact Assessment For the Proposed Development of the 300 MW Paulputs Solar PV Energy Facility on Konkoonsies 91/2/rem and 91/5 near Pofadder, in the Khaî-Ma Local Municipality (Kenhardt Magisterial District, Northern Cape Province). SAHRA Case Nos: 12580 (Paulputs PV1), 12581 (Paulputs PV2) & 12582 (Paulputs PV3) Required under Section 38 (8) of the National Heritage Resources Act (No. 25 of 1999). | Heritage Impact Assessment Specialist Reports | 21/01/2019 | Jayson Orton, John E Almond | South African Heritage Resources Agency | GAEA ENVIRO PTY LTD | 21/01/2019 - 12:38 |
HERITAGE IMPACT ASSESSMENT: Of Scoping and Environmental Impact Assessment For the Proposed Development of the 300 MW Paulputs Solar PV Energy Facility on Konkoonsies 91/2/rem and 91/5 near Pofadder. | HERITAGE IMPACT ASSESSMENT: Scoping and Environmental Impact Assessment For the Proposed Development of the 300 MW Paulputs Solar PV Energy Facility on Konkoonsies 91/2/rem and 91/5 near Pofadder, in the Khaî-Ma Local Municipality (Kenhardt Magisterial District, Northern Cape Province). SAHRA Case Nos: 12580 (Paulputs PV1), 12581 (Paulputs PV2) & 12582 (Paulputs PV3) Required under Section 38 (8) of the National Heritage Resources Act (No. 25 of 1999). | Heritage Impact Assessment Specialist Reports | 21/01/2019 | Jayson Orton, John E Almond | South African Heritage Resources Agency | GAEA ENVIRO PTY LTD | 21/01/2019 - 13:37 |
Archaeological and cultural heritage impact assessment report for the proposed upgrade and construction of Qhozo access road. | Phase 1 Archaeological and cultural heritage impact assessment report for the proposed upgrade and construction, which entails installation of storm-water management system and crossings within Qhozo access road in Bergville within Okhahlamba Local Municipality of uThukela District Municipality in KwaZulu-Natal Province. | Heritage Impact Assessment Specialist Reports | 21/01/2019 | Munyadziwa Magoma | Vhubvo Archaeo-Heritage Consultants | Isolendalo Environmental Consulting | 18/02/2019 - 09:05 |
HERITAGE IMPACT ASSESSMENT: Of Scoping and Environmental Impact Assessment For the Proposed Development of the 300 MW Paulputs Solar PV Energy Facility on Konkoonsies 91/2/rem and 91/5 near Pofadder. | HERITAGE IMPACT ASSESSMENT: Scoping and Environmental Impact Assessment For the Proposed Development of the 300 MW Paulputs Solar PV Energy Facility on Konkoonsies 91/2/rem and 91/5 near Pofadder, in the Khaî-Ma Local Municipality (Kenhardt Magisterial District, Northern Cape Province). SAHRA Case Nos: 12580 (Paulputs PV1), 12581 (Paulputs PV2) & 12582 (Paulputs PV3) Required under Section 38 (8) of the National Heritage Resources Act (No. 25 of 1999). | Heritage Impact Assessment Specialist Reports | 21/01/2019 | Jayson Orton, John E Almond | South African Heritage Resources Agency | GAEA ENVIRO PTY LTD | 21/01/2019 - 15:32 |
Heritage Impact Assessment for Erf 168 Rembrandt Park | Heritage Impact Assessment for Erf 168 Rembrandt Park | HIA Phase 1 | 21/01/2019 | Jaco van der Walt | Heritage Contracts and Archaeological Consulting | HUGO ROSSOUW CONSULTING (PTY) LTD | 21/01/2019 - 21:15 |
HIA | 1st Phase Heritage Impact Assessment: THE PROPOSED RONDEBULT OUTFALL SEWER LINE. | HIA Phase 1 | 22/01/2019 | Sidney Miller | 20/04/2022 - 15:54 | ||
Phase 1 Heritage Impact Assessment of an existing feedlot on the farm Wanga Nella 994 near Aliwal North, FS Province. | Phase 1 Heritage Impact Assessment of an existing feedlot on the farm Wanga Nella 994 near Aliwal North, FS Province. | HIA Phase 1 | 24/01/2019 | Lloyd Rossouw | SAHRA Council | Paleo Field Services | 05/03/2019 - 11:23 |
Hayfields Fuelling & Service Station: Phase 1: Heritage Impact Assessment o | Phase 1: Heritage Impact Assessment of the proposed Hayfields Filling Station, Umgungundlovu Municipality, KZN. | HIA Phase 1 | 25/01/2019 | Frans Prins | Active Heritage CC | Hanslab (Pty) Ltd | 21/05/2020 - 14:50 |
AIA ON A PORTION OF KROONDAL 304JQ FOR THE PROPOSED KROONDAL HERITAGE AND GRAVES ASSESSMENT AT THE GLENCORE KROONDAL MINE, NORTH WEST PROVINCE | ARCHAEOLOGICAL IMPACT ASSESSMENT (AIA) OF DEMARACTED AREAS ON A PORTION OF KROONDAL 304JQ FOR THE PROPOSED KROONDAL HERITAGE AND GRAVES ASSESSMENT AT THE GLENCORE KROONDAL MINE, NORTH WEST PROVINCE | AIA Phase 1 | 25/01/2019 | Neels Kruger | Exigo Sustainability | Glencore Operations South Africa (Pty) Ltd | 20/01/2020 - 13:50 |
FULL PALAEONTOLOGICAL HERITAGE IMPACT ASSESSMENT REPORT IN RESPECT OF A COAL MINE (KRANSPAN COLLIERY) PROPOSED TO BE LOCATED ON THE FARM KRANSPAN 49 IT, APPROXIMATELY 12.5 KM SOUTHWEST OF CAROLINA, MPUMALANGA PROVINCE | FULL PALAEONTOLOGICAL HERITAGE IMPACT ASSESSMENT REPORT IN RESPECT OF A COAL MINE (KRANSPAN COLLIERY) PROPOSED TO BE LOCATED ON THE FARM KRANSPAN 49 IT, APPROXIMATELY 12.5 KM SOUTHWEST OF CAROLINA, MPUMALANGA PROVINCE | PIA Phase 1 | 26/01/2019 | Barry Millsteed | BM Geological Services | ABS Africa | 02/08/2019 - 12:23 |
AIA FOR THE SANPARKS MAPUNGUBWE SECTION 24G PROJECT, VHEMBE DISTRICT MUNICIPALITY, LIMPOPO PROVINC | ARCHAEOLOGICAL IMPACT ASSESSMENT (AIA) FOR THE PROPOSED SANPARKS MAPUNGUBWE SECTION 24G PROJECT ON A PORTION OF THE FARM HAMILTON 41MS, MAPUNGUBWE NATIONAL PARK, VHEMBE DISTRICT MUNICIPALITY, LIMPOPO PROVINCE | AIA Phase 1 | 28/01/2019 | Neels Kruger | Exigo Sustainability | Delron Environmental Assessment Practitioners | 18/02/2019 - 11:24 |
HIA Scoping | HERITAGE IMPACT ASSESSMENT: PROPOSED PAULPUTS WIND ENERGY FACILITY AND ASSOCIATED GRID CONNECTION NEAR POFADDER, KENHARDT MAGISTERIAL DISTRICT, NORTHERN CAPE SCOPING PHASE | Heritage Scoping | 28/01/2019 | Jayson Orton | ASHA Consulting(Pty) Ltd | Arcus Consulting | 21/02/2019 - 09:30 |
Area 8 pit extension, Somkhele Mine | Area 8 pit extension, Somkhele Mine near Mtubatuba, KwaZulu-Natal | HIA Phase 1 | 29/01/2019 | Jean Beater | JLB Consulting | GCS Water and Environmental Consultants - Durban | 29/01/2019 - 15:34 |
JAW7146_G292_Alexander_PIA | Sasol South Africa (Pty) Ltd. Alexander Mining Project. Palaeontological Impact Assessment: Phase 1 Field Study | PIA Phase 1 | 30/01/2019 | Dr. Heidi Fourie | Die Erfenisstigting, Jones & Wagener Engineering and Environmental Consultants | 26/08/2022 - 10:25 | |
LETTER OF RECOMMENDATION FOR THE EXEMPTION OF A FULL PHASE 1 ARCHAEOLOGICAL HERITAGE IMPACT ASSESSMENT ON PORTION OF PORTION 6, 10 AND 40 OF THE FARM T’ZOETGENEUGD 192 IN THE SUNDAY’S RIVER VALLEY LOCAL MUNICIPALITY | A REVISED LETTER OF RECOMMENDATION (WITH CONDITIONS) FOR THE EXEMPTION OF A FULL PHASE 1 ARCHAEOLOGICAL HERITAGE IMPACT ASSESSMENT FOR THE PROPOSED CONSTRUCTION AND OPERATION OF 6 BREEDER HOUSE FACILITIES ON A PORTION OF PORTION 6, 10 AND 40 OF THE FARM T’ZOETGENEUGD 192 IN THE SUNDAY’S RIVER VALLEY LOCAL MUNICIPALITY OF THE EASTERN CAPE PROVINCE | HIA Letter of Exemption | 30/01/2019 | Johan Binneman | Eastern Cape Heritage Consultants | Public Process Consultants | 09/12/2022 - 14:40 |
HIA - Pikitup Marlboro | Phase 1 Cultural Heritage Impact Assessment: THE DEVELOPMENT OF A WASTE MANAGEMENT FACILITY ON ERVEN 892/893 & 898/899, MARLBORO, CITY OF JOHANNESBURG METROPOLITAN MUNICIPALITY, GAUTENG PROVINCE. | HIA Phase 1 | 30/01/2019 | Johnny van Schalkwyk | JA van Schalkwyk Heritage Consultant | Envirolution Consulting (Pty) Ltd | 30/05/2019 - 09:53 |