FindReports

THIS IS THE ARCHIVE FOR SAHRIS 1.0


THIS SITE IS NOW AN ARCHIVE AND IS NOT SUITABLE FOR MAKING APPLICATIONS

Please be aware that no content and application creation or changes to information on this version of SAHRIS will be retained.

To make applications or utilise SAHRIS for the creation of information, please use the new site:

https://sahris.org.za

Changes to SAHRIS!

The South African Heritage Resources Information System (SAHRIS) has undergone a generational upgrade and restructure. These changes to the site include, but are not limited to:

  • A new & modernised look and layout
  • Improved site usage flows with respect to applications and content creation
  • Improved site performance and stability

Launch for the new version of SAHRIS occurred on Monday the 30th of October 2023.

The new site can be found here:

SAHRIS | SAHRIS

Advanced options
ReportRefsort descending ReportTitle ReportType ReportDate Authors AuthoringBody CommissioningCompany MapID < 2009 Post date
Pampoennek watching brief REPORT ON A WATCHING BRIEF DURING THE DEMOLUTION OF AN ANGLO-BOER WAR (1899-1902) BLOCHOUSE AT PAMPOENNEK, NORTHWEST PROVINCE Archaeological Permit Report 26/09/2017 Anton van Vollenhoven Archaetnos CC Aveng Lubicon Joint venture 01/10/2017 - 08:56
Pampoennek watching brief REPORT ON A WATCHING BRIEF DURING THE DEMOLUTION OF AN ANGLO-BOER WAR (1899-1902) BLOCHOUSE AT PAMPOENNEK, NORTHWEST PROVINCE Archaeological Monitoring 26/09/2017 Anton van Vollenhoven Archaetnos CC SANRAL 01/10/2017 - 09:03
Pampoennek watching brief REPORT ON A WATCHING BRIEF DURING THE DEMOLUTION OF AN ANGLO-BOER WAR (1899-1902) BLOCHOUSE AT PAMPOENNEK, NORTHWEST PROVINCE Archaeological Monitoring 26/09/2017 Anton van Vollenhoven Archaetnos CC SANRAL 01/10/2017 - 09:14
Pampoennek watching brief REPORT ON A WATCHING BRIEF DURING THE DEMOLUTION OF AN ANGLO-BOER WAR (1899-1902) BLOCHOUSE AT PAMPOENNEK, NORTHWEST PROVINCE Archaeological Monitoring 26/09/2017 Anton van Vollenhoven Archaetnos CC SANRAL 01/10/2017 - 09:30
Pampoennek watching brief REPORT ON A WATCHING BRIEF DURING THE DEMOLUTION OF AN ANGLO-BOER WAR (1899-1902) BLOCHOUSE AT PAMPOENNEK, NORTHWEST PROVINCE Archaeological Monitoring 26/09/2017 Anton van Vollenhoven Archaetnos CC SANRAL 01/10/2017 - 13:21
Panbult Interchange HIA Archaeological and Heritage Impact Assessment Report for Proposed Panbult Interchange Upgrade in Mkhondo Local Municipality, Mpumalanga Province. Heritage Impact Assessment Specialist Reports 01/02/2016 McEdward Murimbika, Palesa Mathibeli LYMA Consulting Engineers Nzumbululo Heritage Solutions 24/03/2017 - 14:38
Panbult PIA Palaeontological Impact Assessment for the Proposed Upgrade of the National Route N2 Section 34 (Between Piet Retief and Ermelo): Link and Grade-Separation for Existing Intersection at Provincial Road p97/2 and D803 for Kangra Mine Coal Haulage at Panbult, Mpumalanga Province, South Africa PIA Phase 1 03/09/2017 Marion Bamford LYMA Consulting Engineers 08/02/2018 - 09:33
Papkuilfontein 469 JR Archaeological scoping report Heritage Scoping 07/10/2012 Tobias Coetzee Environmental Assurance Meepo Ya Mmu Mineral Resources (Pty) Ltd 11/12/2012 - 20:59
Papkuilfontein AIA Phase 1 Archaeological Impact Assessment on the farm Papkuilfontein 469 JR AIA Phase 1 17/09/2012 Tobias Coetzee Environmental Assurance Meepo Ya Mmu Mineral Resources (Pty) Ltd 21/11/2012 - 16:22
PAR7273 - Notification of Intent to Develop Notification of Intent to Develop: Pan African Resources PLC (PAR) Environmental Application Process Heritage Impact Assessment Specialist Reports 28/02/2023 Shannon Hardwick Digby Wells Environmental Pan African Resources PLC 18/03/2023 - 18:09
PAR7273 Draft EIA - Appendix O (HIA Report) Heritage Impact Assessment: Pan African Resources PLC (PAR) Environmental Application Process HIA Phase 1 28/02/2023 Shannon Hardwick Digby Wells Environmental Pan African Resources PLC 18/03/2023 - 18:11
PARADIGM INVESTMENT HOLDINGS- NC 10889 MP BASIC ASSESSMENT REPORT AND ENVIRONMENTAL MANAGEMENT PROGRAMME REPORT FOR THE APPLICATION OF A MINING PERMIT SITUATED ON A PORTION OF THE REMAINING EXTENT OF THE FARM MOTITON 509, IN THE MAGISTERIAL DISTRICT OF KURUMAN, NORTHERN CAPE 31/05/2021 - 09:35
Paradise Beach Heritage Screener Paradise Beach Residential Development 24/07/2015 Nicholas Wiltshire, Mariagrazia Galimberti, Kyla Bluff, Peter Kloos CTS Heritage CEN Integrated Environmental Management Unit 24/07/2015 - 10:53
Paradise substation to Makhado Colliery ESKOM POWER LINE PARADISE SUBSTATION TO THE PROPOSED MAKHADO COLLIERY AIA Phase 1 01/10/2011 Frans Roodt Jacana Environmental cc 20/07/2012 - 14:21
Park Management Offices HIA & PIA Heritage and Palaeontological Impact Assessment for the Park Management Office Complex Development Heritage Impact Assessment Specialist Reports 21/01/2020 South African National Parks South African National Parks 21/05/2022 - 17:44
Park Paddocks DESKTOP HERITAGE SURVEY OF THE PROPOSED PARK PADDOCKS FARM EXPANSION HIA Phase 1 21/10/2019 Gavin Anderson Umlando: Archaeological Surveys & Heritage Management Independent Environmental Advisor 22/11/2019 - 12:17
Parliament Precinct : Africa House Permit application for alterations and additions to Africa House to make the building compliant for persons with disabilities Built Environment and Cultural Landscapes 22/09/2023 Ragmat Davids National Department of Public Works and Infrastructure National Department of Public Works and Infrastructure 26/10/2023 - 06:02
Parliament: Cape Stores Motivation for alterations with Parliamentary precinct, Cape Town: drainage issues. Heritage Statement 28/05/2019 Timothy Hart ACO Associates CC BVI 03/06/2019 - 16:35
Parliamentary Precinct Security Upgrades PARLIAMENTARY PRECINCT SECURITY UPGRADES Road Reserve Bouquet Street, Road Reserve Lelie Lane, Erf 3740 Parliament, Erf 95164 Parliament, Erf 7723 Parliament Street, Erf 95183 Gallery Lane, Re erf 3805 off Plein Street Belvedere House situated on Erf 95187, Corner of Bouquet Street and St John’s Road CITY OF CAPE TOWN, GARDENS Heritage Impact Assessment Specialist Reports 17/06/2020 Sarah Winter Sarah Winter Heritage Practitioner Coega Development Corporation (Pty) Ltd 25/07/2020 - 12:45
Parlock-Umgeni Access Roads HERITAGE SURVEY OF THE PROPOSED RIVER CROSSINGS TO ACCESS THE PARLOCK-UMGENI LINE, KZN HIA Phase 1 20/12/2019 Gavin Anderson Umlando: Archaeological Surveys & Heritage Management Ecolink 20/12/2019 - 11:22
Parys Abattoir Heritage Impact Assessment: Proposed new Poultry Abattoir Facility near Parys, Free State Province. HIA Phase 1 13/12/2017 Lloyd Rossouw Enviroworks 23/11/2017 - 10:56
Parys Solar PV_Palaeontological Desktop Assessment Palaeontological Desktop Assessment: Proposed Parys Up to 200MW Solar Photovoltaic and Battery Energy Storage System Hybrid Project near Parys, in the Free State Province. PIA Desktop 01/10/2022 Elize Butler Banzai Environmental (Pty) Ltd Nemai Consulting 03/05/2023 - 11:07
Parys Solar PV_Phase 1 Cultural Heritage Assessment Proposed Parys Up to 200MW Solar Photovoltaic (PV) and Battery Energy Storage System (BESS) Hybrid Project near the Town of Parys, Free State Province. HIA Phase 1 01/10/2022 JA VAN SCHALKWYK JA van Schalkwyk Heritage Consultant Nemai Consulting 03/05/2023 - 11:00
Pase 1 HIA study for proposed Mafube Road Realignment A PHASE I HERITAGE IMPACT ASSESSMENT (HIA) STUDY FOR THE PROPOSED MAFUBE LIFE X ROAD REALIGNMENT PROJECT NEAR BELFAST IN THE MPUMALANGA PROVINCE Heritage Study 13/11/2017 Dr Julius CC Pistorious Archaeologist and heritage Consultant Golder Associates Africa (Pty) Ltd 19/03/2018 - 10:08
PAST Report 2008 PAST Report 2008 Archaeological Permit Report 10/01/2008 Heidi Fourie 16/06/2012 - 14:33
Patatskloof WEF&Grid Heritage Impact Assessment PROPOSED CONSTRUCTION OF THE PATATSKLOOF WIND ENERGY FACILITY AND ASSOCIATED GRID INFRASTRUCTURE, NEAR CERES, WESTERN CAPE PROVINCE, SOUTH AFRICA Heritage Impact Assessment Specialist Reports 23/11/2022 Nikki Mann PGS Heritage (Pty) Ltd SiVEST SA (Pty) Ltd 07/12/2022 - 15:18
Patensie PIA Palaeontological specialist assessment: combined field-based and desktop study PROPOSED MELKHOUT - PATENSIE 132 kV TRANSMISSION LINE PROJECT, HUMANSDORP & HANKEY MAGISTERIAL DISTRICTS, EASTERN CAPE. PIA Phase 1 01/05/2013 John E Almond Natura Viva CC GIBB Engineering & Science - Port Elizabeth 19/09/2013 - 13:13
Patrijse Valleij, Stellenbosch Patrijse Valleij, Stellenbosch Heritage Study 01/01/2008 Hennie Vos CTS_369213 11/09/2016 - 21:11
Patryse Valley, Stellenbosch: Historical and structural investigations of the farm portion Edgbaston Patryse Valley, Stellenbosch: Historical and structural investigations of the farm portion Edgbaston AIA Phase 1 01/01/2000 Hennie Vos ArCape CTS_3616 16/06/2012 - 14:33
Paul Roux Sewer Pipeline and Bridge HIA Phase 1 Heritage Impact Assessment for proposed new 1.5 km-long underground sewerage pipeline in Paul Roux, Thabo Mofutsanyane District Municipality, Free State Province. HIA Phase 1 16/02/2020 Lloyd Rossouw Paleo Field Services NSVT Consultants 21/08/2020 - 13:11
Paul Roux Sewer Pipeline and Bridge HIA Phase 1 Heritage Impact Assessment for proposed new 1.5 km-long underground sewerage pipeline in Paul Roux, Thabo Mofutsanyane District Municipality, Free State Province. HIA Phase 1 16/02/2020 Lloyd Rossouw NSVT Consultants 21/08/2020 - 14:15
Paul Roux Sewer Pipeline and Bridge HIA Phase 1 Heritage Impact Assessment for proposed new 1.5 km-long underground sewerage pipeline in Paul Roux, Thabo Mofutsanyane District Municipality, Free State Province. HIA Phase 1 16/02/2020 Lloyd Rossouw Paleo Field Services NSVT Consultants 21/08/2020 - 14:20
Paul Roux township establishment Phase 1 Heritage impact Assessment for proposed new township development on the farm Mary Ann 712, Paul Roux Free State Province HIA Phase 1 Lloyd Rossouw Paleo Field Services 29/10/2014 - 10:46
Paulputs HIA HERITAGE IMPACT ASSESSMENT: PROPOSED PAULPUTS WIND ENERGY FACILITY AND ASSOCIATED GRID CONNECTION NEAR POFADDER, KENHARDT MAGISTERIAL DISTRICT, NORTHERN CAPE PALAEONTOLOGICAL HERITAGE ASSESSMENT: DESKTOP STUDY PROPOSED PAULPUTS WIND ENERGY FACILITY AND ASSOCIATED GRID CONNECTION NEAR POFADDER, KENHARDT MAGISTERIAL DISTRICT, NORTHERN CAPE Heritage Impact Assessment Specialist Reports 09/07/2019 Jayson Orton ASHA Consulting(Pty) Ltd Arcus Consulting 21/02/2019 - 09:55
PDA King William’s Town bulk regional sewage scheme Palaeontological Desktop Assessment for f the proposed upgrading of the King William’s Town bulk regional sewage scheme by the Buffalo City Municipality in the Eastern Cape. PIA Desktop 08/06/2013 Gideon Groenewald PGS Heritage and Grave Relocation Consultants GIBB Engineering & Science - East London 02/07/2013 - 21:28
PDA (V2) PROPOSED DEVELOPMENT AT WATERKLOOF 378 JR, PRETORIA, GAUTENG PROPOSED DEVELOPMENT AT ERASMUS PARK (WATERKLOOF 378 JR), PRETORIA, GAUTENG. DESKTOP STUDY PALAEONTOLOG PIA Desktop 10/06/2017 Francois Durand Skarab CC Exigo Sustainability 15/06/2017 - 11:12
PDA - PROPOSED 22KV POWERLINE FROM BLACK ROCK TO GLORIA MINE, NORTHERN CAPE PALAEONTOLOGICAL DESKTOP ASSESSMENT FOR THE PROPOSED 22KV POWERLINE FROM BLACK ROCK TO GLORIA MINE, BLACK ROCK MINE OPERATIONS, HOTAZEL, NORTHERN CAPE PIA Desktop 01/10/2019 Elize Butler Banzai Environmental (Pty) Ltd EScience Associates (Pty) Ltd 01/10/2019 - 14:02
PDA Dominion 3 PV Palaeontological Desktop Assessment for the Proposed Dominion 3 Solar Park near Klerksdorp within The North-West Province PIA Desktop 20/04/2022 Elize Butler Banzai Environmental (Pty) Ltd PGS Heritage (Pty) Ltd 23/11/2022 - 17:27
PDA For Erf 364 PDA For Erf 364 PIA Desktop 15/04/2018 17/05/2018 - 14:00
PDA for Somkhele’s Ophondweni and Emalahleni opencast pits Palaeontological Desktop Assessment (PDA) to assess the Palaeontology for the 3 proposed Somkhele Anthracite Mine opencast pits (Ophondweni, Mahujini and Emalahleni), within the uMkhanyakude District Municipality and the Mtubatuba Local Municipality, KwaZulu Natal. PIA Desktop 27/04/2020 Elize Butler Banzai Environmental (Pty) Ltd Tendele Coal Mining (Pty) Ltd 29/05/2020 - 15:27
PDA for the improvement of National Route R510, Thabazimbi, Limpopo Province DESKTOP STUDY PALAEONTOLOGY: Proposed improvement of National Route R510 Section 2 from km 6.3 at Bierspruit Bridge to km 33.4 near Thabazimbi, Limpopo Province PIA Desktop 10/06/2017 Francois Durand Skarab CC EOH Coastal & Environmental Services (CES) - Port Elizabeth 05/09/2017 - 15:59
PDA for the Dominion 1 PV project Palaeontological Desktop Assessment for the proposed Dominion 1 solar park near Klerksdorp within the North-West Province PIA Desktop 20/04/2022 Elize Butler Banzai Environmental (Pty) Ltd PGS Heritage (Pty) Ltd 23/11/2022 - 16:41
PDA for the Dominion 2 PV project Palaeontological Desktop Assessment for the Proposed Development of Dominion 2 Solar Park and Associated Infrastructure Located Near Klerksdorp, North West Province, South Africa PIA Desktop 20/04/2022 Elize Butler Banzai Environmental (Pty) Ltd PGS Heritage (Pty) Ltd 23/11/2022 - 17:10
PDA for the Westrand Strengthening Project II Palaeontological Desktop Assessment (DIA) to assess the proposed Westrand Strengthening Project Phase II PIA Desktop 22/02/2019 Elize Butler Banzai Environmental (Pty) Ltd PGS Heritage (Pty) Ltd 25/06/2020 - 19:58
PDA PROPOSED DEVELOPMENT AT WATERKLOOF 378 JR, PRETORIA, GAUTENG PROPOSED DEVELOPMENT AT ERASMUS PARK (WATERKLOOF 378 JR), PRETORIA, GAUTENG. DESKTOP STUDY PALAEONTOLOGY PIA Desktop 18/05/2017 Francois Durand Skarab CC Atterbury Property Fund Managers (Pty) Ltd 19/05/2017 - 09:43
PDA proposed Mogalakwena Solar Pv Project Limpopo Palaeontological Desktop Assessment For The Proposed Mogalakwena Solar Pv Project In Limpopo, South Africa PIA Desktop 15/06/2021 Elize Butler Banzai Environmental (Pty) Ltd 19/08/2021 - 11:00
PDA Report Onderstepoort Solar 1 PV PALAEONTOLOGICAL IMPACT ASSESSMENT - PROPOSED 240MW ONDERSTEPOORT SOLAR 1 PHOTOVOLTAIC PROJECT NORTH WEST OF RUSTENBURG, NORTH WEST PROVINCE PIA Desktop 13/06/2023 Elize Butler Banzai Environmental (Pty) Ltd Nemai Consulting 03/07/2023 - 11:37
PDA Report Onderstepoort Solar 2 PV PALAEONTOLOGICAL IMPACT ASSESSMENT - PROPOSED 240MW ONDERSTEPOORT SOLAR 2 PHOTOVOLTAIC PROJECT NORTH WEST OF RUSTENBURG, NORTH WEST PROVINCE PIA Desktop 13/06/2023 Elize Butler Banzai Environmental (Pty) Ltd Nemai Consulting 03/07/2023 - 12:01
PDA Report Rhino Solar PV Rustenburg PALAEONTOLOGICAL DESKTOP ASSESSMENT - PROPOSED 65MW RHINO SOLAR PHOTOVOLTAIC PROJECT NORTH WEST OF RUSTENBURG, NORTH WEST PROVINCE PIA Desktop 13/06/2023 Elize Butler Banzai Environmental (Pty) Ltd Nemai Consulting 30/06/2023 - 17:33
Peacevalley Culvert and Road Upgrade LETTER OF EXEMPTION FOR THE PEACE VALLEY III ROAD UPGRADE HIA Letter of Exemption 23/06/2015 Gavin Anderson Umlando: Archaeological Surveys & Heritage Management ECA CONSULTING 12/01/2016 - 10:31

Pages

CSV
 
 

Search form