THIS IS THE ARCHIVE FOR SAHRIS 1.0
THIS SITE IS NOW AN ARCHIVE AND IS NOT SUITABLE FOR MAKING APPLICATIONS
Please be aware that no content and application creation or changes to information on this version of SAHRIS will be retained.
To make applications or utilise SAHRIS for the creation of information, please use the new site:
https://sahris.org.za
Changes to SAHRIS!
The South African Heritage Resources Information System (SAHRIS) has undergone a generational upgrade and restructure. These changes to the site include, but are not limited to:
- A new & modernised look and layout
- Improved site usage flows with respect to applications and content creation
- Improved site performance and stability
Launch for the new version of SAHRIS occurred on Monday the 30th of October 2023.
The new site can be found here:
SAHRIS | SAHRIS
Displaying 14451 - 14500 of 18975
ReportRef | ReportTitle | ReportType | ReportDate | Authors | AuthoringBody | CommissioningCompany | Post date |
---|---|---|---|---|---|---|---|
Kokerboom 2 WEF | Amendment Application for the Proposed Kokerboom 2 Wind Energy Facility in the Northern Cape Province | Heritage Statement | 11/04/2019 | 12/04/2019 - 09:27 | |||
KwaKopi Water Supply Scheme Heritage Impact Assessment | PHASE ONE HERITAGE IMPACT ASSESSMENT OF THE PROPOSED KWA KOPI WATER WORKS, MSINGA LOCAL AND MZINYATHI REGIONAL MUNICIPALITIES, KZN | HIA Phase 1 | 11/04/2019 | EnviroPro | Active Heritage CC | 02/05/2019 - 07:49 | |
Kokerboom 1 WEF Amendment | Heritage Statement | Heritage Statement | 11/04/2019 | Jayson Orton | 17/04/2019 - 14:52 | ||
STONE AGE SITES AT THE BLACK ROCK MINING OPERATIONS | A REPORT ON THE ASSESSMENT OF STONE AGE SITES AT THE BLACK ROCK MINING OPERATIONS, NORTHERN CAPE PROVINCE | AIA Phase 1B | 11/04/2019 | Anton van Vollenhoven | Archaetnos CC | EScience Associates (Pty) Ltd | 23/01/2020 - 14:57 |
Mt Ahsley | DESKTOP HERITAGE SURVEY OF THE PROPOSED MOUNT ASHLEY PIGGERY, MPHOPHOMENI, KWAZULU-NATAL | Heritage Scoping | 12/04/2019 | Gavin Anderson | Umlando: Archaeological Surveys & Heritage Management | Naturestamp | 12/04/2019 - 11:24 |
Orania Strydenburg PIA | Proposed rebuilding of the Orania Strydenburg 22kV line from pole ORST500-80 to pole ORST500-152-2 in the Strydenburg area, adjacent to the N12 in the Northern Cape PALAEONTOLOGICAL IMPACT ASSESSMENT | PIA Phase 1 | 13/04/2019 | JF Durand | DIGES Group | 24/04/2019 - 14:24 | |
Palaeontological Impact Assessment for the proposed extension of the low grade ore Khumani Mine | Palaeontological Impact Assessment for the proposed extension of the low grade ore Khumani Mine, Sishen, Northern Province: Desktop Study | Palaeontological Specialist Reports | 14/04/2019 | Marion Bamford | Prof Marion Bamford | Heritage Contracts and Archaeological Consulting | 16/10/2020 - 09:06 |
HIA | Heritage Impact Assessment | 14/04/2019 | Nangamso Zizo Siwendu | NGT ESHS Solutions | Shango Solutions | 05/07/2021 - 13:07 | |
PIA Desktop Study 2019 | Palaeontological Impact Assessment for the proposed extension of the low grade ore Khumani Mine, Sishen, Northern Province: Desktop Study | PIA Desktop | 14/04/2019 | Marion Bamford | Envirogistics (Pty) Ltd | 16/10/2020 - 08:27 | |
Hesters Rust FPIA | Corobrik Hesters Rust Expansion of Existing Clay Quarry - Palaeontological Impact Assessment: Phase 1 Field study | PIA Phase 1 | 15/04/2019 | Dr. Heidi Fourie | Dr Heidi Fourie | Bucandi Environmental Solutions | 15/04/2019 - 14:23 |
PROPOSED VUTSHINI-NKANDLA WATER SCHEME | PROPOSED VUTSHINI-NKANDLA WATER SCHEME (NORTH) PHASE 1: PIPELINEP1-1, NKANDLA LOCAL MUNICIPALITY, KING CETSHWAYO DISTRICT MUNICIPALITY, KWAZULU NATAL | HIA Letter of Exemption | 15/04/2019 | Giles Churchill | KwaZulu-Natal Amafa and Research Institute | ACER (Africa) Environmental Management Consultants | 15/04/2019 - 15:09 |
HIA Kapama S24G | Cultural Heritage Impact Assessment: Phase 1 Investigation for the Development of Lodges, Roads and other Tourist Infrastructure in Kapama Private Game Reserve, Maruleng Local Municipality, Mopani District Municipality, Limpopo Province | HIA Phase 1 | 15/04/2019 | Francois Coetzee | Francois Coetzee | NuLeaf Planning & Environmental | 17/05/2019 - 09:47 |
QWD 15: palaeontological | The Proposed Development of Queenswood Extension 15. City of Tshwane Metropolitan Municipality, Gauteng Province Farm: Portion 70 of Koedoespoort 325-JR | PIA Desktop | 16/04/2019 | Dr. Heidi Fourie | Dr Heidi Fourie | J Paul van Wyk | 06/05/2019 - 16:15 |
Pniel Johannesdal 1202/1 HIA [final] | HERITAGE IMPACT ASSESSMENT FOR THE PROPOSED DEVELOPMENT OF FARM 1202/1, NEAR PNIEL, PAARL MAGISTERIAL DISTRICT, WESTERN CAPE | HIA Phase 1 | 16/04/2019 | Jayson Orton | ASHA Consulting(Pty) Ltd | Withers Environmental Consultants | 18/04/2019 - 08:00 |
Heritage Impact Assessment for Driefontien | Heritage Impact Assessment report for Driefontien water supply scheme- excelsior. | Heritage Impact Assessment Specialist Reports | 16/04/2019 | 18/04/2019 - 15:29 | |||
Proposed rehabilitation of existing cultivated fields and the cultivation of new crops including Rooibos, Droogerivier | HIA: Proposed rehabilitation of existing cultivated fields and the cultivation of new crops including Rooibos, Droogerivier | HIA Phase 1 | 16/04/2019 | Jenna Lavin | CTS Heritage | FOOTPRINT Environmental Services | 29/09/2020 - 15:42 |
Phase one Heritage Impact Heritage Assessment of Erf 41 Umlaas Road KZN | HIA Phase 1 | 17/04/2019 | Frans Prins | Active Heritage CC | Indiflora cc Environment Services | 19/07/2019 - 10:48 | |
HIA for Matai Mining Right Application | PHASE I ARCHAEOLOGICAL AND CULTURAL HERITAGE IMPACT ASSESSMENT SPECIALIST REPORT FOR THE PROPOSED MINING RIGHT APPLICATION FOR VANADIUM, TITUNIUM AND IRON ORE ON PORTION (S) OF THE FARM (S) WILDEBEESTKUIL 7 JQ, AND PORTION OF FARM MAGAZYNSKRAAL 3 JQ, HAAKDOORN 6 JQ, SYFERKUIL 9 JQ AND MIDDELKUIL 8 JQ WITHIN MOSES KOTANE LOCAL MUNICIPALITY OF BOJANALA DISTRICT MUNICIPALITY IN THE NORTH WEST PROVINCE | HIA Phase 1 | 17/04/2019 | Munyadziwa Magoma | Vhubvo Archaeo-Heritage Consultants | Vhubvo Archaeo-Heritage Consultants | 17/10/2018 - 16:07 |
SAS5175 - NID Addendum | Addendum to the Notification of Intent to Develop, Case ID: 12401 | Heritage Impact Assessment Specialist Reports | 17/04/2019 | Shannon Hardwick, Justin du Piesanie | Digby Wells Environmental | Sasol Mining (Pty) Ltd | 17/04/2019 - 17:59 |
SAS5175 - Palaeontology Letter | Letter regarding Case ID 12401: Comment 25 May 2018 - Basic Assessment for the Sasol Mooikraal Conveyor Project, Sasolburg, Free State and Addendum to the Notification of Intent to Develop, Case ID 2401 (21 Jan 2019), Digby Wells Project No: SAS5175 | HIA Letter of Exemption | 17/04/2019 | Marion Bamford | Digby Wells Environmental | Sasol Mining (Pty) Ltd | 17/04/2019 - 18:04 |
Application for Exemption: Raw Water Pipeline: Medupi Power Station | Application for Exemption from further Heritage Mitigation Raw Water Pipeline at Medupi Power Station Lephalale Municipality, Waterberg District, Limpopo Province | HIA Letter of Exemption | 22/04/2019 | Len van Schalkwyk | eThembeni Cultural Heritage | WSP Environmental Pty Ltd - Johannesburg | 07/05/2019 - 14:30 |
Goedgedacht Piggery Expansion | HERITAGE IMPACT ASSESSMENT (INCLUDING PHASE ONE PALEONTOLOGY DESKTOP ASSESSMENT) OF THE PROPOSED GOEDGEDACT PIGGERY EXPANSION, FOCHVILLE GAUTENG | Heritage Impact Assessment Specialist Reports | 22/04/2019 | Frans Prins | Active Heritage CC | Green Door Environmental | 13/08/2019 - 10:44 |
Proposed Development of Hlathi Access Road, Heritage Scoping Report | Proposed construction of 5 km Hlathi gravel road in Ward 12, Nyonyana Location Msinga LM, Mzinyathi District DM, KwaZulu-Natal | Heritage Study | 22/04/2019 | Len van Schalkwyk | eThembeni Cultural Heritage | Isolendalo Environmental Consulting | 25/04/2019 - 12:15 |
Thokoza access road Heritge Scoping Report | Proposed upgrade and construction of a Thokoza gravel access road at Emthaleni, Msinga LM, Mzinyathi District DM, KwaZulu-Natal. | Heritage Study | 22/04/2019 | Len van Schalkwyk | eThembeni Cultural Heritage | Isolendalo Environmental Consulting | 25/04/2019 - 12:18 |
A Letter of Recommendation for The Exemption of a Full Phase 1 Heritage Impact Assessment (HIA) for the Development of a Filling Station on a Portion of the Remaining Extent of the Farm Kremetart 231-Lt | A Letter of Recommendation for The Exemption of a Full Phase 1 Heritage Impact Assessment (HIA) for the Development of a Filling Station on a Portion of the Remaining Extent of the Farm Kremetart 231-Lt Within the Greater Giyani Local Municipality, Limpopo Province | HIA Letter of Exemption | 23/04/2019 | Frans Roodt | Phaki Phakanani | 23/04/2019 - 06:41 | |
REVISED HIA - 23 April 2019 | A REPORT ON A CULTURAL HERITAGE IMPACT ASSESSMENT FOR THE NORTHWEST GATEWAY PROJECT, ON THE FARM HARTEBEESTFONTEIN 445 JQ, NORTH-WEST PROVINCE | HIA Phase 1 | 23/04/2019 | Prof. Anton van Vollenhoven | 23/04/2019 - 13:22 | ||
PHASE 1 HIA REPORT HOUSING DEVELOPMENT, PELLA, NORTHERN CAPE | PROPOSED HOUSING DEVELOPMENT ON REMAINDER OF ERF 1077, LOCATED BETWEEN SWARTKOPPIES STREET AND PELLA ROAD, PELLA, KHAI-MA LOCAL MUNICIPALITY, NAMAKWA DISTRICT MUNICIPALITY, NORTHERN CAPE PROVINCE | HIA Phase 1 | 24/04/2019 | Heidi Fivaz, Jan Engelbrecht | UBIQUE HERITAGE CONSULTANTS | Enviroafrica CC | 13/05/2019 - 18:12 |
Heritage Impact Assessment for the proposed Ilima Coal Company Kranspan Project | Heritage Impact Assessment for the proposed Ilima Coal Company Kranspan Project | HIA Phase 1 | 24/04/2019 | Jaco van der Walt | Heritage Contracts and Archaeological Consulting | ABS Africa | 02/08/2019 - 12:18 |
The Exemption of a Full Phase 1 Heritage Impact Assessment (HIA) for the Established Zambezi Sand Drying Plant | A Letter of Recommendation for The Exemption of a Full Phase 1 Heritage Impact Assessment (HIA) for the Established Zambezi Sand Drying Plant on PTN 77 Of The Farm Oorlogsfontein 45 KS, Mogalakwena Municipality, Waterberg District, Limpopo Province. | HIA Letter of Exemption | 24/04/2019 | Frans Roodt | EnviroSA Solutions | 29/04/2019 - 04:19 | |
Clearance of vegetation for agriculture on the farm Boerlands, Barberton district | PHASE 1 ARCHAEOLOGICAL / HERITAGE IMPACT ASSESSMENT FOR THE CLEARANCE OF VEGETATION FOR THE PURPOSE OF MACADAMIA FARMING ON PORTION 3 OF THE FARM BOERLANDS 631JT, BARBERTON CITY OF MBOMBELA, MPUMALANGA PROVINCE | AIA Phase 1 | 27/04/2019 | Christine Van Wyk Rowe | Adansonia Heritage Consultants | Core Environmental Services | 01/07/2020 - 15:48 |
Housing development on the farm Friedenheim, Nelspruit | A PHASE 1 ARCHAEOLOGICAL / HERITAGE IMPACT ASSESSMENT FOR THE PROPOSED FRIEDENHEIM HOUSING PROJECT: TOWNSHIP ESTABLISHMENT ON PORTIONS 85 & 86 OF THE FARM FRIEDENHEIM 282JT, CITY OF MBOMBELA (NELSPRUIT), MPUMALANGA PROVINCE | AIA Phase 1 | 27/04/2019 | Christine Van Wyk Rowe | Adansonia Heritage Consultants | Afrika Enviro & Biology | 02/07/2020 - 11:58 |
Agricultural development on the farm Peebles, White River | PHASE 1 ARCHAEOLOGICAL / HERITAGE IMPACT ASSESSMENT FOR THE PROPOSED ESTABLISHMENT OF MACADAMIA PLANTATIONS ON PORTION 1 OF THE FARM PEEBLES 31-JU WHITE RIVER, MPUMALANGA PROVINCE | AIA Phase 1 | 27/04/2019 | Christine Van Wyk Rowe | Adansonia Heritage Consultants | MPG Environmental Consultant (Pty) Ltd | 02/07/2020 - 12:19 |
Staff Accommodation and a Lodge development for TriReach Investments, Thornybush Game Reserve | PHASE 1 ARCHAEOLOGICAL / HERITAGE IMPACT ASSESSMENT FOR THE PROPOSED DEVELOPMENT OF TRIREACH LODGE AND STAFF HOUSING on PORTION 262 OF THE FARM GUERNSEY 81KU, LIMPOPO PROVINCE | AIA Phase 1 | 27/04/2019 | Christine Van Wyk Rowe | Adansonia Heritage Consultants | Emross Consulting (Pty) Ltd | 28/06/2020 - 09:15 |
Application to construct the Kruger View lodge on historically cultivated lands on the farm Belfast 296KU in Bushbuckridge. The proposed development is bordering the Sabie River next to the National Kruger Park, Mpumalanga Province. | PHASE 1 ARCHAEOLOGICAL / HERITAGE IMPACT ASSESSMENT FOR THE PROPOSED CONSTRUCTION OF KRUGER VIEW LODGE & ASSOCIATED INFRASTRUCTURE ON PORTIONS 4 & 5 OF THE FARM BELFAST 296KU, BUSHBUCKRIDGE AREA, MPUMALANGA PROVINCE | AIA Desktop | 27/04/2019 | Christine Van Wyk Rowe | Adansonia Heritage Consultants | MPG Environmental Consultant (Pty) Ltd | 28/06/2020 - 11:32 |
Clearing of vegetation on the farm Haakdoringdraai, Ohrigstad, Limpopo Province | A Phase 1 AIA & HIA: Clearing of vegetation for an agricultural development on portion 1 of the farm Haakdoringdraai 439KT, Kaspersnek Valley, Ohrigstad, Limpopo Province | AIA Phase 1 | 27/04/2019 | Christine Van Wyk Rowe | Adansonia Heritage Consultants | Afrika Enviro & Biology | 27/04/2019 - 12:46 |
Updated Archaeological Impact Assessment Report for proposed expansion of Lephalale Railway Yard | Updated Archaeological Impact Assessment Report for proposed expansion of Lephalale Railway Yard at Steenbokpan, Waterberg District of LImpopo Province | AIA Phase 1 | 30/04/2019 | Eric Ndivhuho Mathoho | Millennium Heritage Group | Naledzi Environmental Consultants | 15/05/2019 - 08:47 |
Chloorkop Landfill Site Extension HIA | A PHASE I HERITAGE IMPACT ASSESSMENT STUDY FOR THE PROPOSED EXPANSION OF ENVIROSERV’S EXISTING CHLOORKOP LANDFILL SITE (CLS) ONTO ADJACENT PROPERTIES IN MIDRAND, GAUTENG PROVINCE | AIA Phase 1 | 30/04/2019 | Julius CC Pistorius | Dr Julius CC Pistorious Archaeologist and heritage Consultant | SLR Consulting (South Africa) (Pty) Ltd | 01/07/2019 - 15:04 |
Khumani Heritage Impact Assessment | HERITAGE IMPACT ASSESSMENT FOR KHUMANI IRON ORE MINE NEW WATER RETURN DAM, PIPELINES AND WATER CONTAINMENT FACILITY, SISHEN, NORTHERN CAPE | Heritage Impact Assessment Specialist Reports | 30/04/2019 | Jaco van der Walt | Heritage Contracts and Archaeological Consulting | Envirogistics (Pty) Ltd | 15/05/2019 - 18:10 |
Chloorkop Landfill Site Extension HIA | A PHASE I HERITAGE IMPACT ASSESSMENT STUDY FOR THE PROPOSED EXPANSION OF ENVIROSERV’S EXISTING CHLOORKOP LANDFILL SITE (CLS) ONTO ADJACENT PROPERTIES IN MIDRAND, GAUTENG PROVINCE | AIA Phase 1 | 30/04/2019 | Julius CC Pistorius | Dr Julius CC Pistorious Archaeologist and heritage Consultant | SLR Consulting (South Africa) (Pty) Ltd | 11/06/2019 - 13:32 |
Realignment of 132kV Kromfontein powerline: PIA | Palaeontological Impact Assessment for the proposed re-alignment of the Kromfontein 132 kV powerline in support of the Vandyksdrift Central (VDDC) Project for South32 SA Coal Holdings (Pty) Ltd. Mpumalanga Province | PIA Phase 1 | 30/04/2019 | Marion Bamford | 22/09/2019 - 14:49 | ||
Phase 1 Cultural Heritage Impact Assessment - THE PROPOSED UPGRADE OF THE MONTANA SPRUIT CHANNEL WITHIN THE DOORNPOORT AND MONTANA PARK RESIDENTIAL AREA, NORTH OF PRETORIA, GAUTENG PROVINCE | Phase 1 Cultural Heritage Impact Assessment - THE PROPOSED UPGRADE OF THE MONTANA SPRUIT CHANNEL WITHIN THE DOORNPOORT AND MONTANA PARK RESIDENTIAL AREA, NORTH OF PRETORIA, GAUTENG PROVINCE | HIA Phase 1 | 30/04/2019 | Johnny van Schalkwyk | JA van Schalkwyk Heritage Consultant | TGM Environmental Services CC | 15/11/2019 - 12:06 |
Paleontological Report Biesjesfontein 218 | Paleontological Impact Assessment: Desktop Study | PIA Desktop | 30/04/2019 | Dr. Heidi Fourie | Exigo Sustainability | Exigo Sustainability | 30/07/2019 - 12:34 |
MINING OF A BORROWPIT NO.1 ON THE REMAINING PORTION OF FARM GREATER GIYANI 891 LT | BASIC ASSESSMENT REPORT AND ENVIRONMENTAL MANAGEMENT PROGRAMME FOR MINING OF A BORROWPIT NO.1: ON THE REMAINING PORTION OF FARM GREATER GIYANI 891 LT: MATERIAL SOURCING FOR PROJECT NO. RAL/T825/2018- DESIGN AND CONSTRUCT 3KM OF ROAD D3810 FROM THOMO TOWARDS KHAKHALA, MOPANI DISTRICT | Built Environment and Cultural Landscapes | 01/05/2019 | Percy Mhinga | P Enviro Holdings cc | P Enviro Holdings cc | 14/05/2019 - 23:46 |
PHASE 1 HIA REPORT FOR THE PROPOSED SENWABARWANA MALL | PHASE 1 HIA REPORT FOR THE PROPOSED SENWABARWANA MALL DEVELOPMENT ON PORTION 6 OF THE FARM BORKUM 143LS IN SENWABARWANA, LIMPOPO PROVINCE - APAC019/53 | HIA Phase 1 | 01/05/2019 | Anton Pelser | APELSER ARCHAEOLOGICAL CONSULTING | Molshe Business Solutions | 19/08/2020 - 22:32 |
Prospecting Right application Farms 467 168 etc HAY | Heritage Impact Assessment (Archaeology) for a proposed Prospecting Right application for the prospecting of Diamonds (Alluvial, General & in Kimberlite) near Postmasburg on the Remaining Extent, the Remaining Extent of Portion 1 (Strathmore), Portion 2 (portion of portion 1) and Portion 3 of Plaas 467, Remaining Extent and Portion 1 (Strathmore) of Plaas 468, Hay, Northern Cape Province | HIA Phase 1 | 01/05/2019 | David Morris | 13/08/2021 - 15:54 | ||
Queenswood Extension 15 Phase 1 cultural heritage | Phase 1 Cultural Heritage Impact Assessment: THE PROPOSED QUEENSWOOD EXTENSION 15 RESIDENTIAL DEVELOPMENT, CITY OF TSHWANE METROPOLITAN MUNICIPALITY, GAUTENG PROVINCE | HIA Phase 1 | 01/05/2019 | Johnny Van Schalkwyk | JA van Schalkwyk Heritage Consultant | J Paul van Wyk | 15/05/2019 - 09:45 |
Kuruman Hotazel Kathu Powerline Upgrade Field PIA Revised March 2019 FINAL REPORT | Palaeontological heritage: combined desktop and field-based assessment PROPOSED UPGRADING OF THE 66 KV NETWORK TO A 132 KV NETWORK BETWEEN HOTAZEL, KURUMAN AND KATHU, NORTHERN CAPE | PIA Phase 1 | 01/05/2019 | John E. Almond | 10/09/2019 - 09:36 | ||
Realignment of 132kV Kromfontein powerline: HIA | Phase I Heritage Impact Assessment (HIA) Study for the Proposed Realignment of the 132 kV Kromfontein Powerline at Vandyksdrift Central (VDDC) section of the Wolvekrans Colliery in the Mpumalanga Province | HIA Phase 1 | 01/05/2019 | Julius Pistorius | 22/09/2019 - 14:43 | ||
CTS Heritage Screener: Tyolomnqa Farm 1163 | Mining permit application for Tyolomnqa (Keiskamma), Farm 1163, Eastern Cape | Heritage Scoping | 01/05/2019 | Jenna Lavin | CTS Heritage | 30/07/2019 - 11:34 | |
Jan Kempdorp Cemetery Exp PIA | PALAEONTOLOGICAL DESKTOP ASSESSMENT OF THE EXPANSION OF THE JAN KEMPDORP CEMETRY ON PORTION 43 OF FARM GULDENSKAT 36-HN, NORTHERN CAPE PROVINCE | PIA Desktop | 02/05/2019 | Elize Butler | Banzai Environmental (Pty) Ltd | NSVT Consultants | 03/03/2020 - 12:13 |