FindReports

THIS IS THE ARCHIVE FOR SAHRIS 1.0


THIS SITE IS NOW AN ARCHIVE AND IS NOT SUITABLE FOR MAKING APPLICATIONS

Please be aware that no content and application creation or changes to information on this version of SAHRIS will be retained.

To make applications or utilise SAHRIS for the creation of information, please use the new site:

https://sahris.org.za

Changes to SAHRIS!

The South African Heritage Resources Information System (SAHRIS) has undergone a generational upgrade and restructure. These changes to the site include, but are not limited to:

  • A new & modernised look and layout
  • Improved site usage flows with respect to applications and content creation
  • Improved site performance and stability

Launch for the new version of SAHRIS occurred on Monday the 30th of October 2023.

The new site can be found here:

SAHRIS | SAHRIS

Advanced options
ReportRef ReportTitlesort descending ReportType ReportDate Authors AuthoringBody CommissioningCompany MapID < 2009 Post date
Heritage Impact Assessment - PR11296 Phase 1 Heritage Impact Assessment for proposed prospecting drilling on Portion 2 of Rozynbosch No.41 and Remaining Extent & Portion 1 of Wortel No. 42, Namaqualand District, NC Province. Heritage Impact Assessment Specialist Reports 09/12/2015 Lloyd Rossouw Paleo Field Services Black Mountain Mining (PTY) LTD 10/12/2015 - 11:47
PHASE 1 HERITAGE IMPACT ASSESSMENT FOR PROSPECTING RIGHT APPLICATION WITHIN PROSPECTING RIGHT APPLICATION ON FARM NIEUWE MOED 534 PHASE 1 HERITAGE IMPACT ASSESSMENT FOR PROSPECTING RIGHT APPLICATION WITHIN THE FARM NIEUWE MOED 534 HIA Phase 1 01/09/2020 Trust Mlilo Integrated Specialist Services (Pty) Ltd Integrated Specialist Services (Pty) Ltd 11/09/2020 - 13:28
AIA_BLYDE_LISBON_513_KT_Van_Wyk_Rowe_C_Jul08 Phase 1 Heritage Impact Assessment for Resources on Blyde Plantation: Lisbon 531 KT AIA Phase 1 01/07/2008 Christine Van Wyk Rowe Adansonia Heritage Consultants MAPID_02111 16/06/2012 - 14:43
Phase 1 Heritage Impact Assessment for Section 24G Application, expansion and related operation of 4 additional broiler poultry houses Phase 1 Heritage Impact Assessment for Section 24G Application, expansion and related operation of 4 additional broiler poultry houses on Portion 36 (a Portion of Portion 19) of the Farm Tweerivier 197-JQ Madibeng Local Municipality, North-West Province HIA Phase 1 08/12/2022 Makhosazana Mngomezulu Vungandze Projects Vungandze Projects 12/03/2023 - 20:15
Phase 1 Heritage Impact Assessment for Section 24G Application, expansion and related operation of 4 additional broiler poultry houses Phase 1 Heritage Impact Assessment for Section 24G Application, expansion and related operation of 4 additional broiler poultry houses on Portion 36 (a Portion of Portion 19) of the Farm Tweerivier 197-JQ Madibeng Local Municipality, North-West Province. HIA Phase 1 08/12/2022 Makhosazana Mngomezulu Vungandze Projects 12/03/2023 - 20:59
Phase 1 Heritage Impact Assessment for the Frankenwald Development Johannesburg North Phase 1 Heritage Impact Assessment for the Frankenwald Development Johannesburg North Magisterial District, City of Johannesburg Metropolitan Municipality, Gauteng Province Heritage Impact Assessment Specialist Reports 31/07/2021 Udo Kusel, Siegwalt Udo Kusel African Heritage Consultants CC LEAP -Landscape Architectural and Environmental Planning 17/05/2022 - 08:14
HIA_Bizana_Becker_E_Aug08 Phase 1 Heritage Impact Assessment for the Bizana Area AIA Phase 1 01/08/2008 Elize Becker Knight Piesold Consultants 16/06/2012 - 14:52
9-2-026-0001-20080901-KNP Phase 1 Heritage Impact Assessment for the Cata/Mnyameni Area, East London, Eastern Cape AIA Phase 1 01/09/2008 Elize Becker Knight Piesold Consultants MAPID_02133 16/06/2012 - 14:34
9-2-047-0001-20060131-AACC Phase 1 Heritage Impact Assessment for the Construction and Upgrading of the Proposed Access Roads to the Braamhoek Pumped Storage Scheme AIA Phase 1 31/01/2006 Polke Birkholtz, Jaco van der Walt Archaeology Africa CC MAPID_00837 16/06/2012 - 14:35
Phiring Village Power Line Phase 1 Heritage Impact Assessment for the construction of 18 meter access causeway / culvert pipes at Phiring Village in the Tubatse Local Municipalty of Sekhukhune District, Limpompo Province. HIA Phase 1 01/06/2009 Matumba African Heritage Consultants Mavu Environmental Consultants 08/04/2013 - 08:13
HIA FOR TOWNSHIP ON THE REMAINDER OF THE FARM RIETKUIL 558-IS, PHASE 1 HERITAGE IMPACT ASSESSMENT FOR THE CONSTRUCTION OF A TOWNSHIP ON THE REMAINDER OF THE FARM RIETKUIL 558-IS, NEAR KRIEL, EMALAHLENI LOCAL MUNICIPALITY, MPUMALANGA PROVINCE HIA Phase 1 03/11/2020 Makhosazana Mngomezulu Barzani Mining (Pty) Ltd Barzani Mining (Pty) Ltd 02/11/2021 - 22:33
9-2-073-0001-20070521-AlbMus Phase 1 Heritage Impact Assessment for the Establishment of the Sardinia Bay Golf Estate (Erf 378 - Theescombe), Port Elizabeth HIA Phase 1 21/05/2007 Lita Webley Albany Museum MAPID_00760 16/06/2012 - 14:36
9-2-277-0006-20080701-AACC Phase 1 Heritage Impact Assessment for the Establishment of the Sonlandpark Extension 1 Residential Development Situated on Portions 110 and 114 of the Farm Houtkop 594- IQ, Gauteng Province AIA Phase 1 01/07/2008 Polke Birkholtz Archaeology Africa CC MAPID_01676 16/06/2012 - 14:41
9-2-288-0001-20080402-AACC Phase 1 Heritage Impact Assessment for the Lothier Siding for Golfview Mining (Pty) Ltd. on the Farm Leliefontein 136 IT Portion 6 in the Vicinity of Ermelo, Mpumalanga Province, South Africa HIA Phase 1 02/04/2008 Polke Birkholtz Archaeology Africa CC MAPID_02156 16/06/2012 - 14:41
AIA_Middelburg_Water_Reclamation_Gaigher_S_Jun11 Phase 1 Heritage Impact Assessment for the Middelburg Water Reclamation Project. AIA Phase 1 23/06/2011 Stephan Gaigher Gaigher & Associates 16/06/2012 - 14:47
Heritage Impact Assessment Report - Japies Rus Minerale Phase 1 Heritage Impact Assessment for the Mining Right application by Japies Rus Minerale (Pty) Ltd on Portion 1 of the Farm Magoloring 668 and Portion 6 (a portion of Portion 2) of the Farm Magoloring 668, near Postmasburg in the Northern Cape Province. HIA Phase 1 09/02/2017 Stephan Gaigher G&A Heritage Management Consultants 17/08/2017 - 10:55
AIA_Morning_Tide_Rooidraai_34_JT_Birkholtz_PD_May06 Phase 1 Heritage Impact Assessment for the Morning Tide Development Complex, Morning Tide Power Line and Abrina Residential Development - Rooidraai 34 JT AIA Phase 1 11/05/2006 Polke Birkholtz Archaeology Africa CC MAPID_01100 16/06/2012 - 14:48
AIA_Morning_Tide_Sterkspruit_33_JT_Birkholtz_PD_May06 Phase 1 Heritage Impact Assessment for the Morning Tide Development Complex, Morning Tide Power Line and Abrina Residential Development-Sterkspruit 33 JT AIA Phase 1 11/05/2006 Polke Birkholtz Archaeology Africa CC MAPID_00673 16/06/2012 - 14:48
Mabopane Heritage report Phase 1 Heritage Impact Assessment for the propose Township Establishment on the remaining Portion of Farm Mabopane 702 JR, within City of Tshwane Municipality, Gauteng Province HIA Phase 1 09/04/2019 Trust Mlilo Integrated Specialist Services (Pty) Ltd City of Tshwane Metropolitan Municipality 09/04/2019 - 15:15
Ekapa Minerals (Ltd) Pty) Heritage impact assessment report Phase 1 Heritage Impact Assessment for the proposed Photo Voltic (PV) plant installation at Boshoff Floors for Ekapa Minerals (Pty) Ltd, Northern Cape HIA Phase 1 01/03/2023 Siegwalt Kusel Shangoni Management Services Shangoni Management Services 11/05/2023 - 12:22
PHASE 1 HIA PLOT 2386 KAKAMAS-SOUTH NORTHERN CAPE PHASE 1 HERITAGE IMPACT ASSESSMENT FOR THE PROPOSED AGRICULTURAL DEVELOPMENT PLOT 2386, (PORTION OF PLOT 2189), KAKAMAS-SOUTH SETTLEMENT, KAI !GARIB LOCAL MUNICIPALITY, ZF MGCAWU DISTRICT MUNICIPALITY, NORTHERN CAPE PROVINCE. HIA Phase 1 Heidi Fivaz, Jan Engelbrecht, Elize Butler UBIQUE HERITAGE CONSULTANTS ECO Balance Planning Co 28/09/2023 - 13:22
Amelia Shopping Centre and Filling Station Phase 1 Heritage Impact Assessment for the proposed Amelia Trading Shopping Centre and filling Station in Sasolburg in Metsimaholo Local Municipality of the Free State Province AIA Phase 1 10/02/2020 Trust Mlilo Sativa Travel and Environmental Consultants Hluli Environmental and Engineering Consultants 06/05/2020 - 15:22
Proposed construction and maintenance of the Rand Water 3km H14 pipeline Phase 1 Heritage Impact Assessment for the proposed construction and maintenance of the Rand Water 3km H14 pipeline phase two with an internal diameter of 1200mm, including its associated infrastructures, to replace the remaining portion of the existing 600mm diameter H14 pipeline, between Thaba Tshwane and Kwaggaspoort, Tshwane Metropolitan Municipality, Gauteng Province HIA Phase 1 24/01/2017 Makhosazana Mngomezulu 24/01/2017 - 14:35
HIA for pipeline from Orange River to Plangeni, Keimoes, Northern Cape Phase 1 Heritage Impact Assessment for the proposed construction of a 1.7km long freshwater pipeline from the Orange River to Plangeni, Northern Cape Province HIA Phase 1 03/04/2023 Lloyd Rossouw Paleo Field Services MDA Town and Regional Planners 19/06/2023 - 12:27
BMM Swartberg Decline HIA Phase 1 Heritage Impact Assessment for the proposed construction of a 800m section of gravel road and associated infrastructure at the Black Mountain Decline on the Farm Zuurwater 62 , Khai-Ma Local Municipality, NC Province. HIA Phase 1 18/01/2017 Lloyd Rossouw Black Mountain Mining (PTY) LTD EndemicVision Environmental Services 01/02/2017 - 13:55
BMM Swartberg HIA Updated Phase 1 Heritage Impact Assessment for the proposed construction of a 800m section of gravel road and associated infrastructure at the Black Mountain Decline on the Farm Zuurwater 62 , Khai-Ma Local Municipality, NC Province. HIA Phase 1 31/03/2017 Lloyd Rossouw 31/03/2017 - 16:56
HIA conducted near the site (note that this is an HIA that was undertaken as part of a separate Basic Assessment process near the site) Phase 1 Heritage Impact Assessment for the proposed construction of a 800m section of gravel road and associated infrastructure at the Black Mountain Decline on the Farm Zuurwater 62 , Khai-Ma Local Municipality, NC Province. HIA Phase 1 Paleo Field Services Paleo Field Services 03/12/2018 - 16:49
AIA_Morgenzon_466-IS_Birkholtz_PD_Oct08 Phase 1 Heritage Impact Assessment for the proposed construction of a new Waste Treatment and Sewage pipeline on portion 32 of the farm Morgenzon 466-IS, Lekwa local Municipality, Mpumalanga Province. AIA Phase 1 08/10/2008 Polke Birkholtz Archaeology Africa CC MAPID_03412 16/06/2012 - 14:48
Phase 1 Heritage Impact Assessment - construction of an 88kv distribution powerline from the existing Straatsdrift substation to the proposed Silwerkraans substation within the Ramotshere Moiloa, Moses Kotane and Kgetlengrivier Local Municipalities Phase 1 Heritage Impact Assessment for the proposed construction of an 88kv distribution powerline from the existing Straatsdrift substation to the proposed Silwerkraans substation within the Ramotshere Moiloa, Moses Kotane and Kgetlengrivier Local Municipalities, North West Province HIA Phase 1 18/09/2017 Makhosazana Mngomezulu Vungandze Projects BAAGI ENVIRONMENTAL CONSULTANCY 22/09/2017 - 14:04
Phase 1 Heritage Impact Assessment for the proposed construction of an 88kv distribution powerline Phase 1 Heritage Impact Assessment for the proposed construction of an 88kv distribution powerline from the existing Straatsdrift substation to the proposed Silwerkraans substation within the Ramotshere Moiloa, Moses Kotane and Kgetlengrivier Local Municipalities, North West Province. HIA Phase 1 28/08/2017 Makhosazana Mngomezulu Vungandze Projects BAAGI ENVIRONMENTAL CONSULTANCY 22/08/2017 - 13:02
ARARAT-BAFOKENG PHASE 1 HERITAGE IMPACT ASSESSMENT PHASE 1 HERITAGE IMPACT ASSESSMENT FOR THE PROPOSED CONSTRUCTION OF BAFOKENG-ARARAT 88KV POWERLINE HIA Phase 1 31/08/2021 Makhosazana Mngomezulu Vungandze Projects HUMBA ENVIRONMENTAL CONSULTANCY 15/02/2022 - 12:11
PHASE 1 HERITAGE IMPACT ASSESSMENT FOR THE PROPOSED CONSTRUCTION OF BAFOKENG-ARARAT 88KV POWERLINE. PHASE 1 HERITAGE IMPACT ASSESSMENT FOR THE PROPOSED CONSTRUCTION OF BAFOKENG-ARARAT 88KV POWERLINE. THE PROJECT FALLS UNDER RUSTENBURG LOCAL MUNICIPALITY IN THE NORTH WEST PROVINCE. HIA Phase 1 31/08/2021 Makhosazana Mngomezulu Vungandze Projects HUMBA ENVIRONMENTAL CONSULTANCY 27/10/2021 - 10:36
PHASE 1 HERITAGE IMPACT ASSESSMENT FOR THE PROPOSED CONSTRUCTION OF BAFOKENG-ARARAT 88KV POWERLINE. PHASE 1 HERITAGE IMPACT ASSESSMENT FOR THE PROPOSED CONSTRUCTION OF BAFOKENG-ARARAT 88KV POWERLINE. THE PROJECT FALLS UNDER RUSTENBURG LOCAL MUNICIPALITY IN THE NORTH WEST PROVINCE. HIA Phase 1 30/08/2021 Makhosazana Mngomezulu Vungandze Projects HUMBA ENVIRONMENTAL CONSULTANCY 29/11/2021 - 11:09
HIA for the Proposed Development of the L3415 Road PHASE 1 HERITAGE IMPACT ASSESSMENT FOR THE PROPOSED CONSTRUCTION OF THE NEW GRAVEL ROAD L3415, ALFRED DUMA LOCAL MUNICIPALITY, KWAZULU-NATAL HIA Phase 1 01/12/2019 Gary Trower Gary Trower Hanslab (Pty) Ltd 05/05/2020 - 11:12
L3491 Phase 1 Heritage Impact Assessment Phase 1 Heritage Impact Assessment for the proposed construction of the new type 7A gravel Road L3491 (Sahlumbe Road), Alfred Duma Local Municipality, KwaZulu-Natal. HIA Phase 1 01/12/2019 Gary Trower Gary Trower Hanslab (Pty) Ltd 22/05/2020 - 08:33
L3491 Phase 1 Heritage Impact Assessment Phase 1 Heritage Impact Assessment for the proposed construction of the new type 7A gravel road L3491 (Sahlumbe Road), Alfred Duma Local Municipality, KwaZulu-Natal. HIA Phase 1 01/12/2019 Gary Trower Gary Trower Hanslab (Pty) Ltd 22/05/2020 - 08:38
Phase 1 Heritage Impact Assessment for the proposed development of a hydroponics tunnel farming Phase 1 Heritage Impact Assessment for the proposed development of a hydroponics tunnel farming, Molote City, North West Province. AIA Phase 1 10/10/2018 Lloyd Rossouw Paleo Field Services Paleo Field Services 28/11/2019 - 08:59
The proposed development of a residential area new-link in Lothair Phase 1 Heritage Impact Assessment for the proposed development of a residential area new-link in Lothair, within Msukalingwa Local Municipality, Mpumalanga Province. HIA Phase 1 28/06/2019 Makhosazana Mngomezulu Vungandze Projects 05/09/2019 - 13:15
Kalahari Secondary School PHASE 1 HERITAGE IMPACT ASSESSMENT FOR THE PROPOSED DEVELOPMENT OF KALAHARI SECONDARY SCHOOL AND ASSOCIATED INFRASTRUCTURE, KURURMAN, GA-SEGONYANA LOCAL MUNICIPALITY, NORTHERN CAPE HIA Phase 1 31/08/2020 Makhosazana Mngomezulu Vungandze Projects 14/09/2020 - 00:28
9-2-253-0003-20060301-AACC Phase 1 Heritage Impact Assessment for the Proposed Development of Portions 13, 23, 52 & 75 of the Farm Doornkraal 680 LS, Polokwane, Limpopo Province AIA Phase 1 01/03/2006 Polke Birkholtz Archaeology Africa CC MAPID_00297 16/06/2012 - 14:39
Phase 1 Heritage Impact Assessment ERPM Mine Village, Boksburg, Gauteng Phase 1 Heritage Impact Assessment for the Proposed Development of the ERPM Mine Village, Boksburg, Gauteng AIA Phase 1 23/05/2012 Jaco van der Walt, Polke Birkholtz 22/11/2012 - 12:30
Limpopo Central Hospital Phase 1 Heritage Impact Assessment Phase 1 Heritage Impact Assessment for the proposed development of the Limpopo Central Hospital on the remaining extent of Erf 6861 - Extension 30 in Polokwane in the Limpopo Province HIA Phase 1 23/10/2019 Marko Hutten PGS Heritage (Pty) Ltd 06/11/2019 - 17:39
Development of Moloto Community Hall Phase 1 Heritage Impact Assessment for the proposed development of the new Moloto Community Hall in Moloto within the jurisdiction of the Thembisile Hani Local Municipality HIA Phase 1 15/07/2019 Roy Muroyi Tsimba Archaeological Footprints (Pty) Ltd Thikho Consulting and Projects 04/10/2019 - 14:50
BMM Big Syncline Expansion HIA Phase 1 Heritage Impact Assessment for the proposed expansion of prospecting drilling on the Remaining Extent and Portion 1 of the Farm Aggeneys 56 and Portion 4 of the Farm Zuurwater 62 , Khai-Ma Local Municipality, NC Province. HIA Phase 1 19/12/2016 Lloyd Rossouw Black Mountain Mining (PTY) LTD EndemicVision Environmental Services 01/02/2017 - 12:40
Gamsberg Phase 1 Heritage Impact Assessment 2019 Phase 1 Heritage Impact Assessment for the proposed exploratory drill holes on the Gamsberg inselberg on Portion 1 of the farm Gams 60, Khai-Ma Local Municipality, NC Province. HIA Phase 1 18/07/2019 Lloyd Rossouw Paleo Field Services Black Mountain Mining (PTY) LTD 24/07/2019 - 08:49
Proposed Balfour FET College Phase 1 Heritage Impact Assessment for the Proposed Further Education Training (FET) College in Balfour, Mpumalanga Province. Heritage Impact Assessment Specialist Reports 25/10/2013 Makhosazana Mngomezulu 25/10/2013 - 11:31
PROPOSED CONSTRUCTION OF FURTHER EDUCATION TRAINING (FET) COLLEGE AT UMSINGA, KWAZULU NATAL PROVINCE. PHASE 1 HERITAGE IMPACT ASSESSMENT FOR THE PROPOSED FURTHER EDUCATION TRAINING (FET) COLLEGE IN MSINGA, KWAZULU NATAL PROVINCE. HIA Phase 1 13/02/2014 Makhosazana Mngomezulu 13/02/2014 - 11:33
National Route R23 Development Phase 1 Heritage Impact Assessment for the proposed improvement and rehabilitation of National Route 23 - section between Platrand and Standerton & Section 2 between Standerton and Greylingstad HIA Phase 1 01/11/2011 Leonie Marais-Botes Independant Consultant Nemai Consulting 15/01/2013 - 15:08
Phase 1 HIA Postmasburg Bulk Water Pipeline Phase 1 Heritage Impact Assessment for the proposed installation of a 710mm diameter, bulk water pipeline from the Postdene reservoir to the Greenfields residential development in Postmasburg, NC Province. HIA Phase 1 25/05/2021 Lloyd Rossouw Paleo Field Services Bigen Africa Services (Pty) Ltd. 12/08/2021 - 12:11
9-2-228-0001-20060326-AACC Phase 1 Heritage Impact Assessment for the Proposed Jameson Field Extension 1 Residential Township Development, Gauteng Province AIA Phase 1 26/03/2006 Polke Birkholtz Archaeology Africa CC MAPID_00851 16/06/2012 - 14:38

Pages

CSV
 
 

Search form