FindReports

THIS IS THE ARCHIVE FOR SAHRIS 1.0


THIS SITE IS NOW AN ARCHIVE AND IS NOT SUITABLE FOR MAKING APPLICATIONS

Please be aware that no content and application creation or changes to information on this version of SAHRIS will be retained.

To make applications or utilise SAHRIS for the creation of information, please use the new site:

https://sahris.org.za

Changes to SAHRIS!

The South African Heritage Resources Information System (SAHRIS) has undergone a generational upgrade and restructure. These changes to the site include, but are not limited to:

  • A new & modernised look and layout
  • Improved site usage flows with respect to applications and content creation
  • Improved site performance and stability

Launch for the new version of SAHRIS occurred on Monday the 30th of October 2023.

The new site can be found here:

SAHRIS | SAHRIS

Advanced options
ReportRef ReportTitle ReportTypesort descending ReportDate Authors AuthoringBody CommissioningCompany MapID < 2009 Post date
SASOL LIMPOPO WEST SASOL LIMPOPO WEST HERITAGE REPORT Heritage Impact Assessment Specialist Reports 01/04/2013 Thomas Huffman, Jaco van der Walt University of the Witwatersrand - Archaeological Resources Management SRK Consulting (Pty) Ltd - Pretoria 31/07/2013 - 11:24
Beaufort West Electrical Infrastructure Heritage Report Proposed Construction of a 132kV – 400kV Linking Station, two 132kV Power Lines and two onsite 132kV Substations for the Mainstream Wind Energy Facilities, near Beaufort West in the Western Cape Province Heritage Impact Assessment Specialist Reports 08/04/2016 Mary Patrick Cape Archaeological Survey CC Sivest - Gauteng 22/04/2016 - 12:43
Heritage Survey HERITAGE SURVEY OF THE UPGRADING OF THE D2286, P372, L1190, P148, L1333, L1351, D897, AND D30 Heritage Impact Assessment Specialist Reports 07/11/2022 Gavin Anderson Umlando: Archaeological Surveys & Heritage Management Umlando: Archaeological Surveys & Heritage Management 15/05/2023 - 11:16
HIA Bien Venue Three Sisters Baberton Heritage Impact Assessment for the proposed prospecting rights application and environmental authorisation for the Bien Venue 255 JU (Portion 0, 2 And 3); Three Sisters 254 JU (Remaining Extent); Three Sisters 254 JU (Remaining Extent); and Three Sisters 256 JU (Portion 1) farms near Barberton, within the city of Mbombela Local District, Mpumalanga, South Africa. Heritage Impact Assessment Specialist Reports Cherene de Bruyn NGT ESHS Solutions 29/07/2019 - 10:16
Goedetrouw, Ketting subs and 132kV lines Heritage Impact Assessment Heritage Impact Assessment Specialist Reports 31/08/2015 Anton van Vollenhoven Archaetnos CC Texture Environmental Consultants 03/11/2015 - 14:13
Heritage Impact Assessment for Portion 123, Vlakfontein 523-JR Cultural heritage impact assessment for THE PROPOSED LEWENDE WOORD DEVELOPMENT ON PORTION 123 OF PORTION 28 OF THE FARM VLAKFONTEIN 523JR, KUNGWINI LOCAL MUNICIPALITY, GAUTENG PROVINCE Heritage Impact Assessment Specialist Reports 30/11/2016 - 09:33
Heritage impact Assessment PV 2 HERITAGE IMPACT ASSESSMENT FOR THE PROPOSED SOLARRESERVE KOTULO TSATSI PHOTOVOLTAIC POWER PLANT 2 Heritage Impact Assessment Specialist Reports 31/03/2017 Jaco van der Walt Heritage Contracts and Archaeological Consulting Savannah Environmental (Pty) Ltd 03/04/2017 - 17:36
Upgrade of roads in Hlawu Hlawu (Clau Clau) Kabokweni PHASE 1 ARCHAEOLOGICAL / HERITAGE IMPACT ASSESSMENT FOR THE UPGRADING OF ROADS ON JOE SLOVO ROAD AT HLAWU-HLAWU (CLAU-CLAU) WITHIN WARD 11 OF THE CITY OF MBOMBELA LOCAL MUNICIPALITY, KABOKWENI, MPUMALANGA PROVINCE Heritage Impact Assessment Specialist Reports 27/06/2023 Christine Van Wyk Rowe Adansonia Heritage Consultants Afrika Enviro & Biology 27/06/2023 - 18:47
Middeldrift WSS CULTURAL HERITAGE IMPACT ASSESSMENT OF THE PROPOSED MIDDLEDRIFT WATER SUPPLY SCHEME NEAR NKANDLA Heritage Impact Assessment Specialist Reports Frans Prins Active Heritage CC Active Heritage CC 24/06/2019 - 14:54
Heritage Impact Assessment Heritage Impact Assessment for the Environmental Impact Assessment and Environmental Management Programme Amendment Report for the Tshipi Borwa Mine Heritage Impact Assessment Specialist Reports 25/04/2009 Wouter Fourie PGS Grave Solutions 30/08/2017 - 11:11
FORMALISATION OF LETHLABILE INFORMAL SETTLEMENT Notice of an application for environmental authorisation and heritage permit for the proposed formalisation of portion twenty-three of the Nietgedacht farm no 242JQ in the Northwest Province Heritage Impact Assessment Specialist Reports 06/05/2022 Leonie Marais-Botes Mpumalanga - Department of Agriculture, Rural Development, Land and Environmental Affairs GKM Consulting PTY LTD 06/05/2022 - 12:49
HIA For Olifantsnek School Heritage Impact Assessment for Olifantsnek School Heritage Impact Assessment Specialist Reports Prof. Anton van Vollenhoven HydroScience Archaetnos CC 20/08/2020 - 04:56
Heritage Impact Assessment Heritage Impact Assessment Heritage Impact Assessment Specialist Reports 21/06/2021 Cherene de Bruyn PGS Heritage (Pty) Ltd Savannah Environmental (Pty) Ltd 21/06/2021 - 18:54
UPGRADING OF TRANSNET SISHEN AND VLERMUISLAAGTE LOOPS PHASE 1 HIA/Archaeology Impact Assessment for the proposed Upgrading of Transnet Sishen and Vlermuislaagte Loops in the Northern Cape Province. Heritage Impact Assessment Specialist Reports 10/02/2023 Trust Mlilo Integrated Specialist Services (Pty) Ltd Integrated Specialist Services (Pty) Ltd 08/06/2023 - 21:49
Heavitree HIA HERITAGE IMPACT ASSESSMENT FOR THE PROPOSED ESTABLISHMENT OF A 1.87 MILLION M³ DAM & THE CULTIVATION OF MULTIPLE FIELDS TOTALLING APPROXIMATELY 190ha ON REM OF EXPRESS No. 15029, REM OF HEAVITREE No. 15976, FARM PORTION No. 18322 AND FARM PORTION GS No. 17935 NEAR FRERE, INKOSI LANGALIBALELE LOCAL AND uTHUKELA DISTRICT MUNICIPALITY, KWAZULU-NATAL Heritage Impact Assessment Specialist Reports 05/03/2022 Gary Trower 06/02/2023 - 14:43
Bonizenzo Holdings PRA APAC02258 A DESKTOP HERITAGE IMPACT ASSESSMENT REPORT FOR THE BONIZENZO HOLDINGS PROSPECTING RIGHTS APPLICATION ON PORTIONS 10, 21 & 24 OF ROODERAND 41JP AND THE REMAINING EXTENT OF PORTIONS 1 & 2 OF ROODERAND 902JP ZEERUST LOCAL MUNICIPALITY, NORTHWEST PROVINCE - APAC022/58 Heritage Impact Assessment Specialist Reports 23/06/2022 Anton Pelser APELSER ARCHAEOLOGICAL CONSULTING Licebo Environmental and Mining (Pty) Ltd 23/06/2022 - 12:38
Heritage walk-down for the approved Doornhoek 2 PV Facility and Associated Infrastructure, Klerksdorp, North West Province. Heritage walk-down for the approved Doornhoek 2 PV Facility and Associated Infrastructure, Klerksdorp, North West Province. Heritage Impact Assessment Specialist Reports 14/03/2023 Jaco van der Walt Beyond Heritage 13/04/2023 - 16:17
HIA for Serurubele solar PV Heritage Impact Assessment for Serurubele Solar PV Heritage Impact Assessment Specialist Reports 03/02/2020 - 15:40
Heritage Report - Slurry Cultural Heritage Assessment for the Proposed Establishment of a Solar Energy Facility and associated infrastructure, PPC Slurry, Mafikeng Local Municipality, Central District Municipality, North West Province Heritage Impact Assessment Specialist Reports 01/02/2013 Francois P Coetzee Department of Anthropology and Archaeology, UNISA Savannah Environmental (Pty) Ltd 11/11/2013 - 08:25
Heritage Impact Assessment - Final EIA Heritage Impact Assessment for the Proposed Power Lines and Substations Near Saldanha Bay, Hopefield and Vredenburg Magisterial Districts, Western Cape Heritage Impact Assessment Specialist Reports 12/09/2016 Jayson Orton ASHA Consulting(Pty) Ltd Savannah Environmental (Pty) Ltd 03/03/2017 - 09:08
KARREEBOSCH WEF PART 2 AMENDMENT HERITAGE KARREEBOSCH WEF PART 2 AMENDMENT, FINAL LAYOUT & EMPR APPROVAL - HERITAGE Heritage Impact Assessment Specialist Reports 08/08/2022 WSP CTS Heritage 23/08/2022 - 15:02
HIA Aggeneys Grid 1 HERITAGE IMPACT ASSESSMENT: PROPOSED GRID CONNECTION INFRASTRUCTURE FOR THE AGGENEYS 1 SOLAR PHOTOVOLTAIC FACILITY; NAMAKWALAND MAGISTERIAL DISTRICT, NORTHERN CAPE Heritage Impact Assessment Specialist Reports 31/03/2019 Jayson Orton ASHA Consulting(Pty) Ltd Savannah Environmental (Pty) Ltd 30/04/2019 - 12:00
HIA, proposed borrow pit at km 36.6 along DR2308, southwest of Beaufort West Heritage Impact Assessment: DR 2308 Central Karoo Beaufort West – Central Karoo District Municipality, Western Cape Heritage Impact Assessment Specialist Reports 25/04/2012 Vidamemoria Heritage Consultants Aurecon South Africa (Pty) Ltd CT_503618 16/04/2018 - 14:49
Mulilo Newcastle Wind Power Heritage Impact Assessment Mulilo Newcastle Wind Power Heritage Impact Assessment, near Newcastle, KZN for draft EIR submission Heritage Impact Assessment Specialist Reports 04/03/2023 Gavin Anderson Umlando: Archaeological Surveys and Heritage Management EOH Coastal & Environmental Services (CES) - East London 17/03/2023 - 13:37
Documentation of a number of BRIDGE AND CULVERT STRUCTURES ON THE N10 NATIONAL ROAD BETWEEN UPINGTON AND GROBLERSHOOP, NORTHERN CAPE PROVINCE Documentation of a number of BRIDGE AND CULVERT STRUCTURES ON THE N10 NATIONAL ROAD BETWEEN UPINGTON AND GROBLERSHOOP, NORTHERN CAPE PROVINCE Heritage Impact Assessment Specialist Reports 27/05/2015 Johnny Van Schalkwyk JA van Schalkwyk Heritage Consultant Chameleon Environmental 17/06/2015 - 15:53
HIA FOR THE PROPOSED KOMSBERG EAST AND WEST WIND ENERGY FACILITIES (SHARED) HERITAGE IMPACT ASSESSMENT FOR THE PROPOSED KOMSBERG EAST AND WEST WIND ENERGY FACILITIES AND GRID CONNECTIONS TO BE SITUATED IN THE WESTERN CAPE PROVINCE, ESCARPMENT AREA, MOORDENAARS KAROO, Heritage Impact Assessment Specialist Reports 15/11/2015 Timothy Hart ACO Associates CC Arcus Renewable Energy Consulting Limited 26/04/2016 - 10:08
Nkambeni cemetery Phase 1 Archaeological / HIA for proposed Nkambeni Cemetery, Portion A (portion of portion 148) of the farm Kaap Block section F Numbi, Hazyview, Mpumalanga Heritage Impact Assessment Specialist Reports 12/01/2014 Christine Van Wyk Rowe Adansonia Heritage Consultants Wandima Environmental Services cc 12/01/2014 - 11:16
Estcourt HERITAGE SURVEY OF THE PROPOSED WATER RETICULATION SCHEME ESTCOURT, KZN Heritage Impact Assessment Specialist Reports 27/11/2017 Gavin Anderson Umlando: Archaeological Surveys & Heritage Management Terratest (Pty) Ltd 10/04/2018 - 08:45
Thuli–Estancia +/-13km 132kv Option 1 amended route Archaeological and Heritage Impact Assessment (A/HIA) for Proposed Thuli–Estancia +/-13km 132kv Option 1 amended route in Chief Albert Lithuli, Steve Tshwete and Msukaligwa Local Municipalities of the Mpumalanga Province Heritage Impact Assessment Specialist Reports 16/07/2013 McEdward Murimbika Nzumbululo Heritage Solutions Nzumbululo Heritage Solutions 16/07/2013 - 12:18
Heritage Impact Assessment for MTN ACE Cable System Project HERITAGE IMPACT ASSESSMENT: PROPOSED MARINE TELECOMMUNICATIONS SYSTEM (ACE CABLE SYSTEM) TO BE LANDED AT VAN RIEBEECKSTRAND ON THE WEST COAST OF SOUTH AFRICA Heritage Impact Assessment Specialist Reports 09/01/2017 Lita Webley ACO Associates CC ACER (Africa) Environmental Management Consultants 05/04/2017 - 08:33
WITS GOLD A REPORT ON A CULTURAL HERITAGE IMPACT ASSESSMENT FOR THE PROPOSED WITS GOLD DBM PROJECT CLOSE TO VIRGINIA, FREE STATE PROVINCE Heritage Impact Assessment Specialist Reports 30/11/2011 Anton van Vollenhoven Archaetnos CC Ground Water Consulting Services 09/01/2013 - 14:31
HIA FOR THE CONSTRUCTION OF A PROPOSED PEDESTRIAN PATHWAY AND CYCLE PATH IN THE MABOPANE AREA OF GAUTENG PROVINCE CULTURAL HERITAGE RESOURCES IMPACT ASSESSMENT FOR THE CONSTRUCTION OF A PROPOSED PEDESTRIAN PATHWAY AND CYCLE PATH AT MABOPANE GAUTENG PROVINCE Heritage Impact Assessment Specialist Reports 22/05/2013 Udo Kusel African Heritage Consultants CC SPOOR Environmental Services (PTY) Ltd. 20/09/2013 - 15:55
Phase 1 Heritage Impact Assessment for industrial development on Plot 14, Ribblesdale, Bloemfontein, Free State Province. Phase 1 Heritage Impact Assessment for industrial development on Plot 14, Ribblesdale, Bloemfontein, Free State Province. Heritage Impact Assessment Specialist Reports 03/05/2018 Lloyd Rossouw Paleo Field Services Paleo Field Services 11/03/2020 - 11:24
HIA 296 Sydney Road Durban Heritage Impact Assessment for 296 Sydney Road, Erf 6227, Durban, kwazulu-Natal Heritage Impact Assessment Specialist Reports 23/01/2013 Lindsay Napier Lindsay Napier Architect Lindsay Napier Architect 18/03/2014 - 19:05
Upilanga PV2 Heritage Impact Assessment Specialist Reports Jenna Lavin CTS Heritage Savannah Environmental (Pty) Ltd 25/08/2020 - 22:13
HIA report for the proposed Olifantsfontein wetland rehabilitation CULTURAL HERITAGE IMPACT ASSESSMENT FOR THE PROPOSED OLIFANTSFONTEIN WETLAND REHABILITATION ALONG THE KAALSPRUIT, EKURHULENI METROPOLITAN MUNICIPALITY, GAUTENG PROVINCE Heritage Impact Assessment Specialist Reports 30/11/2016 J.A. van Schalkwyk 31/05/2017 - 15:03
Mngazi Heritage Impact Assessment Heritage Impact Assessment Mngazi River Bridge: SANRAL proposal for new access roads, bridge and stormwater channels Heritage Impact Assessment Specialist Reports 01/04/2014 Jenny Bennie 04/06/2014 - 10:46
Rooipunt Water Pipeline Heritage Assessment PIPELINES FOR PROPOSED ROOIPUNT SOLAR THERMAL POWER PLANT NEAR UPINGTON, ZF MGCAWU DISTRICT MUNICIPALITY, NORTHERN CAPE PROVINCE Heritage Impact Assessment Heritage Impact Assessment Specialist Reports 25/04/2016 Wouter Fourie PGS Heritage and Grave Relocation Consultants Sivest - Gauteng 22/06/2016 - 07:46
Middelburg R575 Re-alignment A PHASE I HERITAGE IMPACT ASSESSMENT (HIA) STUDY FOR THE PROPOSED DEVIATION OF ROAD 575 (P127-2) NEAR MIDDELBURG) ON THE EASTERN HIGHVELD IN THE MPUMALANGA PROVINCE Heritage Impact Assessment Specialist Reports 13/09/2013 Julius CC Pistorius 28/11/2013 - 09:37
UHIA for the proposed Gas to Power Powership project, Saldanha UNDERWATER ARCHAEOLOGICAL IMPACT ASSESSMENT FOR THE PROPOSED GAS TO POWER POWERSHIP PROJECT AT THE PORT OF SALDANHA, WESTERN CAPE, SOUTH AFRICA Heritage Impact Assessment Specialist Reports 31/03/2021 Vanessa Maitland Triplo4 Sustainable Solutions (Pty) Ltd 08/04/2021 - 10:32
Heritage Impact Assessment Heritage Impact Assessment Specialist Reports 28/10/2020 - 15:39
ARCHAEOLOGICAL IMPACT ASSESSMENT FOR THE PROPOSED ZIBULO NORTH SHAFT PROJECT, CLOSE TO OGIES, MPUMALANGA PROVINCE A REPORT ON AN ARCHAEOLOGICAL IMPACT ASSESSMENT FOR THE PROPOSED ZIBULO NORTH SHAFT EXPANSION PROJECT, CLOSE TO OGIES, MPUMALANGA PROVINCE Heritage Impact Assessment Specialist Reports 12/11/2021 Anton van Vollenhoven Archaetnos Culture & Cultural Resource Consultants 11/10/2021 - 15:34
Heritage Impact Assessment of the proposed Cement Grinding Mill A Desktop Heritage Impact Assessment (including a Phase 1 Paleontological Assessment) of the proposed Cement Grinding Mill, on Remainder of Portion 2108 of Umlazi Native Location No 4676, Umbogintwini, eThekwini Municipality Heritage Impact Assessment Specialist Reports 20/05/2021 Frans Prins Active Heritage CC Mondli Consulting 06/06/2021 - 07:20
Pofadder 1 WEF Heritage Reports PROPOSED POFADDER WIND ENERGY FACILITY 1, KENHARDT MAGISTERIAL DISTRICT, NORTHERN CAPE HERITAGE IMPACT ASSESSMENT Heritage Impact Assessment Specialist Reports 30/07/2022 Jayson Orton ASHA Consulting(Pty) Ltd SiVEST SA (Pty) Ltd 29/03/2022 - 10:28
HIA on Farm Padrooi A REPORT ON A HERITAGE IMPACT ASSESSMENT (HIA) FOR THE PROPOSED PHOTO-VOLTAIC SOLAR POWER GENERATION PLANT ON THE FARM PADROOI 13 NEAR THE AUGRABIES FALLS NATIONAL PARK IN THE NORTHERN CAPE Heritage Impact Assessment Specialist Reports 10/04/2012 Anton Pelser Aurora Power Solutions - APS Invest One EScience Associates (Pty) Ltd 02/10/2012 - 11:14
HIA, Clanwilliam intersection upgrade N7 Section 3, from km 127 to km 128 HERITAGE IMPACT ASSESSMENT PROPOSED CLANWILLIAM INTERSECTION UPGRADE ON NATIONAL ROUTE N7 SECTION 3 FROM APPROXIMATELY KM 127 TO KM 128 Heritage Impact Assessment Specialist Reports 01/11/2012 Dave Halkett ACO Associates CC CCA ENVIRONMENTAL (Pty) Ltd CTS_503706 18/04/2018 - 11:24
Heritage impact assessment for the proposed Bokamoso PV Power plant Heritage impact assessment for the PROPOSED DEVELOPMENT OF A PHOTOVOLTAIC POWER PLANT ON A PORTION OF THE FARM MATJESSPRUIT 145HP, LEEUDORINGSTAD REGION, NORTH WEST PROVINCE Heritage Impact Assessment Specialist Reports 02/09/2013 Johnny Van Schalkwyk Johnny Van Schalkwyk National Cultural History Museum 17/02/2014 - 12:22
HIA Hoekplaas Heritage Impact Assessment for Multiple Proposed Solar Energy Facilities on Farm Hoekplaas 146, Copperton, Northern Cape. Heritage Impact Assessment Specialist Reports 09/07/2013 Jayson Orton ACO Associates CC Aurecon - Cape Town 24/03/2015 - 10:51
GOL2376 WRTRP HIA Environmental Impact Assessment for Sibanye Gold Limited's West Rand Tailings Retreatment Project - Heritage Impact Assessment Heritage Impact Assessment Specialist Reports 13/01/2016 Justin du Piesanie, Johan Nel Digby Wells Environmental Sibanye Gold Limited 01/02/2016 - 08:41
Heritage Impact Assessment A Report on a Heritage Impact Assessment for a Proposed Solar Plant and Infrastructure on the Farm Kipling, Black Rock Mining Operations, Close to Hotazel, Northern Cape Province Heritage Impact Assessment Specialist Reports 21/11/2022 Anton van Vollenhoven Archaetnos CC EScience Associates (Pty) Ltd 02/03/2023 - 07:13

Pages

CSV
 
 