THIS IS THE ARCHIVE FOR SAHRIS 1.0
THIS SITE IS NOW AN ARCHIVE AND IS NOT SUITABLE FOR MAKING APPLICATIONS
Please be aware that no content and application creation or changes to information on this version of SAHRIS will be retained.
To make applications or utilise SAHRIS for the creation of information, please use the new site:
https://sahris.org.za
Changes to SAHRIS!
The South African Heritage Resources Information System (SAHRIS) has undergone a generational upgrade and restructure. These changes to the site include, but are not limited to:
- A new & modernised look and layout
- Improved site usage flows with respect to applications and content creation
- Improved site performance and stability
Launch for the new version of SAHRIS occurred on Monday the 30th of October 2023.
The new site can be found here:
SAHRIS | SAHRIS
Displaying 17401 - 17450 of 18975
ReportRef | ReportTitle | ReportType | ReportDate | Authors | AuthoringBody | CommissioningCompany | MapID < 2009 | Post date |
---|---|---|---|---|---|---|---|---|
AIA: Bestwood JvS 2010 | Archaeological impact survey report for THE PROPOSED DEVELOPMENT OF A SOLAR POWER PLANT ON THE FARM BESTWOOD 459, KATHU REGION, NORTHERN CAPE PROVINCE | AIA Phase 1 | Johnny Van Schalkwyk | Cultmatrix Pty Ltd | 14/03/2014 - 14:28 | |||
AIA_St_Francis_Golf_Estate_Phase_1_Nilssen_PJ_Aug03 | Proposed St Francis Golf Estate (Heritage Impact Assessment Phase 1) Final Report | AIA Phase 1 | 06/08/2003 | Peter Nilssen | Mossel Bay Archaeology Project | MAPID_01898 | 16/06/2012 - 14:50 | |
9-2-204-0004-20070603-AHM | Final Consolidated Report Heritage Impact Assessment: Proposed Development of High-Cost Housing and Filling Station Portion 9 of the Farm Mooiplaats 147 JT | AIA Phase 1 | 03/06/2007 | Johan Nel | University of Pretoria - Archaic Heritage Project Management | MAPID_01728 | 16/06/2012 - 14:38 | |
Site Management Plan for Noka Shelter, Lapalala Wilderness | Management Plan: Noka rock art site, Noka Camp, Lapalala Wilderness, Lephalale Lcal Municipality, Waterberg District Municipality, Limpopo Province, South Africa | Archaeological Specialist Reports | 18/04/2023 | Jeremy Hollmann | 18/04/2023 - 12:03 | |||
Spes Bona HIA | FIRST PHASE ARCHAEOLOGICAL & HERITAGE ASSESSMENT OF THE PROPOSED SOLAR FARM DEVELOPMENTS AT SPES BONA 2355, BLOEMFONTEIN | Archaeological Specialist Reports | Cobus Dreyer | Scatec Solar SA (Pty) Ltd | 06/05/2014 - 16:23 | |||
Export of four OSL samples from Sibudu | The 2018 Excavations of the University of Tübingen in the Stone Age deposits of Sibudu and Umbeli Belli Rockshelter, KwaZulu-Natal | Archaeological Specialist Reports | 08/03/2018 | 21/03/2019 - 13:05 | ||||
ARCHAEOLOGICAL IMPACT ASSESSMENT THE PROPOSED UPGRADING OF THE KWV UPINGTON EFFLUENT MANAGEMENT FACILITY | ARCHAEOLOGICAL IMPACT ASSESSMENT THE PROPOSED UPGRADING OF THE KWV UPINGTON EFFLUENT MANAGEMENT FACILITY NORTHERN CAPE PROVINCE | Archaeological Specialist Reports | 01/02/2013 | Jonathan Kaplan | Agency for Cultural Resources Management | Enviroafrica CC | 06/09/2013 - 15:53 | |
Roodekrans HIA | A REPORT ON A CULTURAL HERITAGE IMPACT ASSESSMENT DONE FOR THE PROPOSED ROODEKRANZ DEVELOPMENT, MOGALE CITY, GAUTENG PROVINCE | Archaeological Specialist Reports | 08/07/2016 | Anton van Vollenhoven | A.C. van Vollenhoven | EON Consulting | 25/11/2016 - 16:30 | |
Heritage and Paleo Scoping for Hotazel Solar Park | SCOPING HERITAGE IMPACT ASSESSMENT FOR THE PROPOSED HOTAZEL SOLAR FARM, KURUMAN MAGISTERIAL DISTRICT, NORTHERN CAPE | Archaeological Specialist Reports | 19/10/2016 | John Almond, Jayson Orton | ASHA Consulting(Pty) Ltd, Natura Viva CC | Aurecon South Africa (Pty) Ltd | 03/11/2016 - 15:26 | |
Archaeological Report for Khobab Power Line & Substation | Power Line Route Options, Access Road and Substation Positions for the Khobab WEF | Archaeological Specialist Reports | 31/01/2013 | David Morris | McGregor Museum | 04/03/2013 - 09:44 | ||
Archaeological and Heritage Impact Assessment Report | Archaeological and Heritage Impact Assessment Report for proposed construction of Siyathemba 20MVA 88/22kV Substation and associated infrastructure within the jurisdiction of Dipaleseng Local Municipality in the Mpumalanga Province | Archaeological Specialist Reports | 11/05/2018 | M Mabuda | Nsovo Environmental Consulting | Mulaifa Development Projects cc | 29/10/2018 - 15:09 | |
Investigation report of exposed human skeletal material for Blaauwbosch Kopia Diamonds | INVESTIGATION REPORT OF EXPOSED HUMAN SKELETAL MATERIAL DURING MINING OPERATIONS AT BLAAUWBOSCH (KOPHIA) DIAMOND MINE, BOSHOF DISTRICT, FREE STATE PROVINCE | Archaeological Specialist Reports | 14/06/2019 | Loudine Philip | National Museum: Department of Archaeology | 14/05/2019 - 11:10 | ||
AIA - Ilanga CSP 5 - Jun16 | AIA for the proposed Ilanga CSP 5 | Archaeological Specialist Reports | 20/06/2016 | Jaco van der Walt | Heritage Contracts and Archaeological Consulting | Savannah Environmental (Pty) Ltd | 27/06/2016 - 11:39 | |
Heritage Assessment - langa CSP3 | Archaeological Impact Assessment Report for the Ilanga CSP 3 Project, near Upington, Northern Cape Province | Archaeological Specialist Reports | 12/04/2016 | Jaco van der Walt | Heritage Contracts and Archaeological Consulting | Savannah Environmental (Pty) Ltd | 18/05/2016 - 11:49 | |
Portion 4, Farm Zuurwater No 62 Archaeological Specialist Study | Proposed development of a new haul road at Black Mountain Mine, near Aggeneys in the Northern Cape Province | Archaeological Specialist Reports | 18/02/2019 | Cedar Tower Services | Cedar Tower Services | 22/02/2019 - 13:21 | ||
Alldays Solar farm | Proposed Venetia Photovoltaic (PV)/Concentrated Photovoltaic (CPV) Solar Energy facilityon Gotha Farm, Phase 1 (up to 100MW), near Alldays in the Limpopo Province | Archaeological Specialist Reports | 29/04/2012 | Stephan Gaigher | Gaigher & Associates | Savannah Environmental (Pty) Ltd | 11/09/2012 - 16:24 | |
Kemo Dump CMP | Conservation Management Plan for the Kemo Dump | Archaeological Specialist Reports | 14/06/2023 | Abenicia Henderson | SAHRA HOU | McGregor Museum | 27/04/2023 - 13:28 | |
Arch-NxubaWindFarm | AN ARCHAEOLOGICAL WALKTHROUGH SURVEY OF THE FINAL OPTIMISED LAYOUT OF THE AUTHORISED NXUBA WIND FARM NEAR COOKHOUSE, BLUE CRANE ROUTE LOCAL MUNICIPALITY, SARAH BAARTMAN DISTRICT MUNICIPALITY, EASTERN CAPE PROVINCE. | Archaeological Specialist Reports | 20/07/2015 | Johan Binneman | Eastern Cape Heritage Consultants | Savannah Environmental (Pty) Ltd | 30/11/2015 - 13:00 | |
DCA_Pre-Application_BAR_App_D4_HIA_Palaeontology | EXPANSION OF DIAMOND COAST AQUACULTURE FARM PORTION 1 OF FARM KLEINZEE 654, KLEINZEE, NORTHERN CAPE, Nama Khoi Municipality, Namakwaland Magisterial District | Archaeological Specialist Reports | 31/05/2018 | John Pether | Geological and Palaeontological Consultant | Agency for Cultural Resources Management | 16/05/2018 - 13:07 | |
Archaeological Walk-Through (Karusa) | An Archaeological Walk-Through For The Proposed Karusa Wind Energy Facility Situated On The Farms: De Hoop 202, Standvastigheid 210, Portion 1 Of The Farm Rheebokke Fontein 209, Portion 2 Of The Farm Rheebokke Fontein 209, Portion 3 Of The Farm Rheebokke Fontein 209 And The Remainder Of The Farm Rheebokke Fontein 209, Near Sutherland, Karoo Hoogland Local Municipality, Namakwa District Municipality, Northern Cape Province. | Archaeological Specialist Reports | 12/10/2015 | Celeste Booth | Booth Heritage Consulting | Savannah Environmental (Pty) Ltd | 17/12/2015 - 09:03 | |
HERITAGE SURVEY OF THE DR08017 FROM MT. FRERE TO CEDARVILLE, EASTERN CAPE. | Archaeological Specialist Reports | 30/03/2013 | Gavin Anderson | Umlando: Archaeological Surveys & Heritage Management | Eastern Cape - Department of Roads and Public Works | 12/04/2013 - 12:17 | ||
PHASE I ARCHAEOLOGICAL AND CULTURAL HERITAGE IMPACT ASSESSMENT SPECIALIST REPORT FOR THE PROPOSED CONSTRUCTION OF APPROXIMATELY 170KM 1 X 400KV POWERLINE FROM MAPHUTHA SUBSTATION TO WITKOP SUBSTATION | PHASE I ARCHAEOLOGICAL AND CULTURAL HERITAGE IMPACT ASSESSMENT SPECIALIST REPORT FOR THE PROPOSED CONSTRUCTION OF APPROXIMATELY 170KM 1 X 400KV POWERLINE FROM MAPHUTHA SUBSTATION TO WITKOP SUBSTATION WITHIN THE SEKHUKHUNE AND CAPRICON DISTRICT MUNICIPALITIES OF LIMPOPO PROVINCE | Archaeological Specialist Reports | Nsovo Environmental Consulting | Vhubvo Archaeo-Heritage Consultants | 17/09/2018 - 13:40 | |||
Bulk Sewer infrastructure at Ridgeview extensions, Vlakfontein, Balfour | Recommendation for an exemption from a phase 1 AIA and Heritage Investigation on portion 28 of the farm Vlakfontein 556IR, Balfour, Mpumalanga Province for the proposed bulk sewer infrastructure at Ridgeview extensions | Archaeological Specialist Reports | 19/06/2018 | Christine Van Wyk Rowe | Adansonia Heritage Consultants | Afrika Enviro & Biology | 19/06/2018 - 13:03 | |
AIA Wrenchville | Archaeological Impact Assessment Wrenchville Phase 2 Low Cost Housing Development, RE Erf 1, Kuruman, Northern Cape. | Archaeological Specialist Reports | 08/10/2019 | Jonathan Kaplan | 16/10/2019 - 10:00 | |||
Archaeological Impact Assessment for Thaba Mine | Archaeological Impact Assessment for the proposed additional underground and opencast mining, associated infrastructure and processing facilities at Thaba Cronimet Chrome Mine, Limpopo Province. | Archaeological Specialist Reports | 26/02/2016 | Jaco van der Walt | Heritage Contracts and Archaeological Consulting | Worley Parsons RSA (Pty) Ltd | 07/09/2023 - 13:54 | |
Preliminary Archaeological Survey of Karoopoort Farm | Preliminary Archaeological Survey of Karoopoort Farm | Archaeological Specialist Reports | 24/10/2011 | Hugo Pinto, Katie Smuts | Cape Tanqua Tourism Services | CTS_375379 | 10/11/2016 - 11:47 | |
ESR dating Olieboomspoort | Report to SAHRA on ESR and U-series dating at Olieboomspoort (Limpopo Province, South Africa) using two fossil equid teeth | Archaeological Specialist Reports | 15/02/2021 | Aurore Val | 14/12/2022 - 13:42 | |||
Heritage Phase 1 - Astral Organic Composting Facility | Astral Operations - Bronkhorstspruit - Phase 1 Heritage | Archaeological Specialist Reports | 01/03/2021 | 28/05/2021 - 10:13 | ||||
Archaeological Scoping Report - Metals Industrial Cluster | Archaeological Scoping Report for the Metals Industrial Cluster near Kuruman, NC Province | Archaeological Specialist Reports | 31/03/2016 | Jaco van der Walt | Heritage Contracts and Archaeological Consulting | Savannah Environmental (Pty) Ltd | 31/03/2016 - 15:57 | |
Heritage Report_Mixed Use Development_Waterfall | ARCHAEOLOGICAL AND HERITAGE IMPACT ASSESSMENT REPORT APPLICATION FOR ENVIRONMENTAL AUTHORISATION | Archaeological Specialist Reports | 02/10/2023 | Roy Muroyi | Tsimba Archaeological Footprints (Pty) Ltd | 26/10/2023 - 14:18 | ||
Ferrum Garona Heritage 2013 | Report Eskom Garona Ferrum Mercury | Archaeological Specialist Reports | 26/06/2013 | Cobus Dreyer | Envirolution Consulting (Pty) Ltd | 26/06/2013 - 12:56 | ||
Dispatch Rider Archaeological Impact Assessment | Archaeological Specialist Reports | 31/05/2022 - 12:37 | ||||||
AIA - Stella | Archaeological Impact Assessment Report for the Proposed Stella - Helpmekaaar 5 MW Solar Energy Facility near the town of Stella, North West Province | Archaeological Specialist Reports | 20/11/2013 | Jaco van der Walt | Heritage Contracts and Archaeological Consulting | Savannah Environmental (Pty) Ltd | 09/12/2013 - 11:26 | |
FS 30/5/1/1/2/10300 PR Baden-Baden | HERITAGE AND ARCHAEOLOGICAL IMPACT ASSESSMENT: CASE: FS 30/5/1/1/2/10300 PR | Archaeological Specialist Reports | 03/03/2015 | De Beers Consolidated Mines (Pty) Ltd | 24/03/2015 - 14:17 | |||
AIA Report - Oryx | Archaeological Impact Assessment report for the Oryx Solar Energy Facility | Archaeological Specialist Reports | 30/08/2013 | Jaco van der Walt | Heritage Contracts and Archaeological Consulting | Savannah Environmental (Pty) Ltd | 23/10/2013 - 16:20 | |
Archaeological Scoping Report - Ilanga CSP 9 (Nov2015) | Archaeological Scoping Report for the Ilanga CSP 9 facility and associated infrastructure within the Karoshoek Solar Development near Upington, NC Province | Archaeological Specialist Reports | 16/11/2015 | Jaco van der Walt | Heritage Contracts and Archaeological Consulting | Savannah Environmental (Pty) Ltd | 22/01/2016 - 15:01 | |
Archaeological Report for Loeriesfontein 1 WEF | Power line route options, access road and substation positions for the for proposed power line options for the Loeriesfontein 1 wind & Loeriesfontein 3 solar energy facility at sous and aan de karee doorn pan, north of Loeriesfontein, Northern Cape province | Archaeological Specialist Reports | 31/01/2013 | David Morris | McGregor Museum | 04/03/2013 - 10:06 | ||
FibreCo Repeater Sites_ Route 3_Heritage_2015 | FibreCo Telecommunications Ltd (FibreCo) was given environmental authorisation (EA) by the Department of Environmental Affairs in 2011 to construct and operate a fibre optic data cable along the national road between Cape Town and Durban (divided into three routes for assessment and authorisation purposes – routes 3, 4 and 5). An agreement reached between FibreCo and other telecommunication companies regarding the construction of the Cape-Durban route has resulted in changes to Route 3 (this project). Routes 4 and 5 have been assessed and discussed in a separate report. | Archaeological Specialist Reports | 20/05/2015 | Celeste Booth | SRK Consulting (Pty) Ltd - Pretoria | 20/05/2015 - 14:38 | ||
Assessment of Graves at Scaw Metals | A report on the assessment of grave sites at Scaw Metals, Germiston, City of Ekurhuleni in the Gauteng Province | Archaeological Specialist Reports | 06/12/2016 | 17/03/2017 - 12:48 | ||||
TsepongAIA-Jun15 | Archaeological Impact Assessment Report for the Proposed Harmony Gold Tsepong PV Facility in Welkom, Free State Province | Archaeological Specialist Reports | 17/06/2015 | Jaco van der Walt | Heritage Contracts and Archaeological Consulting | Savannah Environmental (Pty) Ltd | 01/07/2015 - 15:24 | |
AIA - Ilanga CSP 4 - Jun16 | AIA for the Ilanga CSP 4 | Archaeological Specialist Reports | 20/06/2016 | Jaco van der Walt | Heritage Contracts and Archaeological Consulting | Savannah Environmental (Pty) Ltd | 27/06/2016 - 12:03 | |
Letter of Exemption: Stuurmans kop and Quacha 49 | A letter of recommendation (with conditions) for the exemption of a full phase 1 AIA for the proposed agricultural development on Portion 8 of the Farm Stuurmans Kop No. 55 and Portion 125 of the Farm Quacha No. 49 near Patensie, Kouga Local Municipality, Eastern Cape Province | Archaeological Specialist Reports | 30/11/2022 | Kobus Reichert | Eastern Cape Heritage Consultants | Habitat Link Consulting (Pty) Ltd | 16/01/2023 - 16:36 | |
Tshepiso Primary School Development | School development | Archaeological Specialist Reports | 10/07/2017 | Siegwalt Udo Kusel | African Heritage Consultants CC | African Heritage Consultants CC | 17/07/2017 - 11:14 | |
ARCHAEOLOGICAL IMPACT ASSESSMENT, KEREN ENERGY KEIMOES SOLAR ENERGY FARM ON ERF 666 KEIMOES, NORTHERN CAPE | ARCHAEOLOGICAL IMPACT ASSESSMENT, KEREN ENERGY KEIMOES SOLAR ENERGY FARM ON ERF 666 KEIMOES, NORTHERN CAPE | Archaeological Specialist Reports | Jonathan Kaplan | Agency for Cultural Resources Management | Enviroafrica CC | 20/06/2017 - 14:12 | ||
Heritage Assessment - langa CSP 5 | Archaeological Impact Assessment Report for the Proposed Establishment of the Ilanga CSP 5 Project, near Upington, Northern Cape Province | Archaeological Specialist Reports | 11/04/2016 | Jaco van der Walt | Heritage Contracts and Archaeological Consulting | Savannah Environmental (Pty) Ltd | 18/05/2016 - 12:02 | |
Exemption Letter_De Aar WEF | RECOMMENDED EXEMPTION FROM HAVING TO CONDUCT AN ARCHAEOLOGICAL SURVEY OF 67 WIND TURBINES, PROPOSED DE AAR 1 (MAANHAARBERG) WIND ENERGY FARM, DE AAR, NORTHERN CAPE PROVINCE (CaseID 2944) | Archaeological Specialist Reports | 20/01/2014 | Jonathan Kaplan | Agency for Cultural Resources Management | 04/02/2014 - 14:32 | ||
Archaeological and Palaeontological | Archaeological and Palaeontological Impact Assessment FOR THE UPDATED EMP OF THE TRANS HEX MINING OPERATIONS, RICHTERSVELD, NORTHERN CAPE | Archaeological Specialist Reports | 02/12/2010 | Jaco van der Walt | Heritage Contracts and Archaeological Consulting | Myezo Environmental Management Services | 10/02/2022 - 13:32 | |
VICTOR SWITCHING STATION AND 132kV POWER LINE | A PHASE I HERITAGE IMPACT ASSESSMENT (HIA) STUDY FOR ESKOM’S PROPOSED NEW VICTOR SWITCHING STATION AND 132kV POWER LINE IN THE GREATER TUBATSE LOCAL MUNICIPALITY IN THE STEELPOORT VALLEY IN THE LIMPOPO PROVINCE | Archaeological Specialist Reports | 12/07/2013 | Julius CC Pistorius | Nzumbululo Heritage Solutions | Nzumbululo Heritage Solutions | 12/07/2013 - 15:43 | |
HERITAGE SURVEY OF THE OFFICE PARK ERF 1874, STUTTERHEIM, EASTERN CAPE | Archaeological Specialist Reports | 31/03/2013 | Gavin Anderson | Umlando: Archaeological Surveys & Heritage Management | Amathole District Municipality | 12/04/2013 - 12:32 | ||
AIA Construction Yards and Substation for De Aar WEF | Archaeological Impact Assessment: Proposed Construction Yards and Sub Station, Longyuan Mulilo De Aar Wind Energy Facility, Northern Cape. | Archaeological Specialist Reports | 28/02/2014 | Jonathan Kaplan | Agency for Cultural Resources Management | Longyuan Mulilo De Aar Wind Power (Pty) Ltd | 12/06/2014 - 11:26 |