THIS IS THE ARCHIVE FOR SAHRIS 1.0
THIS SITE IS NOW AN ARCHIVE AND IS NOT SUITABLE FOR MAKING APPLICATIONS
Please be aware that no content and application creation or changes to information on this version of SAHRIS will be retained.
To make applications or utilise SAHRIS for the creation of information, please use the new site:
https://sahris.org.za
Changes to SAHRIS!
The South African Heritage Resources Information System (SAHRIS) has undergone a generational upgrade and restructure. These changes to the site include, but are not limited to:
- A new & modernised look and layout
- Improved site usage flows with respect to applications and content creation
- Improved site performance and stability
Launch for the new version of SAHRIS occurred on Monday the 30th of October 2023.
The new site can be found here:
SAHRIS | SAHRIS
Displaying 17401 - 17450 of 18975
ReportRef | ReportTitle | ReportType | ReportDate | Authors | AuthoringBody | CommissioningCompany | MapID < 2009 | Post date |
---|---|---|---|---|---|---|---|---|
SASOL LIMPOPO WEST | SASOL LIMPOPO WEST HERITAGE REPORT | Heritage Impact Assessment Specialist Reports | 01/04/2013 | Thomas Huffman, Jaco van der Walt | University of the Witwatersrand - Archaeological Resources Management | SRK Consulting (Pty) Ltd - Pretoria | 31/07/2013 - 11:24 | |
Beaufort West Electrical Infrastructure Heritage Report | Proposed Construction of a 132kV – 400kV Linking Station, two 132kV Power Lines and two onsite 132kV Substations for the Mainstream Wind Energy Facilities, near Beaufort West in the Western Cape Province | Heritage Impact Assessment Specialist Reports | 08/04/2016 | Mary Patrick | Cape Archaeological Survey CC | Sivest - Gauteng | 22/04/2016 - 12:43 | |
Heritage Survey | HERITAGE SURVEY OF THE UPGRADING OF THE D2286, P372, L1190, P148, L1333, L1351, D897, AND D30 | Heritage Impact Assessment Specialist Reports | 07/11/2022 | Gavin Anderson | Umlando: Archaeological Surveys & Heritage Management | Umlando: Archaeological Surveys & Heritage Management | 15/05/2023 - 11:16 | |
HIA Bien Venue Three Sisters Baberton | Heritage Impact Assessment for the proposed prospecting rights application and environmental authorisation for the Bien Venue 255 JU (Portion 0, 2 And 3); Three Sisters 254 JU (Remaining Extent); Three Sisters 254 JU (Remaining Extent); and Three Sisters 256 JU (Portion 1) farms near Barberton, within the city of Mbombela Local District, Mpumalanga, South Africa. | Heritage Impact Assessment Specialist Reports | Cherene de Bruyn | NGT ESHS Solutions | 29/07/2019 - 10:16 | |||
Goedetrouw, Ketting subs and 132kV lines Heritage Impact Assessment | Heritage Impact Assessment Specialist Reports | 31/08/2015 | Anton van Vollenhoven | Archaetnos CC | Texture Environmental Consultants | 03/11/2015 - 14:13 | ||
Heritage Impact Assessment for Portion 123, Vlakfontein 523-JR | Cultural heritage impact assessment for THE PROPOSED LEWENDE WOORD DEVELOPMENT ON PORTION 123 OF PORTION 28 OF THE FARM VLAKFONTEIN 523JR, KUNGWINI LOCAL MUNICIPALITY, GAUTENG PROVINCE | Heritage Impact Assessment Specialist Reports | 30/11/2016 - 09:33 | |||||
Heritage impact Assessment PV 2 | HERITAGE IMPACT ASSESSMENT FOR THE PROPOSED SOLARRESERVE KOTULO TSATSI PHOTOVOLTAIC POWER PLANT 2 | Heritage Impact Assessment Specialist Reports | 31/03/2017 | Jaco van der Walt | Heritage Contracts and Archaeological Consulting | Savannah Environmental (Pty) Ltd | 03/04/2017 - 17:36 | |
Upgrade of roads in Hlawu Hlawu (Clau Clau) Kabokweni | PHASE 1 ARCHAEOLOGICAL / HERITAGE IMPACT ASSESSMENT FOR THE UPGRADING OF ROADS ON JOE SLOVO ROAD AT HLAWU-HLAWU (CLAU-CLAU) WITHIN WARD 11 OF THE CITY OF MBOMBELA LOCAL MUNICIPALITY, KABOKWENI, MPUMALANGA PROVINCE | Heritage Impact Assessment Specialist Reports | 27/06/2023 | Christine Van Wyk Rowe | Adansonia Heritage Consultants | Afrika Enviro & Biology | 27/06/2023 - 18:47 | |
Middeldrift WSS | CULTURAL HERITAGE IMPACT ASSESSMENT OF THE PROPOSED MIDDLEDRIFT WATER SUPPLY SCHEME NEAR NKANDLA | Heritage Impact Assessment Specialist Reports | Frans Prins | Active Heritage CC | Active Heritage CC | 24/06/2019 - 14:54 | ||
Heritage Impact Assessment | Heritage Impact Assessment for the Environmental Impact Assessment and Environmental Management Programme Amendment Report for the Tshipi Borwa Mine | Heritage Impact Assessment Specialist Reports | 25/04/2009 | Wouter Fourie | PGS Grave Solutions | 30/08/2017 - 11:11 | ||
FORMALISATION OF LETHLABILE INFORMAL SETTLEMENT | Notice of an application for environmental authorisation and heritage permit for the proposed formalisation of portion twenty-three of the Nietgedacht farm no 242JQ in the Northwest Province | Heritage Impact Assessment Specialist Reports | 06/05/2022 | Leonie Marais-Botes | Mpumalanga - Department of Agriculture, Rural Development, Land and Environmental Affairs | GKM Consulting PTY LTD | 06/05/2022 - 12:49 | |
HIA For Olifantsnek School | Heritage Impact Assessment for Olifantsnek School | Heritage Impact Assessment Specialist Reports | Prof. Anton van Vollenhoven | HydroScience | Archaetnos CC | 20/08/2020 - 04:56 | ||
Heritage Impact Assessment | Heritage Impact Assessment | Heritage Impact Assessment Specialist Reports | 21/06/2021 | Cherene de Bruyn | PGS Heritage (Pty) Ltd | Savannah Environmental (Pty) Ltd | 21/06/2021 - 18:54 | |
UPGRADING OF TRANSNET SISHEN AND VLERMUISLAAGTE LOOPS | PHASE 1 HIA/Archaeology Impact Assessment for the proposed Upgrading of Transnet Sishen and Vlermuislaagte Loops in the Northern Cape Province. | Heritage Impact Assessment Specialist Reports | 10/02/2023 | Trust Mlilo | Integrated Specialist Services (Pty) Ltd | Integrated Specialist Services (Pty) Ltd | 08/06/2023 - 21:49 | |
Heavitree HIA | HERITAGE IMPACT ASSESSMENT FOR THE PROPOSED ESTABLISHMENT OF A 1.87 MILLION M³ DAM & THE CULTIVATION OF MULTIPLE FIELDS TOTALLING APPROXIMATELY 190ha ON REM OF EXPRESS No. 15029, REM OF HEAVITREE No. 15976, FARM PORTION No. 18322 AND FARM PORTION GS No. 17935 NEAR FRERE, INKOSI LANGALIBALELE LOCAL AND uTHUKELA DISTRICT MUNICIPALITY, KWAZULU-NATAL | Heritage Impact Assessment Specialist Reports | 05/03/2022 | Gary Trower | 06/02/2023 - 14:43 | |||
Bonizenzo Holdings PRA APAC02258 | A DESKTOP HERITAGE IMPACT ASSESSMENT REPORT FOR THE BONIZENZO HOLDINGS PROSPECTING RIGHTS APPLICATION ON PORTIONS 10, 21 & 24 OF ROODERAND 41JP AND THE REMAINING EXTENT OF PORTIONS 1 & 2 OF ROODERAND 902JP ZEERUST LOCAL MUNICIPALITY, NORTHWEST PROVINCE - APAC022/58 | Heritage Impact Assessment Specialist Reports | 23/06/2022 | Anton Pelser | APELSER ARCHAEOLOGICAL CONSULTING | Licebo Environmental and Mining (Pty) Ltd | 23/06/2022 - 12:38 | |
Heritage walk-down for the approved Doornhoek 2 PV Facility and Associated Infrastructure, Klerksdorp, North West Province. | Heritage walk-down for the approved Doornhoek 2 PV Facility and Associated Infrastructure, Klerksdorp, North West Province. | Heritage Impact Assessment Specialist Reports | 14/03/2023 | Jaco van der Walt | Beyond Heritage | 13/04/2023 - 16:17 | ||
HIA for Serurubele solar PV | Heritage Impact Assessment for Serurubele Solar PV | Heritage Impact Assessment Specialist Reports | 03/02/2020 - 15:40 | |||||
Heritage Report - Slurry | Cultural Heritage Assessment for the Proposed Establishment of a Solar Energy Facility and associated infrastructure, PPC Slurry, Mafikeng Local Municipality, Central District Municipality, North West Province | Heritage Impact Assessment Specialist Reports | 01/02/2013 | Francois P Coetzee | Department of Anthropology and Archaeology, UNISA | Savannah Environmental (Pty) Ltd | 11/11/2013 - 08:25 | |
Heritage Impact Assessment - Final EIA | Heritage Impact Assessment for the Proposed Power Lines and Substations Near Saldanha Bay, Hopefield and Vredenburg Magisterial Districts, Western Cape | Heritage Impact Assessment Specialist Reports | 12/09/2016 | Jayson Orton | ASHA Consulting(Pty) Ltd | Savannah Environmental (Pty) Ltd | 03/03/2017 - 09:08 | |
KARREEBOSCH WEF PART 2 AMENDMENT HERITAGE | KARREEBOSCH WEF PART 2 AMENDMENT, FINAL LAYOUT & EMPR APPROVAL - HERITAGE | Heritage Impact Assessment Specialist Reports | 08/08/2022 | WSP | CTS Heritage | 23/08/2022 - 15:02 | ||
HIA Aggeneys Grid 1 | HERITAGE IMPACT ASSESSMENT: PROPOSED GRID CONNECTION INFRASTRUCTURE FOR THE AGGENEYS 1 SOLAR PHOTOVOLTAIC FACILITY; NAMAKWALAND MAGISTERIAL DISTRICT, NORTHERN CAPE | Heritage Impact Assessment Specialist Reports | 31/03/2019 | Jayson Orton | ASHA Consulting(Pty) Ltd | Savannah Environmental (Pty) Ltd | 30/04/2019 - 12:00 | |
HIA, proposed borrow pit at km 36.6 along DR2308, southwest of Beaufort West | Heritage Impact Assessment: DR 2308 Central Karoo Beaufort West – Central Karoo District Municipality, Western Cape | Heritage Impact Assessment Specialist Reports | 25/04/2012 | Vidamemoria Heritage Consultants | Aurecon South Africa (Pty) Ltd | CT_503618 | 16/04/2018 - 14:49 | |
Mulilo Newcastle Wind Power Heritage Impact Assessment | Mulilo Newcastle Wind Power Heritage Impact Assessment, near Newcastle, KZN for draft EIR submission | Heritage Impact Assessment Specialist Reports | 04/03/2023 | Gavin Anderson | Umlando: Archaeological Surveys and Heritage Management | EOH Coastal & Environmental Services (CES) - East London | 17/03/2023 - 13:37 | |
Documentation of a number of BRIDGE AND CULVERT STRUCTURES ON THE N10 NATIONAL ROAD BETWEEN UPINGTON AND GROBLERSHOOP, NORTHERN CAPE PROVINCE | Documentation of a number of BRIDGE AND CULVERT STRUCTURES ON THE N10 NATIONAL ROAD BETWEEN UPINGTON AND GROBLERSHOOP, NORTHERN CAPE PROVINCE | Heritage Impact Assessment Specialist Reports | 27/05/2015 | Johnny Van Schalkwyk | JA van Schalkwyk Heritage Consultant | Chameleon Environmental | 17/06/2015 - 15:53 | |
HIA FOR THE PROPOSED KOMSBERG EAST AND WEST WIND ENERGY FACILITIES (SHARED) | HERITAGE IMPACT ASSESSMENT FOR THE PROPOSED KOMSBERG EAST AND WEST WIND ENERGY FACILITIES AND GRID CONNECTIONS TO BE SITUATED IN THE WESTERN CAPE PROVINCE, ESCARPMENT AREA, MOORDENAARS KAROO, | Heritage Impact Assessment Specialist Reports | 15/11/2015 | Timothy Hart | ACO Associates CC | Arcus Renewable Energy Consulting Limited | 26/04/2016 - 10:08 | |
Nkambeni cemetery | Phase 1 Archaeological / HIA for proposed Nkambeni Cemetery, Portion A (portion of portion 148) of the farm Kaap Block section F Numbi, Hazyview, Mpumalanga | Heritage Impact Assessment Specialist Reports | 12/01/2014 | Christine Van Wyk Rowe | Adansonia Heritage Consultants | Wandima Environmental Services cc | 12/01/2014 - 11:16 | |
Estcourt | HERITAGE SURVEY OF THE PROPOSED WATER RETICULATION SCHEME ESTCOURT, KZN | Heritage Impact Assessment Specialist Reports | 27/11/2017 | Gavin Anderson | Umlando: Archaeological Surveys & Heritage Management | Terratest (Pty) Ltd | 10/04/2018 - 08:45 | |
Thuli–Estancia +/-13km 132kv Option 1 amended route | Archaeological and Heritage Impact Assessment (A/HIA) for Proposed Thuli–Estancia +/-13km 132kv Option 1 amended route in Chief Albert Lithuli, Steve Tshwete and Msukaligwa Local Municipalities of the Mpumalanga Province | Heritage Impact Assessment Specialist Reports | 16/07/2013 | McEdward Murimbika | Nzumbululo Heritage Solutions | Nzumbululo Heritage Solutions | 16/07/2013 - 12:18 | |
Heritage Impact Assessment for MTN ACE Cable System Project | HERITAGE IMPACT ASSESSMENT: PROPOSED MARINE TELECOMMUNICATIONS SYSTEM (ACE CABLE SYSTEM) TO BE LANDED AT VAN RIEBEECKSTRAND ON THE WEST COAST OF SOUTH AFRICA | Heritage Impact Assessment Specialist Reports | 09/01/2017 | Lita Webley | ACO Associates CC | ACER (Africa) Environmental Management Consultants | 05/04/2017 - 08:33 | |
WITS GOLD | A REPORT ON A CULTURAL HERITAGE IMPACT ASSESSMENT FOR THE PROPOSED WITS GOLD DBM PROJECT CLOSE TO VIRGINIA, FREE STATE PROVINCE | Heritage Impact Assessment Specialist Reports | 30/11/2011 | Anton van Vollenhoven | Archaetnos CC | Ground Water Consulting Services | 09/01/2013 - 14:31 | |
HIA FOR THE CONSTRUCTION OF A PROPOSED PEDESTRIAN PATHWAY AND CYCLE PATH IN THE MABOPANE AREA OF GAUTENG PROVINCE | CULTURAL HERITAGE RESOURCES IMPACT ASSESSMENT FOR THE CONSTRUCTION OF A PROPOSED PEDESTRIAN PATHWAY AND CYCLE PATH AT MABOPANE GAUTENG PROVINCE | Heritage Impact Assessment Specialist Reports | 22/05/2013 | Udo Kusel | African Heritage Consultants CC | SPOOR Environmental Services (PTY) Ltd. | 20/09/2013 - 15:55 | |
Phase 1 Heritage Impact Assessment for industrial development on Plot 14, Ribblesdale, Bloemfontein, Free State Province. | Phase 1 Heritage Impact Assessment for industrial development on Plot 14, Ribblesdale, Bloemfontein, Free State Province. | Heritage Impact Assessment Specialist Reports | 03/05/2018 | Lloyd Rossouw | Paleo Field Services | Paleo Field Services | 11/03/2020 - 11:24 | |
HIA 296 Sydney Road Durban | Heritage Impact Assessment for 296 Sydney Road, Erf 6227, Durban, kwazulu-Natal | Heritage Impact Assessment Specialist Reports | 23/01/2013 | Lindsay Napier | Lindsay Napier Architect | Lindsay Napier Architect | 18/03/2014 - 19:05 | |
Upilanga PV2 | Heritage Impact Assessment Specialist Reports | Jenna Lavin | CTS Heritage | Savannah Environmental (Pty) Ltd | 25/08/2020 - 22:13 | |||
HIA report for the proposed Olifantsfontein wetland rehabilitation | CULTURAL HERITAGE IMPACT ASSESSMENT FOR THE PROPOSED OLIFANTSFONTEIN WETLAND REHABILITATION ALONG THE KAALSPRUIT, EKURHULENI METROPOLITAN MUNICIPALITY, GAUTENG PROVINCE | Heritage Impact Assessment Specialist Reports | 30/11/2016 | J.A. van Schalkwyk | 31/05/2017 - 15:03 | |||
Mngazi Heritage Impact Assessment | Heritage Impact Assessment Mngazi River Bridge: SANRAL proposal for new access roads, bridge and stormwater channels | Heritage Impact Assessment Specialist Reports | 01/04/2014 | Jenny Bennie | 04/06/2014 - 10:46 | |||
Rooipunt Water Pipeline Heritage Assessment | PIPELINES FOR PROPOSED ROOIPUNT SOLAR THERMAL POWER PLANT NEAR UPINGTON, ZF MGCAWU DISTRICT MUNICIPALITY, NORTHERN CAPE PROVINCE Heritage Impact Assessment | Heritage Impact Assessment Specialist Reports | 25/04/2016 | Wouter Fourie | PGS Heritage and Grave Relocation Consultants | Sivest - Gauteng | 22/06/2016 - 07:46 | |
Middelburg R575 Re-alignment | A PHASE I HERITAGE IMPACT ASSESSMENT (HIA) STUDY FOR THE PROPOSED DEVIATION OF ROAD 575 (P127-2) NEAR MIDDELBURG) ON THE EASTERN HIGHVELD IN THE MPUMALANGA PROVINCE | Heritage Impact Assessment Specialist Reports | 13/09/2013 | Julius CC Pistorius | 28/11/2013 - 09:37 | |||
UHIA for the proposed Gas to Power Powership project, Saldanha | UNDERWATER ARCHAEOLOGICAL IMPACT ASSESSMENT FOR THE PROPOSED GAS TO POWER POWERSHIP PROJECT AT THE PORT OF SALDANHA, WESTERN CAPE, SOUTH AFRICA | Heritage Impact Assessment Specialist Reports | 31/03/2021 | Vanessa Maitland | Triplo4 Sustainable Solutions (Pty) Ltd | 08/04/2021 - 10:32 | ||
Heritage Impact Assessment | Heritage Impact Assessment Specialist Reports | 28/10/2020 - 15:39 | ||||||
ARCHAEOLOGICAL IMPACT ASSESSMENT FOR THE PROPOSED ZIBULO NORTH SHAFT PROJECT, CLOSE TO OGIES, MPUMALANGA PROVINCE | A REPORT ON AN ARCHAEOLOGICAL IMPACT ASSESSMENT FOR THE PROPOSED ZIBULO NORTH SHAFT EXPANSION PROJECT, CLOSE TO OGIES, MPUMALANGA PROVINCE | Heritage Impact Assessment Specialist Reports | 12/11/2021 | Anton van Vollenhoven | Archaetnos Culture & Cultural Resource Consultants | 11/10/2021 - 15:34 | ||
Heritage Impact Assessment of the proposed Cement Grinding Mill | A Desktop Heritage Impact Assessment (including a Phase 1 Paleontological Assessment) of the proposed Cement Grinding Mill, on Remainder of Portion 2108 of Umlazi Native Location No 4676, Umbogintwini, eThekwini Municipality | Heritage Impact Assessment Specialist Reports | 20/05/2021 | Frans Prins | Active Heritage CC | Mondli Consulting | 06/06/2021 - 07:20 | |
Pofadder 1 WEF Heritage Reports | PROPOSED POFADDER WIND ENERGY FACILITY 1, KENHARDT MAGISTERIAL DISTRICT, NORTHERN CAPE HERITAGE IMPACT ASSESSMENT | Heritage Impact Assessment Specialist Reports | 30/07/2022 | Jayson Orton | ASHA Consulting(Pty) Ltd | SiVEST SA (Pty) Ltd | 29/03/2022 - 10:28 | |
HIA on Farm Padrooi | A REPORT ON A HERITAGE IMPACT ASSESSMENT (HIA) FOR THE PROPOSED PHOTO-VOLTAIC SOLAR POWER GENERATION PLANT ON THE FARM PADROOI 13 NEAR THE AUGRABIES FALLS NATIONAL PARK IN THE NORTHERN CAPE | Heritage Impact Assessment Specialist Reports | 10/04/2012 | Anton Pelser | Aurora Power Solutions - APS Invest One | EScience Associates (Pty) Ltd | 02/10/2012 - 11:14 | |
HIA, Clanwilliam intersection upgrade N7 Section 3, from km 127 to km 128 | HERITAGE IMPACT ASSESSMENT PROPOSED CLANWILLIAM INTERSECTION UPGRADE ON NATIONAL ROUTE N7 SECTION 3 FROM APPROXIMATELY KM 127 TO KM 128 | Heritage Impact Assessment Specialist Reports | 01/11/2012 | Dave Halkett | ACO Associates CC | CCA ENVIRONMENTAL (Pty) Ltd | CTS_503706 | 18/04/2018 - 11:24 |
Heritage impact assessment for the proposed Bokamoso PV Power plant | Heritage impact assessment for the PROPOSED DEVELOPMENT OF A PHOTOVOLTAIC POWER PLANT ON A PORTION OF THE FARM MATJESSPRUIT 145HP, LEEUDORINGSTAD REGION, NORTH WEST PROVINCE | Heritage Impact Assessment Specialist Reports | 02/09/2013 | Johnny Van Schalkwyk | Johnny Van Schalkwyk | National Cultural History Museum | 17/02/2014 - 12:22 | |
HIA Hoekplaas | Heritage Impact Assessment for Multiple Proposed Solar Energy Facilities on Farm Hoekplaas 146, Copperton, Northern Cape. | Heritage Impact Assessment Specialist Reports | 09/07/2013 | Jayson Orton | ACO Associates CC | Aurecon - Cape Town | 24/03/2015 - 10:51 | |
GOL2376 WRTRP HIA | Environmental Impact Assessment for Sibanye Gold Limited's West Rand Tailings Retreatment Project - Heritage Impact Assessment | Heritage Impact Assessment Specialist Reports | 13/01/2016 | Justin du Piesanie, Johan Nel | Digby Wells Environmental | Sibanye Gold Limited | 01/02/2016 - 08:41 | |
Heritage Impact Assessment | A Report on a Heritage Impact Assessment for a Proposed Solar Plant and Infrastructure on the Farm Kipling, Black Rock Mining Operations, Close to Hotazel, Northern Cape Province | Heritage Impact Assessment Specialist Reports | 21/11/2022 | Anton van Vollenhoven | Archaetnos CC | EScience Associates (Pty) Ltd | 02/03/2023 - 07:13 |