THIS IS THE ARCHIVE FOR SAHRIS 1.0
THIS SITE IS NOW AN ARCHIVE AND IS NOT SUITABLE FOR MAKING APPLICATIONS
Please be aware that no content and application creation or changes to information on this version of SAHRIS will be retained.
To make applications or utilise SAHRIS for the creation of information, please use the new site:
https://sahris.org.za
Changes to SAHRIS!
The South African Heritage Resources Information System (SAHRIS) has undergone a generational upgrade and restructure. These changes to the site include, but are not limited to:
- A new & modernised look and layout
- Improved site usage flows with respect to applications and content creation
- Improved site performance and stability
Launch for the new version of SAHRIS occurred on Monday the 30th of October 2023.
The new site can be found here:
SAHRIS | SAHRIS
Displaying 17401 - 17450 of 18975
ReportRef | ReportTitle | ReportType | ReportDate | Authors | AuthoringBody | CommissioningCompany | MapID < 2009 | Post date |
---|---|---|---|---|---|---|---|---|
Heritage Impact Assessment - FBAR | Wind Garden App I - Heritage Impact Assessment | Heritage Impact Assessment Specialist Reports | 28/07/2021 | Cherene de Bruyn | PGS Heritage (Pty) Ltd | Savannah Environmental (Pty) Ltd | 29/07/2021 - 10:59 | |
Heritage Impact Assessment Report-Valley Silts | The proposed Valley Silts projects, City of Johannesburg Metropolitan Municipality, Gauteng Province | Heritage Impact Assessment Specialist Reports | 21/11/2019 | Jennifer Kitto | PGS Heritage (Pty) Ltd | Kongiwe Environmental (Pty) Ltd | 12/12/2019 - 16:33 | |
Soyuz 5 draft EIR - HIA | HERITAGE IMPACT ASSESSMENT REPORT FOR THE SOYUZ 5 WIND ENERGY FACILITY PROJECT, PIXLEY KA SEME DISTRICT MUNICIPALITY, NORTHERN CAPE PROVINCE | Heritage Impact Assessment Specialist Reports | 01/02/2023 | Nelius Kruger | EOH Coastal & Environmental Services (CES) - Cape Town | Soyuz 5 (Pty) Ltd | 15/03/2023 - 13:41 | |
HIA township establishment [nid: 573738] | Heritage Impact Assessment for the Township Establishment on the remainder of Portion 1 of the Farm Naturelle Lokasie 272 LS | Heritage Impact Assessment Specialist Reports | 27/11/2020 | Jaco van der Walt | Heritage Contracts and Archaeological Consulting | 11/05/2021 - 10:18 | ||
Koup 1 Heritage Impact Assessment | PROPOSED CONSTRUCTION OF THE KOUP 1 WIND ENERGY FACILITY AND ASSOCIATED GRID INFRASTRUCTURE, NEAR BEAUFORT WEST, WESTERN CAPE PROVINCE, SOUTH AFRICA | Heritage Impact Assessment Specialist Reports | 23/04/2022 | Wouter Fourie | PGS Heritage (Pty) Ltd | SiVEST SA (Pty) Ltd | 22/11/2021 - 13:30 | |
Thornhill Bulk Water - Nqadu Corridor | Archaeological and Heritage Impact Assessment Report for Proposed Thornhill Bulk Water Supply Project (Nqadu Corridor) within OR Tambo Local Municipality in the Eastern Cape Province | Heritage Impact Assessment Specialist Reports | 01/12/2013 | Steve K Kalule | 03/06/2014 - 14:11 | |||
HIA_Dynamite Coffee Co_Restaurant Building, Modderfontein | heritage Impact Assessment for the Dynamite Coffee Co, Restaurant Building, Modderfontein, Gauteng Province | Heritage Impact Assessment Specialist Reports | 01/05/2017 | Mauritz Naude | Mauritz Naude | 25/03/2019 - 16:52 | ||
HIA on Farm Kennedy's Vale | Cultural heritage impact assessment for THE PROPOSED MINING ACTIVITIES ON PORTIONS OF THE FARMS KENNEDY’S VALE 361KT AND SPITSKOP 333KT, GREATER TUBATSE LOCAL MUNICIPALITY, LIMPOPO PROVINCE | Heritage Impact Assessment Specialist Reports | 31/01/2016 | 29/09/2022 - 09:06 | ||||
Normandie DBAR Heritage Report | Cultural Heritage Impact Assessment Of The Proposed Normandie-Hlungwane, Coal-Link Project, Mpumalanga Province | Heritage Impact Assessment Specialist Reports | 16/01/2014 | Frans Prins | Sivest - Gauteng | 21/04/2015 - 10:54 | ||
Cultural heritage impact assessment | Cultural heritage impact assessment for THE DEVELOPMENT OF THE PROPOSED KAGISO SOLAR POWER PLANT ON THE REMAINING EXTENT OF THE FARM KAMEELAAR NO 315 REGISTRATION DIVISION KURUMAN, NORTHERN CAPE PROVINCE | Heritage Impact Assessment Specialist Reports | 01/03/2016 | Johnny Van Schalkwyk | 30/05/2016 - 11:13 | |||
HIA Erf 8019, Cape Town | Heritage Impact Assessment submitted in terms of section 38(4) of the National Heritage Resources Act Report for comment Sir Lowry Square Erf 8019, Cape Town prepared for Errol Family Fall Trust 3 August 2020 | Heritage Impact Assessment Specialist Reports | 04/08/2020 | Vidamemoria | 05/08/2020 - 14:57 | |||
Boven PV1 report HIA | HERITAGE IMPACT ASSESSMENT FOR THE PROPOSED BOVEN SOLAR PV1 FACILITY, KENHARDT MAGISTERIAL DISTRICT, NORTHERN CAPE | Heritage Impact Assessment Specialist Reports | 17/11/2014 | Jayson Orton | ASHA Consulting(Pty) Ltd | Mulilo Renewable Project Developments (Pty) Ltd | 13/01/2015 - 15:09 | |
HIA, housing on Farms 475 & 476, Elandskloof, Clanwilliam | HERITAGE IMPACT ASSESSMENT REPORT: PROPOSED HOUSING AND ASSOCIATED INFRASTRUCTURE DEVELOPMENT ELANDSKLOOF. CASE NO: 130530JW35E | Heritage Impact Assessment Specialist Reports | 01/02/2014 | Henry Aikman | AIKMAN ASSOCIATES HERITAGE MANAGEMENT | CTS_503705 | 18/04/2018 - 11:06 | |
HIA: EZIKHUMBENI CAUSEWAY | HERITAGE IMPACT ASSESSMENT OF THE PROPOSED EZIKHUMBENI CAUSEWAY IN ULUNDI MUNICIPAL AREA, NORTERN KWAZULU-NATAL | Heritage Impact Assessment Specialist Reports | 14/02/2014 | Frans Prins | Active Heritage CC | Green Door Environmental | 17/02/2014 - 12:11 | |
HIA-BlackwoodPowerline | Proposed Blackwood Solar Energy Facility on Portion 1 of Pandamsfontein 1593, South East of Kimblery, in the Tokologo Local Municipality, Free State: Heritage Impact Assessment Report | Heritage Impact Assessment Specialist Reports | 25/08/2014 | David Morris | McGregor Museum | Savannah Environmental (Pty) Ltd | 24/03/2015 - 10:48 | |
Heritage Impact Assesment | Heritage Impact Assessment for New Surface Infrastructure at United Manganese Kalahari, Hozatel Northern Cape Province | Heritage Impact Assessment Specialist Reports | 11/03/2022 | Jaco van der Walt | HCAC Heritage Consultants | SLR Consulting (Africa) (Pty) Ltd | 25/03/2022 - 11:07 | |
Tlisitseng 1 132kV Substation and Power Line Heritage Report | TLISITSENG PROJECT - TLISITSENG 1 SUBSTATION AND POWER LINE Heritage Impact Assessment | Heritage Impact Assessment Specialist Reports | 29/06/2017 | Wouter Fourie | PGS Heritage and Grave Relocation Consultants | Sivest - Gauteng | 07/07/2017 - 11:46 | |
The proposed reclamation of the Soweto Cluster Dumps | The proposed reclamation of the Soweto Cluster Dumps, Bramfischerville, City of Johannesburg Metropolitan Municipality, Gauteng Province. | Heritage Impact Assessment Specialist Reports | 16/10/2019 | Jennifer Kitto | PGS Heritage (Pty) Ltd | Kongiwe Environmental (Pty) Ltd | 10/01/2020 - 11:17 | |
Heritage amendment comparative study | Heritage Impact Assessment Specialist Reports | 09/03/2021 | Jenna Lavin | Cedar Tower Services | Savannah Environmental (Pty) Ltd | 11/03/2021 - 11:19 | ||
HIA for Hotazel Solar Park Transmission lines | HERITAGE IMPACT ASSESSMENT FOR PROPOSED POWER LINES NEAR HOTAZEL, KURUMAN MAGISTERIAL DISTRICT, NORTHERN CAPE | Heritage Impact Assessment Specialist Reports | 06/02/2017 | Jayson Orton | juwi Renewable Energies South Africa (Pty) Ltd | Aurecon South Africa (Pty) Ltd | 06/04/2017 - 19:05 | |
HIA for Delta solar PV | Heritage Impact Assessment for delta solar PV | Heritage Impact Assessment Specialist Reports | J van Schalkwyk | 28/05/2020 - 00:55 | ||||
Heritage Impact Assessment for Lyra 1 Solar Park | Heritage Impact Assessment for the Proposed Renewable Energy Generation Project by Lyra Energy (Pty) Ltd (Lyra 1 Solar Park) on Farm Welgelegen, 469-LQ with Overhead Powerlines to the Eskom Matimba Substation and/or to the Eskom Waterberg Distribution Substation, within the Lephalale Local Municipality, Waterberg District Municipality. | Heritage Impact Assessment Specialist Reports | 23/03/2023 | Jaco van der Walt | Beyond Heritage | 19/05/2023 - 11:21 | ||
Heritage Impact Assessment - PR11296 | Phase 1 Heritage Impact Assessment for proposed prospecting drilling on Portion 2 of Rozynbosch No.41 and Remaining Extent & Portion 1 of Wortel No. 42, Namaqualand District, NC Province. | Heritage Impact Assessment Specialist Reports | 09/12/2015 | Lloyd Rossouw | Paleo Field Services | Black Mountain Mining (PTY) LTD | 10/12/2015 - 11:47 | |
K4 Shaft PCD HIA | Heritage Impact Assessment K4 Draft Final_1 | Heritage Impact Assessment Specialist Reports | 12/07/2023 | Jaco van der Walt | Beyond Heritage | Alta van Dyk Environmental Consultants cc | 04/09/2023 - 13:01 | |
Phase 1 Heritage Resource Impact Assessment (Scoping & Evaluation) PROPOSED UPGRADING OF EXISTING LOW-LEVEL BRIDGE GA-MAWELA VILLAGE, STEELPOORT, LIMPOPO | Phase 1 Heritage Resource Impact Assessment (Scoping & Evaluation) PROPOSED UPGRADING OF EXISTING LOW-LEVEL BRIDGE GA-MAWELA VILLAGE, STEELPOORT, LIMPOPO STATEMENT WITH REGARD TO HERITAGE RESOURCES MANAGEMENT | Heritage Impact Assessment Specialist Reports | 19/09/2012 | Liesl Stegmann | Shasa Heritage Consultants CC | Polygon Environmental Planning CC | 11/03/2016 - 09:08 | |
Rondekop Heritage Reports | ENVIRONMENTAL IMPACT ASSESSMENT (EIA) FOR THE PROPOSED 325MW RONDEKOP WIND ENERGY FACILITY BETWEEN MATJIESFONTEIN SUTHERLAND IN THE NORTHERN CAPE PROVINCE Heritage Impact Assessment | Heritage Impact Assessment Specialist Reports | 10/09/2018 | Wouter Fourie | PGS Heritage (Pty) Ltd | SiVEST SA (Pty) Ltd | 14/11/2018 - 17:30 | |
Heritage Impact Assessment | Heritage Impact Assessment Eskom Camden Power Station | Heritage Impact Assessment Specialist Reports | 04/07/2020 | Edward Matenga | Green Gold Consulting | Eskom Generation | 13/08/2020 - 14:21 | |
Klipkraal WEF 2 Heritage Report | PROPOSED CONSTRUCTION OF THE KLIPKRAAL WIND ENERGY FACILITY 2, NEAR FRASERBURG, NORTHERN CAPE PROVINCE, SOUTH AFRICA | Heritage Impact Assessment Specialist Reports | 19/08/2022 | Wouter Fourie | PGS Heritage (Pty) Ltd | SiVEST SA (Pty) Ltd | 16/09/2022 - 16:42 | |
HIA and PIA for Skeerhok PV2 | Heritage Impact Assessment Specialist Reports | 21/02/2018 - 15:39 | ||||||
Heritage Comment Letter 11.10.18 | Heritage Comment Letter for the Splitting of Approved Sold Invictus 3, Out Taaibosmond 66/5, near Aggeneys into PV3 and PV5 | Heritage Impact Assessment Specialist Reports | 11/10/2018 | Jayson Orton | ASHA Consulting(Pty) Ltd | Savannah Environmental (Pty) Ltd | 18/10/2018 - 08:30 | |
Heritage Impact Assessment Report (Jan'22) | Sun Garden App I - HIA | Heritage Impact Assessment Specialist Reports | 11/01/2022 | Cherene de Bruyn | PGS Heritage (Pty) Ltd | Savannah Environmental (Pty) Ltd | 12/01/2022 - 13:41 | |
Heritage Comment Letter 11.08.18 (SI PV4) | Heritage Comment Letter for the Splitting of Approved Sol Invictus PV4, Out Taaibosmond 66/5, near Aggeneys into PV4 and PV6 | Heritage Impact Assessment Specialist Reports | 11/10/2018 | Jayson Orton | ASHA Consulting(Pty) Ltd | Savannah Environmental (Pty) Ltd | 18/10/2018 - 08:41 | |
Highlands WEFs HIA | Heritage Impact Assessment: Highlands Wind Energy Facility and associated Grid Connections, Somerset East Magisterial District, Eastern Cape | Heritage Impact Assessment Specialist Reports | 23/08/2018 | Jayson Orton, John Almond | ASHA Consulting(Pty) Ltd | Arcus Consulting | 18/09/2018 - 15:33 | |
HIA, DR 01725, expansion of existing borrow pit, Prince Albert Townlands | Heritage Impact Assessment: DR 01725 Central Karoo Clanwillian – Central Karoo District Municipality, Western Cape | Heritage Impact Assessment Specialist Reports | 27/02/2013 | Vidamemoria Heritage Consultants | Nadeson Consulting Services | CTS_503483 | 12/04/2018 - 18:53 | |
Blurock Powerline Deviation | 1 Colenso/Gowrie 88kV 2.2km Powerline Deviation | Heritage Impact Assessment Specialist Reports | 16/05/2013 | Frans Prins | Eskom Holdings SOC Ltd | 04/10/2013 - 01:17 | ||
Leeudoringstad 5MW Solar PV Power Plant Heritage Report | Leeuwbosch 44 5MW Solar Photovoltaic (PV) Power Plant Heritage Impact Report | Heritage Impact Assessment Specialist Reports | 10/11/2016 | Wouter Fourie | PGS Heritage and Grave Relocation Consultants | Sivest - Gauteng | 16/11/2016 - 17:05 | |
2019JvS081N3Bridge | THE PROPOSED CONSTRUCTION OF A SECOND CARRIAGEWAY ON THE N3 TOLL ROAD BETWEEN THE WILGE PLAZA AND THE VAAL RIVER, VILLIERS REGION, FREE STATE PROVINCE | Heritage Impact Assessment Specialist Reports | 31/07/2019 | 22/11/2019 - 15:44 | ||||
Updated !Xha Boom Grid Heritage Impact Assessment Report 2 | Xha! Wind Energy Facility (WEF) – 132kV Grid connection and substation Heritage Impact Report | Heritage Impact Assessment Specialist Reports | 20/02/2018 | Wouter Fourie | PGS Heritage (Pty) Ltd | Sivest - Gauteng | 23/03/2018 - 18:08 | |
Hyperion PV4 - HIA 27.03.19 | Heritage Impact Assessment:Proposed Hyperion Solar Development 4, Lyndoch 432/Rem, Kuruman Magisterial District, Northern Cape | Heritage Impact Assessment Specialist Reports | 27/03/2019 | Jayson Orton | ASHA Consulting(Pty) Ltd | Savannah Environmental (Pty) Ltd | 11/04/2019 - 12:45 | |
Heritage Impact Assessment (Nov'21) | Appendix I - Heritage Impact Assessment | Heritage Impact Assessment Specialist Reports | 11/11/2021 | Cherene de Bruyn | PGS Heritage (Pty) Ltd | Savannah Environmental (Pty) Ltd | 12/11/2021 - 08:41 | |
LAN3111_NID | Notification of Intent to Develop for the Lanxess Chrome Mine: Section 102 Amendment | Heritage Impact Assessment Specialist Reports | 02/03/2015 | Natasha Higgitt | Digby Wells Environmental | Lanxess Chrome Mine (Pty) Ltd | 22/09/2015 - 15:36 | |
Mayogi PV Heritage Impact Assessment | PROPOSED MAYOGI SOLAR PHOTOVOLTAIC (PV) RENEWABLE ENERGY FACILITY NEAR KIRKWOOD, EASTERN CAPE | Heritage Impact Assessment Specialist Reports | 31/07/2023 | Jenna Lavin | CTS Heritage | SiVEST SA (Pty) Ltd | 11/09/2023 - 10:42 | |
HIA: Lidgetton West, KZN | CULTURAL HERITAGE IMPACT ASSESSMENT OF RIETVALLEI FARM, KWAZULU-NATAL | Heritage Impact Assessment Specialist Reports | 01/10/2011 | Frans Prins | Active Heritage CC | Green Door Environmental | 06/03/2014 - 07:08 | |
WAGENMAKERSDRIFT 24 JACOBSDAL | FIRST PHASE ARCHAEOLOGICAL & HERITAGE ASSESSMENT OF THE PROPOSED DIAMOND PROSPECTING AT WAGENMAKERSDRIFT 24, JACOBSDAL, FREE STATE | Heritage Impact Assessment Specialist Reports | 19/09/2014 | Cobus Dreyer | De Beers Consolidated Mines (Pty) Ltd | De Beers Consolidated Mines (Pty) Ltd | 21/09/2014 - 16:49 | |
Heritage Impact Assessment of the SANBI KZN Herbarium, Durban Botanic Gardens, 4 Problem Mkhize Road | Heritage Impact Assessment of the SANBI KZN Herbarium, Durban Botanic Gardens, 4 Problem Mkhize Road | Heritage Impact Assessment Specialist Reports | 01/07/2014 | Deborah Whelan | Archaic Consulting | Futureworks Sustainability Consulting (Pty) Ltd. | 07/06/2016 - 12:03 | |
Wepcor Mining and Minerals (Pty) Ltd- FS 10298 EM | Basic Assessment Report and Environmental Management Programme for a Mining Permit application situated in the remaining extent of the Wepener Dorpsgronden | Heritage Impact Assessment Specialist Reports | 10/08/2020 | 18/08/2020 - 14:39 | ||||
Heritage Impact Assessment (HIA) for the proposed Sekuruwe Water Treatment Works (WTW) Project | Heritage Impact Assessment (HIA) for the proposed Sekuruwe Water Treatment Works (WTW) Project | Heritage Impact Assessment Specialist Reports | 28/09/2023 | PGS Heritage (Pty) Ltd | 18/10/2023 - 13:46 | |||
A PHASE I HERITAGE IMPACT ASSESSMENT (HIA) STUDY FOR MARULA PLATINUM’S PROPOSED NEW MINE INFRASTRUCTURE IN THE STEELPOORT VALLLEY LIMPOPO PROVINCE | A PHASE I HERITAGE IMPACT ASSESSMENT (HIA) STUDY FOR MARULA PLATINUM’S PROPOSED NEW MINE INFRASTRUCTURE IN THE STEELPOORT VALLLEY LIMPOPO PROVINCE | Heritage Impact Assessment Specialist Reports | Dr Julius CC Pistorius | 26/04/2022 - 09:48 | ||||
HIA for the proposed 75MW PV Solar Facility on Mierdam Farm | Heritage impact assessment for the PROPOSED ESTABLISHMENT OF A PV SOLAR FACILITY BY SOUTH AFRICA MAINSTREAM RENEWABLE POWER MIERDAM (PTY) LTD ON THE FARM MIERDAM IN THE PRIESKA REGION NORTHERN CAPE PROVINCE | Heritage Impact Assessment Specialist Reports | 17/01/2013 | Sivest - Gauteng | Mainstream Renewable Power South Africa (Pty) Ltd | 14/02/2013 - 13:15 | ||
HIA FOR THE PROPOSED KOMSBERG EAST AND WEST WIND ENERGY FACILITIES AND ASSOCIATED GRID CONNECTIONS (SHARED) | HERITAGE IMPACT ASSESSMENT FOR THE PROPOSED KOMSBERG EAST AND WEST WIND ENERGY FACILITIES AND ASSOCIATED GRID CONNECTIONS (SHARED) | Heritage Impact Assessment Specialist Reports | 15/11/2015 | Timothy Hart | ACO Associates CC | Arcus Consulting | 18/05/2016 - 10:40 |