THIS IS THE ARCHIVE FOR SAHRIS 1.0
THIS SITE IS NOW AN ARCHIVE AND IS NOT SUITABLE FOR MAKING APPLICATIONS
Please be aware that no content and application creation or changes to information on this version of SAHRIS will be retained.
To make applications or utilise SAHRIS for the creation of information, please use the new site:
https://sahris.org.za
Changes to SAHRIS!
The South African Heritage Resources Information System (SAHRIS) has undergone a generational upgrade and restructure. These changes to the site include, but are not limited to:
- A new & modernised look and layout
- Improved site usage flows with respect to applications and content creation
- Improved site performance and stability
Launch for the new version of SAHRIS occurred on Monday the 30th of October 2023.
The new site can be found here:
SAHRIS | SAHRIS
Displaying 17401 - 17450 of 18975
ReportRef | ReportTitle | ReportType | ReportDate | Authors | AuthoringBody | CommissioningCompany | MapID < 2009 | Post date |
---|---|---|---|---|---|---|---|---|
A PHASE 1 HIA REPORT ON PORTIONS 36 & 83 OF THE FARM ZWARTKOPPIES 296JQ | A PHASE 1 HIA REPORT ON PORTIONS 36 & 83 OF THE FARM ZWARTKOPPIES 296JQ NORTH OF MARIKANA, BOJANALA DISTRICT MUNICIPALITY NORTHWEST PROVINCE - APAC020/37 | HIA Phase 1 | 21/05/2020 | Anton Pelser | APELSER ARCHAEOLOGICAL CONSULTING | Barnard van Rensburg Stam (Pty) Ltd | 10/06/2020 - 09:02 | |
A PHASE 1 HIA REPORT FOR THE PROPOSED TOWNSHIP DEVELOPMENT OF MALAMULELE | A PHASE 1 HIA REPORT FOR THE PROPOSED TOWNSHIP DEVELOPMENT OF MALAMULELE EXTENTION E AT MALAMULELE, WITHIN THE COLLINS CHABANE LOCAL MUNICIPALITY, LIMPOPO PROVINCE. | Heritage Impact Assessment Specialist Reports | 22/07/2022 | Anton Pelser | APELSER ARCHAELOGICAL CONSULTING | 24/10/2022 - 11:44 | ||
A PHASE 1 HIA REPORT FOR MALAMULELE EXTENSION E | A PHASE 1 HIA REPORT FOR THE PROPOSED TOWNSHIP DEVELOPMENT OF MALAMULELE EXTENSION E AT MALAMULELE, WITHIN THE COLLINS CHABANE LOCAL MUNICIPALITY, LIMPOPO PROVINCE. | Heritage Impact Assessment Specialist Reports | 22/07/2022 | Anton Pelser | APELSER ARCHAELOGICAL CONSULTING | 24/10/2022 - 09:52 | ||
A PHASE 1 HIA REPORT FOR THE PROPOSED CONSTRUCTION OF A | A PHASE 1 HIA REPORT FOR THE PROPOSED CONSTRUCTION OF A CARAVAN PARK AND ASSOCIATED INFRASTRUCTURE AT MATHOLYWENI REST CAMP WITHIN THE ADDO ELEPHANT NATIONAL PARK, EASTERN CAPE PROVINCE. APAC013/73 | HIA Phase 1 | 11/11/2013 | Anton Pelser | A Pelser Archaeological Consulting | Delron Environmental Assessment Practitioners | 11/12/2013 - 14:39 | |
BELA BELA HIA | A Phase 1 HIA Report for the Proposed Bela-Bela Commercial Park Development on the Remainder of Portion 25 of the farm Het Bad 465KR in the Bela-Bela Local Municipality of the Limpopo Province | HIA Phase 1 | 01/07/2023 | Anton Apelser | APELSER ARCHAELOGICAL CONSULTING | APELSER ARCHAELOGICAL CONSULTING | 28/07/2023 - 10:17 | |
EDA Phase 1 | A PHASE 1 HIA REPORT FOR THE ESTATE D’AFRIQUE NEW ACCESS ROAD PROJECT ON PORTIONS OF THE FARMS HARTEBEESTPOORT 482JQ & WELGEGUND 491JQ NEAR HARTEBEESTPOORT DAM, NORTHWEST PROVINCE | AIA Phase 1 | 31/10/2019 | Anton Pelser | APELSER ARCHAEOLOGICAL CONSULTING | 02/12/2019 - 12:54 | ||
A Phase 1 HIA Rpeort for the Corobrik Rietvlei Quarry Mining Rigth Amendment Application | A PHASE 1 HIA REPORT FOR THE COROBRIK RIETVLEI QUARRY MINING RIGHT AMENDMENT APPLICATION IN TERMS OF SECTION 102 OF MPRDA ON REMAINING EXTENT PORTIONS 26 (A PORTION OF PORTION 1) & 27 (A PORTION OF PORTION 26) OF THE FARM WITKOPPIES 393JR IN THE CITY OF TSHWANE & EKURHULENI METROPOLITAN MUNICIPALITIES OF GAUTENG - APAC023/73 | HIA Phase 1 | 14/08/2023 | Anton Pelser | APELSER ARCHAELOGICAL CONSULTING | Licebo Environmental and Mining (Pty) Ltd | 20/09/2023 - 08:28 | |
PHASE 1 HIA - Associated Lime & Chemicals, NC | A PHASE 1 HIA REPORT FOR THE LIMESTONE PROSPECTING RIGHTS LOCATED ON VARIOUS FARMS SOUTH-EAST OF KURUMAN, NORTHERN CAPE PROVINCE | HIA Phase 1 | 21/12/2020 | Anton Pelser | EcoPartners | 21/12/2020 - 11:18 | ||
Phase 1 Heritage study | A PHASE 1 HIA REPORT FOR A PROPOSED TOWNHSIP DEVELOPMENT ON THE REMAINDER OF THE FARM LEEUPOORT 283JS & PTN 79 OF BLESBOKLAAGTE 296JS, EMALAHLENI, MPUMALANGA | HIA Phase 1 | 02/06/2014 | Anton Pelser | Pr. Aracheologist/Heritage Specialist | 22/04/2015 - 11:28 | ||
A PHASE 1 HIA REPORT FOR A PROPOSED TOWNHSHIP DEVELOPMENT ON THE REMAINDER OF THE FARM LEEUPOORT 283JS & PTN 79 OFBLESBOKLAAGTE 296JS | A PHASE 1 HIA REPORT FOR A PROPOSED TOWNHSIP DEVELOPMENT ON THE REMAINDER OF THE FARM LEEUPOORT 283JS & PTN 79 OF BLESBOKLAAGTE 296JS, EMALAHLENI, MPUMALANGA | HIA Phase 1 | 14/01/2019 - 15:57 | |||||
A PHASE 1 HIA REPORT FOR A PROPOSED PROSPECTING APPLICATION ON VARIOUS PORTIONS OF THE FARM BUFFELSDRAAI 151JQ | A PHASE 1 HIA REPORT FOR A PROPOSED PROSPECTING APPLICATION ON VARIOUS PORTIONS OF THE FARM BUFFELSDRAAI 151JQ IN THE ASSEN AREA OF THE BRITS DISTRICT, MADIBENG LOCAL MUNICIPALITY NORTHWEST PROVINCE - APAC020/62 | HIA Phase 1 | 07/08/2020 | Anton Pelser | APELSER ARCHAEOLOGICAL CONSULTING | Dikwena Minerals (Pty) Ltd | 09/08/2020 - 11:06 | |
PHASE 1 HIA & REPORT FOR THE PROPOSED RIETVLEI EXTENSION 24 TOWNSHIP DEVELOPMENT | A PHASE 1 HIA & REPORT FOR THE PROPOSED RIETVLEI EXTENSION 24 TOWNSHIP DEVELOPMENT LOCATED ON PORTION 712 OF THE FARM DOORNKLOOF 391JR TSHWANE METROPOLITAN AREA, GAUTENG | HIA Phase 1 | 06/08/2021 | 15/11/2021 - 08:55 | ||||
PHASE 1 HIA & REPORT FOR THE PROPOSED RIETVLEI EXTENSION 24 TOWNSHIP DEVELOPMENT | A PHASE 1 HIA & REPORT FOR THE PROPOSED RIETVLEI EXTENSION 24 TOWNSHIP DEVELOPMENT LOCATED ON PORTION 712 OF THE FARM DOORNKLOOF 391JR TSHWANE METROPOLITAN AREA, GAUTENG | HIA Phase 1 | 09/12/2021 | 04/01/2022 - 09:41 | ||||
PHASE 1 HIA & REPORT FOR THE PROPOSED RIETVLEI EXTENSION 24 TOWNSHIP DEVELOPMENT | A PHASE 1 HIA & REPORT FOR THE PROPOSED RIETVLEI EXTENSION 24 TOWNSHIP DEVELOPMENT LOCATED ON PORTION 712 OF THE FARM DOORNKLOOF 391JR TSHWANE METROPOLITAN AREA, GAUTENG | HIA Phase 1 | 09/12/2021 | 04/01/2022 - 09:45 | ||||
9-2-253-0022-20071101-ACHMC | A Phase 1 Hertige Impact Study for a Proposed New 132 kV Power Line Running from the Witkop Substation to the Lebowa Substation in the Limpopo Province | AIA Phase 1 | 01/11/2007 | Julius CC Pistorius | MAPID_01477 | 16/06/2012 - 14:39 | ||
Phase 1 Heritage Impact Assessment of the farm Rooidam 101 near Windsorton, Northern Cape | A Phase 1 Heritage Impact Assessment was carried out on the farm Rooidam 101 near Windsorton in the Northern Cape Province. Identification and mapping of possible heritage resources within the proposed project area, an assessment of their significance, related impact by the proposed development and recommendations for mitigation where relevant. | HIA Phase 1 | 10/06/2016 | Lloyd Rossouw | National Museum Bloemfontein - Archaeology and Anthropology | National Museum Bloemfontein | 04/07/2019 - 12:51 | |
Phase 1 Heritage Impact Assessment for the proposed new Good Hope Solar PV facility near Dealesville, Free State Province. | A phase 1 Heritage Impact Assessment was carried out for the establishment of a proposed new solar PV facility on the farms Goede Hoop 1028, Epsom Downs 1216 and Gedenksrust 1029 near Dealesville in the Free State province. Good Hope 2 largely covers “degraded” farmland terrain (in the sense that it has either been ploughed or used for pasture or both in the past) and is partially underlain by Permian shales and siltstones of the Tierberg Formation (Ecca Group), that are covered by a well-developed and calcrete-rich aeolian sand overburden. There is no aboveground evidence of historically significant building structures older than 60 years, intact Stone Age archaeological remains, graves or material of cultural significance within the confines of the two development footprints. | HIA Phase 1 | 30/10/2021 | Lloyd Rossouw | Exigent Engineering Consultants | Ophiucus Energy (Pty) Ltd. | 30/05/2022 - 22:08 | |
AIA_Grootvlei_Pistorius_JCC_Dec10 | A Phase 1 Heritage Impact Assessment stydy for a proposed photovoltaic soal power installation (solar plant) at Grootvlei near Balfour in the Mpumalanga Province of South Africa. | AIA Phase 1 | 01/12/2010 | Julius CC Pistorius | 16/06/2012 - 14:45 | |||
9-2-275-0001-20070801-ACHMC | A Phase 1 Heritage Impact Assessment Study for Water and Sewage Pipeline Corridors near Vanderbijlpark in the Gauteng Province of South Africa | AIA Phase 1 | 01/08/2007 | Julius CC Pistorius | MAPID_00856 | 16/06/2012 - 14:41 | ||
9-2-284-0009-20080201-ACHMC | A Phase 1 Heritage Impact Assessment Study for Total Coal South Africa's (TCSA) Proposed New Expansion of the Dorsfontein Coal Mine (DCM) near Kriel on the Eastern Highveld in the Mpumalanga Province of South Africa | AIA Phase 1 | 01/02/2008 | Julius CC Pistorius | MAPID_01718 | 16/06/2012 - 14:41 | ||
9-2-236-0002-20080401-ACHMC | A Phase 1 Heritage Impact Assessment Study for the Upgrading of Eskom's Hilltop Substation on the Farm Hilltop 458 near Nelspruit in the Mpumalanga Province | AIA Phase 1 | 01/04/2008 | Julius CC Pistorius | MAPID_01713 | 16/06/2012 - 14:39 | ||
Heritage Report for Sannaspos Solar Facilities - 360 | A Phase 1 Heritage impact assessment study for the proposed photovoltaic (PV) solar energy facilities (in Sannaspos), near Bloemfontein, Free State Province: DEA Ref No: 14/12/16/3/3/2/360 (Phase 1); DEA Ref No: 14/12/16/3/3/1/615 (Phase 2) | HIA Phase 1 | 07/07/2013 | Nkosinathi Godfrey Tomose | Savannah Environmental (Pty) Ltd | Zone Land Solutions | 11/03/2013 - 13:28 | |
9-2-212-0013-20080601-ACHMC | A Phase 1 Heritage Impact Assessment Study for the Proposed New Pwv 3 Road Running Across Pampoennek near the Hartebeespoortdam in the Magaliesberg in the North-West Province of South Africa | HIA Phase 1 | 01/06/2008 | Julius CC Pistorius | MAPID_02140 | 16/06/2012 - 14:38 | ||
9-2-222-0002-20070601-ACHMC | A Phase 1 Heritage Impact Assessment Study for the Proposed New 88 kV Power Line Running from the Majuba Power Station near Amersfoort to the Camden Power Station near Ermelo in the Mpumalanga Province | AIA Phase 1 | 01/06/2007 | Julius CC Pistorius | MAPID_01147 | 16/06/2012 - 14:38 | ||
9-2-236-0002-20080401c-ACHMC | A Phase 1 Heritage Impact Assessment Study for the Proposed New 132 kV Power Line Running from the Nkomazi Substation and the Proposed New Fig Tree Substation in the Mpumalanga Province | AIA Phase 1 | 01/04/2008 | Julius CC Pistorius | MAPID_02306 | 16/06/2012 - 14:39 | ||
Phase 1 HIA for the Turfvlakte Open Pit Project (updated) | A Phase 1 Heritage Impact Assessment Study for the Proposed Exxaro Turfvlakte Open Pit Project near Lephalale in the Limpopo Province. | HIA Phase 1 | 01/06/2020 | Dr Julius CC Pistorius | Dr Julius CC Pistorious Archaeologist and heritage Consultant | Golder Associates Africa (Pty) Ltd | 06/11/2020 - 06:50 | |
Phase 1 HIA for the Turfvlakte Open Pit Project | A Phase 1 Heritage Impact Assessment Study for the Proposed Exxaro Turfvlakte Open Pit Project near Lephalale in the Limpopo Province | HIA Phase 1 | 01/03/2018 | Julius CC Pistorius | Dr Julius CC Pistorious Archaeologist and heritage Consultant | Golder Associates Africa (Pty) Ltd | 22/01/2020 - 14:27 | |
A Phase 1 Heritage Impact Assessment Study, Charlestown, KwaZulu-Natal Province, South Africa | A PHASE 1 HERITAGE IMPACT ASSESSMENT STUDY FOR THE PROPOSED CHARLESTOWN HOUSING DEVELOPMENT, KWAZULU-NATAL, SOUTH AFRICA. PROJECT NO: K12020009 | HIA Phase 1 | 20/03/2013 | Nkosinathi Godfrey Tomose | ENPROCON (Pty) Ltd | 06/06/2013 - 13:42 | ||
HIA for Sorata-Witsieshoek 132kV Line, Phuthaditjhaba, Free State Province, South Africa | A PHASE 1 HERITAGE IMPACT ASSESSMENT STUDY FOR THE PROPOSED 132kV LINES - SORATA-WITSIESHOEK, PHUTHADITJHABA, FREE STATE PROVINCE, SOUTH AFRICA. | HIA Phase 1 | 10/02/2013 | Nkosinathi Godfrey Tomose | Margen Industrial Service cc | 06/06/2013 - 15:03 | ||
AIA_Jane_Furse_Substation_Pistorius_JCC_Oct10 | A Phase 1 Heritage Impact Assessment Study for the Eskom's proposed new 132 Kv Power Line running between Jane Furse substation and Mamatshekele in the Limpopo Province of South Africa | AIA Phase 1 | 01/10/2010 | Julius CC Pistorius | 16/06/2012 - 14:46 | |||
AIA_Dwaalkop_Mining_Pistorius_JCC_Mar09 | A Phase 1 Heritage Impact Assessment Study for Lonmin' Proposed New Dwaalkop Mining operations near Lebowakgomo in Chuniespoort in the Limpopo Province. | AIA Phase 1 | 01/03/2009 | Julius CC Pistorius | 16/06/2012 - 14:44 | |||
Nokeng Fluorspar | A Phase 1 heritage impact assessment study for Eskom's proposed Nokeng Fluorpsar project: The construction of a new 132Kv Power Line between the Rust de Winter Substation and the proposed new Nokeng Substation with associated Infrastructure near Rust De Winter in the Limpopo province of South Africa | AIA Phase 1 | 01/06/2011 | Julius CC Pistorius | Texture Environmental Consultants | 25/09/2012 - 11:06 | ||
Phase 1 Eskom Pienaarsriver CNC HIA Study | A Phase 1 Heritage Impact Assessment Study for Eskom's Proposed CNC in Pienaarsrivier in the Limpopo Province | HIA Phase 1 | 20/09/2013 | Julius CC Pistorius | Texture Environmental Consultants | 30/03/2014 - 17:51 | ||
Phase 1 Eskom Pienaarsriver CNC HIA Study | A Phase 1 Heritage Impact Assessment Study for Eskom's Proposed CNC in Pienaarsrivier in the Limpopo Province | HIA Phase 1 | 20/09/2013 | Julius CC Pistorius | Texture Environmental Consultants | 30/03/2014 - 17:51 | ||
Phase 1 Eskom Pienaarsriver CNC HIA Study | A Phase 1 Heritage Impact Assessment Study for Eskom's Proposed CNC in Pienaarsrivier in the Limpopo Province | HIA Phase 1 | 20/09/2013 | Julius CC Pistorius | Texture Environmental Consultants | 30/03/2014 - 17:52 | ||
Phase 1 Eskom Pienaarsriver CNC HIA Study | A Phase 1 Heritage Impact Assessment Study for Eskom's Proposed CNC in Pienaarsrivier in the Limpopo Province | HIA Phase 1 | 20/09/2013 | Julius CC Pistorius | Texture Environmental Consultants | 30/03/2014 - 17:52 | ||
Phase 1 Eskom Pienaarsriver CNC HIA Study | A Phase 1 Heritage Impact Assessment Study for Eskom's Proposed CNC in Pienaarsrivier in the Limpopo Province | HIA Phase 1 | 20/09/2013 | Julius CC Pistorius | Texture Environmental Consultants | 30/03/2014 - 17:52 | ||
Pelly-Warmbad HIA 27 May 13 | A Phase 1 Heritage Impact assessment Study for Eskom's Poposed 132kV Chikadee Power Line (Loop-Out) from the Warmbad-Pelly 132 kV Backbone to the Rust de Winter Substation | HIA Phase 1 | 31/05/2013 | 19/11/2013 - 10:40 | ||||
9-2-269-0017-20070901-ACHMC | A Phase 1 Heritage Impact Assessment Study for a Proposed New Tshino Substation on the Farm Schuynshoogte 29 LT in the Limpopo Province | AIA Phase 1 | 01/09/2007 | Julius CC Pistorius | MAPID_01796 | 16/06/2012 - 14:40 | ||
9-2-281-0002-20070901-ACHMC | A Phase 1 Heritage Impact Assessment Study for a Proposed New 132 kV Power Line Running from the New Matlabas Substation to the Proposed New Bulge Substation in the Limpopo Province | AIA Phase 1 | 01/09/2007 | Julius CC Pistorius | MAPID_01482 | 16/06/2012 - 14:41 | ||
AIA_MarathonNC-MetaffinMP_Pistorius_JCC_Sep07 | A Phase 1 Heritage Impact Assessment Study for a Proposed New 132 kV Power Line Running from the Existing Marathon/Northern Cape Power Line to the Proposed New Metaffin Substation near Nelspruit in the Mpumalanga Province | AIA Phase 1 | 01/09/2007 | Julius CC Pistorius | 16/06/2012 - 14:47 | |||
9-2-253-0027-20071101-ACHMC | A Phase 1 Heritage Impact Assessment Study for a Proposed New 132 kV Power Line Between the Existing Voorspoed Substation and the Proposed New Dwaalkop Substation near Chuniespoorr in the Limpopo Province | AIA Phase 1 | 01/11/2007 | Julius CC Pistorius | MAPID_01479 | 16/06/2012 - 14:39 | ||
HIA for Wolmerton PRASA Depot Upgrade | A Phase 1 Heritage Impact Assessment Report for the Proposed Wolmerton PRASA Depot Upgrade as part of PRASA Railway Modernization Project | 09/07/2013 | Nkosinathi Godfrey Tomose | Ecosolve (Pty) Ltd | 05/09/2013 - 22:21 | |||
Phase 1 Heritage Impact Assessment Report for the Proposed Wolmerton PRASA Depot | A Phase 1 Heritage Impact Assessment Report for the Proposed Wolmerton PRASA Depot Upgrade as part of PRASA Railway Modernization Project | 09/07/2013 | Nkosinathi Godfrey Tomose | Ecosolve (Pty) Ltd | 06/09/2013 - 07:05 | |||
HIA for the Proposed Springfield PRASA Depot Upgrade | A Phase 1 Heritage Impact Assessment Report for the Proposed Springfield PRASA Depot Upgrade as part of PRASA Railway Modernization Project | HIA Phase 1 | 09/07/2013 | Nkosinathi Godfrey Tomose | Ecosolve (Pty) Ltd | 05/09/2013 - 22:28 | ||
HIA for the Proposed Springfield PRASA Depot Upgrade | A Phase 1 Heritage Impact Assessment Report for the Proposed Springfield PRASA Depot Upgrade as part of PRASA Railway Modernization Project | HIA Phase 1 | 09/07/2013 | Nkosinathi Godfrey Tomose | Ecosolve (Pty) Ltd | 05/09/2013 - 22:28 | ||
Johandeo - HIA | A PHASE 1 HERITAGE IMPACT ASSESSMENT REPORT FOR THE PROPOSED JOHANDEO PHASE 2 TOWNSHIP ESTABLISHMENT SITUATED ON THE REMAINDER OF PORTION 8 OF THE FARM RIETKUIL 554 IQ, EMFULENI LOCAL MUNICIPALITY IN GAUTENG PROVINCE. | Heritage Scoping | 01/02/2022 | Trust Mlilo | Integrated Specialist Services | 24/10/2022 - 11:57 | ||
HIA for the Proposed Durban Yard PRASA Depot Upgrade | A Phase 1 Heritage Impact Assessment Report for the Proposed Durban Yard PRASA Depot Upgrade as part of PRASA Railway Modernization Project | HIA Phase 1 | 15/07/2013 | Nkosinathi Godfrey Tomose | Ecosolve (Pty) Ltd | 06/09/2013 - 06:41 | ||
HIA for the Proposed Braamfontein PRASA Depot Upgrade | A Phase 1 Heritage Impact Assessment Report for the Proposed Braamfontein PRASA Depot Upgrade as part of PRASA Railway Modernization Project | HIA Phase 1 | 16/07/2013 | Nkosinathi Godfrey Tomose | Ecosolve (Pty) Ltd | 05/09/2013 - 22:06 | ||
Phase 1 HIA for Komati Solar PV and BESS | A PHASE 1 HERITAGE IMPACT ASSESSMENT REPORT FOR THE ESKOM KOMATI POWER STATION SOLAR ENERGY FACILILTY (SEF) MPUMALANGA PROVINCE | HIA Phase 1 | 01/06/2023 | Anton Apelser | A Pelser Archaeological Consulting | WSP Group Africa (Pty) Ltd | 05/07/2023 - 11:20 |