THIS IS THE ARCHIVE FOR SAHRIS 1.0
THIS SITE IS NOW AN ARCHIVE AND IS NOT SUITABLE FOR MAKING APPLICATIONS
Please be aware that no content and application creation or changes to information on this version of SAHRIS will be retained.
To make applications or utilise SAHRIS for the creation of information, please use the new site:
https://sahris.org.za
Changes to SAHRIS!
The South African Heritage Resources Information System (SAHRIS) has undergone a generational upgrade and restructure. These changes to the site include, but are not limited to:
- A new & modernised look and layout
- Improved site usage flows with respect to applications and content creation
- Improved site performance and stability
Launch for the new version of SAHRIS occurred on Monday the 30th of October 2023.
The new site can be found here:
SAHRIS | SAHRIS
Displaying 14351 - 14400 of 18975
ReportRef | ReportTitle | ReportType | ReportDate | Authors | AuthoringBody | CommissioningCompany | MapID < 2009 | Post date |
---|---|---|---|---|---|---|---|---|
9-2-274-0002-20070701-NHS | Phase 1 Cultural and Archaeological Heritage Assessment Study for the Proposed Thabina Regional Water Scheme Pipeline in Greater Tzaneen Local Municipality, Limpopo Province | AIA Phase 1 | 01/07/2007 | McEdward Murimbika, M Mabuda | Nzumbululo Heritage Solutions | MAPID_01031 | 16/06/2012 - 14:41 | |
AIA_Malamulele_Township_Murimbika_M_Sep08 | Phase 1 Cultural and Archaeological Heritage Impact Assessment Specialist Study for the Proposed Township Establishment at Malamulele in the Thulamela Local Municipality of Vhembe District, Limpopo Province | AIA Phase 1 | 01/09/2008 | McEdward Murimbika | Nzumbululo Heritage Solutions | MAPID_02120 | 16/06/2012 - 14:47 | |
Phase 1 Cultural Heritage Assessment: THE DEVELOPMENT OF THE PROPOSED MOGALE EXTENSIONS 42, 43 AND 44 TOWNSHIPS | Phase 1 Cultural Heritage Assessment: THE DEVELOPMENT OF THE PROPOSED MOGALE EXTENSIONS 42, 43 AND 44 TOWNSHIPS ON THE FARM NOOITGEDACHT 534JQ, MULDERSDRIFT REGION, MOGALE CITY LOCAL MUNICIPALITY, GAUTENG PROVINCE | HIA Phase 1 | 01/09/2019 | Johnny van Schalkwyk | J A van Schalkwyk | Batho Earth Social and Environmental Consultants | 24/03/2021 - 13:33 | |
Phase 1 HIA for the Theta Project | Phase 1 Cultural Heritage Assessment: AMENDMENT TO AN ENVIRONMENTAL AUTHORISATION FOR THE PROPOSED THETA PROJECT, NEAR PILGRIM’S REST, MPUMALANGA | HIA Phase 1 | 30/09/2019 | J.A. van Schalkwyk | J A van Schalkwyk | Batho Earth Social and Environmental Consultants | 31/07/2020 - 15:00 | |
HIA: La Reys Prospecting | Phase 1 Cultural Heritage Assessment: Application of Prospecting with Bulk Sampling of diamonds on portion 2 of the farm La Reys 530IO, Lichtenburg Region, Ditsobotla Local Municipality, North West Province. | HIA Phase 1 | 01/05/2018 | J.A. van Schalkwyk | Archean Resources | 13/07/2018 - 15:11 | ||
Phase 1 Cultural Heritage Impact Assessment - THE PROPOSED UPGRADE OF THE MONTANA SPRUIT CHANNEL WITHIN THE DOORNPOORT AND MONTANA PARK RESIDENTIAL AREA, NORTH OF PRETORIA, GAUTENG PROVINCE | Phase 1 Cultural Heritage Impact Assessment - THE PROPOSED UPGRADE OF THE MONTANA SPRUIT CHANNEL WITHIN THE DOORNPOORT AND MONTANA PARK RESIDENTIAL AREA, NORTH OF PRETORIA, GAUTENG PROVINCE | HIA Phase 1 | 30/04/2019 | Johnny van Schalkwyk | JA van Schalkwyk Heritage Consultant | TGM Environmental Services CC | 15/11/2019 - 12:06 | |
Phase 1 Cultural Heritage Impact Assessment:Lwenzhe Resources-10549pr | Phase 1 Cultural Heritage Impact Assessment for :THE PROPOSED PROSPECTING RIGHTS APPLICATION OF COAL, SITUATED ON THE FARMS KLIPPOORTJE 187IR AND LANGLAAGTE 186IR, SEDIBENG DISTRICT MUNICIPALITY, GAUTENG PROVINCE-LWENZHE RESOURCES-10549 PR | HIA Phase 1 | 31/05/2019 | J.A. van Schalkwyk | Lwenzhe Resources & Exploration | 05/08/2019 - 15:23 | ||
HIA for Bryantson Ext.3-B | Phase 1 Cultural Heritage Impact Assessment for Btaynston Ext. 3-B | HIA Phase 1 | 31/01/2020 | J.A. van Schalkwyk | GA Environment (Pty) Ltd | GA Environment (Pty) Ltd | 26/02/2020 - 17:54 | |
Croydon/Germiston River Crossings HIA | Phase 1 Cultural Heritage Impact Assessment for THE PROPOSED CONSTRUCTION OF RIVER CROSSINGS ALONG UNDERGROUND HV FEEDER CABLES IN GERMISTON AND CROYDON, EKURHULENI DISTRICT MUNICIPALITY, GAUTENG PROVINCE | HIA Phase 1 | 15/12/2017 | 20/02/2018 - 10:51 | ||||
Randburg River Crossings HIA | Phase 1 Cultural Heritage Impact Assessment for THE PROPOSED CONSTRUCTION OF RIVER CROSSINGS ALONG UNDERGROUND HV FEEDER CABLES IN RANDBURG, CITY OF JOHANNESBURG DISTRICT MUNICIPALITY, GAUTENG PROVINCE | HIA Phase 1 | 15/12/2017 | J.A. van Schalkwyk | 20/02/2018 - 10:29 | |||
Craighall/Sandton River Crossings HIA | Phase 1 Cultural Heritage Impact Assessment for THE PROPOSED CONSTRUCTION OF RIVER CROSSINGS ALONG UNDERGROUND HV FEEDER CABLES IN SANDTON AND GRAIGHALL, CITY OF JOHANNESBURG DISTRICT MUNICIPALITY, GAUTENG PROVINCE | HIA Phase 1 | 15/12/2017 | J.A. van Schalkwyk | 20/02/2018 - 10:12 | |||
Phase 1 Cultural Heritage Impact Assessment-Firham Platrand | Phase 1 Cultural Heritage Impact Assessment for the Proposed Firham-Platrand 88kV Powerline Deviation, Standerton Region. | HIA Phase 1 | 01/11/2017 | JA van Schalkwyk Heritage Consultant | 24/05/2018 - 16:32 | |||
Phase 1 Cultural Heritage Impact Assessment | PHASE 1 CULTURAL HERITAGE IMPACT ASSESSMENT FOR THE PROPOSED MINING RIGHT APPLICATION FOR THE MINING OF DIAMONDS GENERAL (D) ON VARIOUS PORTIONS OF THE FARMS STERKFONTEIN 155, PUTFONTEIN 62, OMEGA 478, HOLGAT 63, WILDFONTEIN 201, LEEUWFONTEIN 64 AND FARM 533, REGISTRATION DIVISION: IP, DITSOBOTLA LOCAL MUNICIPALITY, NORTH WEST PROVINCE | HIA Phase 1 | 20/10/2021 | Johny | J A van Schalkwyk | Milnex | 26/11/2021 - 07:50 | |
HIA Oshoek Land Port Entry | Phase 1 Cultural Heritage Impact Assessment for the proposed upgrade of the Oshoek Land Port Entry, Swaziland Border | HIA Phase 1 | 01/01/2018 | Johnny van Schalkwyk | Delta Built Environment Consultants | 13/07/2021 - 14:39 | ||
SKYWALK HERITAGE IMPACT ASSESSMENT REPORT | PHASE 1 CULTURAL HERITAGE IMPACT ASSESSMENT FOR THE THE PROPOSED SKYWALK PROJECT- GOD’S WINDOW | HIA Phase 1 | 01/08/2013 | Mamoluoane Seliane | Strategic Environmental Focus (Pty) Ltd - Pretoria | Mpumalanga Tourism and Parks Agency | 05/02/2015 - 16:00 | |
AIA_Boschkop_Solar_Seliane_M_Nov11 | Phase 1 Cultural Heritage Impact Assessment of the Proposed Boschkop Farm Solar Energy Plant, near Jacobsdal, Free State Province | AIA Phase 1 | 01/11/2011 | Mamoluoane Seliane | Strategic Environmental Focus (Pty) Ltd - Pretoria | 16/06/2012 - 14:43 | ||
Department of Defence (DoD) Intelligence HIA | Phase 1 Cultural Heritage Impact Assessment of the proposed Head quarters office complex construction of the Department of Defence Intelligence at the South African National Intelligence College (SADIC), Pretoria Gauteng | HIA Phase 1 | 01/08/2010 | Strategic Environmental Focus (Pty) Ltd - Pretoria | 01/03/2016 - 13:05 | |||
Inyanga Energy Project 8 | Phase 1 Cultural Heritage Impact Assessment of the proposed Inyanga Energy Project 8 Solar Plant to be constructed on the Farm Boschkop, near Jacobsdal, Free State Province | AIA Phase 1 | 01/01/2012 | Mamoluoane Seliane | Strategic Environmental Focus (Pty) Ltd - Pretoria | Transalloys (Pty) Ltd | 15/08/2012 - 15:57 | |
AIA_Mbizana_bulkwater_pipeline_Seliane_M_Mar11 | Phase 1 Cultural Heritage Impact Assessment of the proposed Mbizana Bulkwater pipeline, Mbizana Local Municipality, Eastern Cape | AIA Phase 1 | 30/03/2011 | Mamoluoane Seliane | Strategic Environmental Focus (Pty) Ltd - Pretoria | 16/06/2012 - 14:47 | ||
Olam Energy Project 10 | Phase 1 Cultural Heritage Impact Assessment of the proposed Olam Energy Project 10 Solar Plant on the Farm Boschkop, near Jacobsdal, Free State Province | AIA Phase 1 | 01/11/2011 | Mamoluoane Seliane | Strategic Environmental Focus (Pty) Ltd - Pretoria | Transalloys (Pty) Ltd | 15/08/2012 - 15:41 | |
HIA report Doornkraal 680 LS Ptn 98. Polokwane | Phase 1 Cultural Heritage Impact Assessment Report. Application for Transformation of Land from Agriculture or Forestation on Portion 98 of the Farm Doornkraal 680 LS. Polokwane Local Municipality, Capricorn District, Limpopo Province | HIA Phase 1 | 31/05/2022 | Frans Roodt | Kamekho Consulting CC | 31/05/2022 - 17:47 | ||
HIA report Southern Gateway residential development Polokwane | Phase 1 Cultural Heritage Impact Assessment Report. Proposed Southern Gateway Residential Development Polokwane Local Municipality Capricorn District Limpopo Province | Heritage Impact Assessment Specialist Reports | 28/10/2022 | Frans Roodt | EScience Associates (Pty) Ltd | 28/10/2022 - 14:44 | ||
Phase1 Cultural Heritage Impact Assessment | Phase 1 Cultural Heritage Impact Assessment. The Proposed Establishment of the Monument Park Ext 15 township on a portion of Portion 27 of the farm Waterkloof 378JR, City of Tshwane Metropolitan Municipality, Gauteng province | HIA Phase 1 | 18/07/2018 | Johnny Van Schalkwyk | JA van Schalkwyk Heritage Consultant | J Paul van Wyk | 18/07/2018 - 14:24 | |
Boschmanskop HIA report | Phase 1 Cultural Heritage Impact Assessment: THE CONSTRUCTION OF A 132KV CHIKADEE POWER LINE ON THE FARM BOSCHMANSKOP 154IS, SOUTH OF MIDDELBURG, STEVE TSHWETE LOCAL MUNICIPALITY, MPUMALANGA PROVINCE | HIA Phase 1 | 29/12/2017 | Johnny Van Schalkwyk | Envirolution Consulting (Pty) Ltd | 18/01/2018 - 09:32 | ||
Woestalleen HIA report | Phase 1 Cultural Heritage Impact Assessment: THE CONSTRUCTION OF A 132KV CHIKADEE POWER LINE ON THE FARM WOESTALLEEN 477JS, SOUTHEAST OF MIDDELBURG, STEVE TSHWETE LOCAL MUNICIPALITY, MPUMALANGA PROVINCE | HIA Phase 1 | 29/12/2017 | Johnny Van Schalkwyk | Envirolution Consulting (Pty) Ltd | 18/01/2018 - 09:50 | ||
HIA - Pikitup Kaalfontein | Phase 1 Cultural Heritage Impact Assessment: THE DEVELOPMENT OF A WASTE MANAGEMENT FACILITY ON ERF 6049, KAALFONTEIN, MIDRAND REGION, CITY OF JOHANNESBURG METROPOLITAN MUNICIPALITY, GAUTENG PROVINCE | HIA Phase 1 | 30/01/2019 | J.A. van Schalkwyk | JA van Schalkwyk Heritage Consultant | Envirolution Consulting (Pty) Ltd | 24/05/2019 - 08:48 | |
HIA - Pikitup Marlboro | Phase 1 Cultural Heritage Impact Assessment: THE DEVELOPMENT OF A WASTE MANAGEMENT FACILITY ON ERVEN 892/893 & 898/899, MARLBORO, CITY OF JOHANNESBURG METROPOLITAN MUNICIPALITY, GAUTENG PROVINCE. | HIA Phase 1 | 30/01/2019 | Johnny van Schalkwyk | JA van Schalkwyk Heritage Consultant | Envirolution Consulting (Pty) Ltd | 30/05/2019 - 09:53 | |
HIA - Pikitup Sandpark | Phase 1 Cultural Heritage Impact Assessment: THE DEVELOPMENT OF A WASTE MANAGEMENT FACILITY ON HOLDING 2, SAND PARK, RANDBURG REGION, CITY OF JOHANNESBURG METROPOLITAN MUNICIPALITY, GAUTENG PROVINCE | HIA Phase 1 | 30/01/2019 | Johnny van Schalkwyk | JA van Schalkwyk Heritage Consultant | Envirolution Consulting (Pty) Ltd | 30/05/2019 - 10:20 | |
Laudium HIA report | Phase 1 Cultural Heritage Impact Assessment: THE PROPOSED CONSTUCTION OF A HINDU TEMPLE IN LAUDIUM, CITY OF TSHWANE LOCAL MUNICIPALITY, GAUTENG PROVINCE | HIA Phase 1 | 31/10/2017 | J.A. van Schalkwyk | JA van Schalkwyk Heritage Consultant | Envirolution Consulting (Pty) Ltd | 08/02/2019 - 10:59 | |
Fochville Powerline Heritage Impact Assessment | Phase 1 Cultural Heritage Impact Assessment: THE PROPOSED CONSTUCTION OF THE FOCHVILLE 132KV POWER LINE, GAUTENG PROVINCE. | 30/05/2017 | Johnny Van Schalkwyk | 16/03/2018 - 09:07 | ||||
Lenasia South Reservoir HIA Report | Phase 1 Cultural Heritage Impact Assessment: THE PROPOSED DEVELOPMENT OF A NEW CONCRETE WATER RESERVOIR CLOSE TO LENASIA SOUTH, CITY OF JOHANNESBURG METROPOLITAN MUNICIPALITY, GAUTENG PROVINCE | HIA Phase 1 | 28/09/2018 | Johnny van Schalkwyk | JA van Schalkwyk Heritage Consultant | Envirolution Consulting (Pty) Ltd | 04/02/2019 - 09:37 | |
Lenasia South Reservoir HIA Report | Phase 1 Cultural Heritage Impact Assessment: THE PROPOSED DEVELOPMENT OF A NEW CONCRETE WATER RESERVOIR CLOSE TO LENASIA SOUTH, CITY OF JOHANNESBURG METROPOLITAN MUNICIPALITY, GAUTENG PROVINCE | 28/09/2018 | Johnny van Schalkwyk | JA van Schalkwyk Heritage Consultant | Envirolution Consulting (Pty) Ltd | 04/02/2019 - 15:25 | ||
Heritage Report N11 | Phase 1 Cultural Heritage Impact Assessment: THE PROPOSED REALIGNMENT OF NATIONAL ROUTE 11, SECTION 4, SOUTH OF O’NEILL’S COTTAGE (KM 34.3) TO KWAGGASNEK (KM 39.0), AMAJUBA DISTRICT MUNICIPALITY, KWAZULU-NATAL PROVINCE | HIA Phase 1 | 09/11/2020 | Johnny van Schalkwyk | Chameleon Environmental | 09/11/2020 - 15:53 | ||
HIA Stormvoel to Baviaanspoort Road including the Moepel Road Overpass | Phase 1 Cultural Heritage Impact Assessment: THE PROPOSED UPGRADING OF PROVINCIAL ROAD R573 (MOLOTO ROAD) AND K139, AS WELL AS THE MOEPEL ROAD OVERPASS, NORTH OF PRETORIA, GAUTENG PROVINCE | HIA Phase 1 | 30/06/2020 | J van Schalkwyk | JA van Schalkwyk Heritage Consultant | GA Environment (Pty) Ltd | 10/07/2020 - 15:55 | |
Padda Dam HIA Report | Phase 1 Cultural Heritage Impact Assessment: THE REHABILITATION OF PADDA DAM, WESTDENE/MELVILLE REGION OF THE CITY OF JOHANNESBURG METROPOLITAN MUNICIPALITY, GAUTENG PROVINCE | HIA Phase 1 | 01/05/2020 | 03/08/2020 - 15:59 | ||||
Amended The Whisken HIA Report | Phase 1 Cultural Heritage Impact Assessment: CULTURAL HERITAGE IMPACT ASSESSMENT FOR THE PROPOSED DEVELOPMENT AT THE WHISKEN, SITUATED ON PORTIONS OF THE FARM WITPOORTJIE 406JR, CITY OF JOHANNESBURG METROPOLITAN MUNICIPALITY, GAUTENG PROVINCE | HIA Phase 1 | 20/02/2018 | Johnny Van Schalkwyk | Gauteng Department of Agriculture and Rural Development | Balwin Properties (Pty) Ltd | 15/06/2018 - 10:33 | |
Phase 1 Cultural Heritage Impact Assessment: | Phase 1 Cultural Heritage Impact Assessment: ENVIRONMENTAL IMPACT ASSESSMENT (SCOPING AND EIR-PHASE) FOR THE PROPOSED PROSPECTING RIGHT APPLICATION TO PROSPECT FOR DIAMONDS ALLUVIAL (DA), DIAMONDS GENERAL (D) AND DIAMONDS (DIA) NEAR WOLMARANSSTAD ON PORTION 8, 16, 19, 21, 22 AND 27 OF THE FARM KATBOSCHFONTEIN 164, REGISTRATION DIVISION: HO, NORTH WEST PROVINCE | HIA Phase 1 | 26/09/2023 | Johnny van Schalkwyk | 28/09/2023 - 13:34 | |||
Phase 1 Cultural Heritage Impact Assessment Mosikwe | Phase 1 Cultural Heritage Impact Assessment: MINING RIGHT APPLICATION OF CHROME ORE ON THE FARM BAKHOUTRANTJE 205JP, NEAR PILANESBERG, MOSES KOTANE LOCAL MUNICIPALITY, BOJANALA MUNICIPAL DISTRICT,NORTH WEST PROVINCE | HIA Phase 1 | 31/03/2019 | Johnny van Schalkwyk | 05/07/2021 - 15:09 | |||
Phase 1 Cultural HEritage Impact Assessment - Johan Smit - NC12359PR (00140PR//102) | Phase 1 Cultural Heritage Impact Assessment: PROSPECTING RIGHT APPLICATION WITH BULK SAMPLING ON VARIOUS PORTIONS OF THE FARMS ZONDERHUIS 402, ONDER PLAATS 401 AND NAMAKWARI 656, SIYANDA DISTRICT MUNICIPALITY, NORTHERN CAPE PROVINCE | HIA Phase 1 | 01/12/2019 | J A van Schalkwyk | J A van Schalkwyk | 19/10/2023 - 12:56 | ||
Phase 1 Cultural Heritage Impact Assessment: Heuningkrans 137 | Phase 1 Cultural Heritage Impact Assessment: PROSPECTING RIGHT OF DIAMOND ALLUVIAL AND DIAMOND GENERAL ON PORTION 2 OF THE FARM HEUNINGKRANS 137HP, DR KENNETH KAUNDA DISTRICT MUNICIPALITY, NORTH WEST PROVINCE | HIA Phase 1 | 16/04/2018 | Johnny van Schalkwyk | 23/04/2018 - 11:02 | |||
Phase 1 Cultural Heritage Impact Assessment: Mimosa 61 | Phase 1 Cultural Heritage Impact Assessment: PROSPECTING RIGHT OF DIAMOND ALLUVIAL AND DIAMOND GENERAL ON THE REMAINING EXTENT OF PORTION 23 OF THE FARM MIMOSA, NEAR SCHWEIZER-RENEKE, MAMUSA LOCAL MUNICIPALITY, NORTH WEST PROVINCE | HIA Phase 1 | 03/04/2018 | Johnny van Schalkwyk | 09/04/2018 - 12:37 | |||
HIA for Rosaly Farms Vaalwater | Phase 1 Cultural Heritage Impact Assessment: RECTIFICATION APPLICATION FOR THE CONSTRUCTION OF A CATTLE FEEDLOT ON THE FARM DEMILANDER 273, MARQUARD REGION, SETSOTO LOCAL MUNICIPALITY, FREE STATE PROVINCE | HIA Phase 1 | 07/06/2022 | J A van Schalkwyk | J A van Schalkwyk | SPOOR Environmental Services (PTY) Ltd. | 12/07/2022 - 20:49 | |
Phase 1 Cultural Heritage Impact Assessment: Demilander 273 Feedlot | Phase 1 Cultural Heritage Impact Assessment: RECTIFICATION APPLICATION FOR THE CONSTRUCTION OF A CATTLE FEEDLOT ON THE FARM DEMILANDER 273, MARQUARD REGION, SETSOTO LOCAL MUNICIPALITY, FREE STATE PROVINCE | HIA Phase 1 | 17/06/2022 | Johnny van Schalkwyk | SPOOR Environmental Services (PTY) Ltd. | 12/07/2022 - 21:19 | ||
HIA Report_Vorna Valley Water Pipeline | Phase 1 Cultural Heritage Impact Assessment: REPLACEMENT OF THE VORNA VALLEY EMERGENCY WATER PIPELINE, MIDRAND REGION, CITY OF JOHANNESBURG METROPOLITAN MUNICIPALITY, GAUTENG PROVINCE | HIA Phase 1 | 20/12/2018 | 25/01/2019 - 12:59 | ||||
MUM Preferent Prospecting Right Phase 1 Cultural Heritage Impact Assessment Report | Phase 1 Cultural Heritage Impact Assessment: THE BENGWENYAMA PGM EXPLORATION PROJECT ON THE FARMS EERSTEGELUK 327KT AND NOOITVERWACHT 324KT, STEELPOORT REGION, GREATER SEKHUKHUNE DISTRICT MUNICIPALITY, LIMPOPO PROVINCE | HIA Phase 1 | 26/04/2022 | Johnny van Schalkwyk | Beyond Heritage | Miracle Upon Miracle Investments (Pty) Ltd | 09/05/2022 - 12:43 | |
Leeufontein HIA | Phase 1 Cultural Heritage Impact Assessment: THE CONSTRUCTION OF A 132KV CHIKADEE POWER LINE ON THE FARM LEEUWFONTEIN 428JQ, SOUTHWEST OF BELFAST, EMAKHAZENI LOCAL MUNICIPALITY, MPUMALANGA PROVINCE | HIA Phase 1 | 10/12/2017 | 13/03/2018 - 11:03 | ||||
Heritage Impact Assessment for the access road as part of the Waterloo Photovoltaic Solar energy Facility near Vryburg, North West Province | Phase 1 Cultural Heritage Impact Assessment: THE CONSTUCTION OF AN ACCESS ROAD FOR THE PROPOSED SOLAR POWER PLANT ON A PORTION OF THE FARM WATERLOO 992, VRYBURG REGION, NORTH WEST PROVINCE | AIA Phase 1 | 09/03/2017 | Johnny Van Schalkwyk | J van Schalkwyk | DPS79 Solar Energy (Pty) Ltd. | 25/08/2017 - 12:15 | |
Heritage Impact Assessment for the access road as part of the Waterloo Photovoltaic Solar energy Facility near Vryburg, North West Province | Phase 1 Cultural Heritage Impact Assessment: THE CONSTUCTION OF AN ACCESS ROAD FOR THE PROPOSED SOLAR POWER PLANT ON A PORTION OF THE FARM WATERLOO 992, VRYBURG REGION, NORTH WEST PROVINCE | HIA Phase 1 | 09/03/2017 | Johnny Van Schalkwyk | J van Schalkwyk | DPS79 Solar Energy (Pty) Ltd. | 25/08/2017 - 12:22 | |
NAZARETH FILLING STATION | Phase 1 Cultural Heritage Impact Assessment: THE DEVELOPMENT OF A FUEL FILLING STATION ON PART OF PORTION 119, MIDDELBURG TOWN AND TOWNLANDS 287JS, STEVE TSHWETE LOCAL MUNICIPALITY, MPUMALANGA PROVINCE | HIA Phase 1 | 31/10/2020 | J.A. van Schalkwyk | Mpumalanga Provincial Heritage Resources Authority | 03/02/2021 - 13:00 | ||
NAZARETH FILLING STATION HIA Report | Phase 1 Cultural Heritage Impact Assessment: THE DEVELOPMENT OF A FUEL FILLING STATION ON PART OF PORTION 119, MIDDELBURG TOWN AND TOWNLANDS 287JS, STEVE TSHWETE LOCAL MUNICIPALITY, MPUMALANGA PROVINCE | HIA Phase 1 | 31/10/2020 | J.A. van Schalkwyk | Mpumalanga Provincial Heritage Resources Authority | 03/02/2021 - 13:04 |