FindReports

THIS IS THE ARCHIVE FOR SAHRIS 1.0


THIS SITE IS NOW AN ARCHIVE AND IS NOT SUITABLE FOR MAKING APPLICATIONS

Please be aware that no content and application creation or changes to information on this version of SAHRIS will be retained.

To make applications or utilise SAHRIS for the creation of information, please use the new site:

https://sahris.org.za

Changes to SAHRIS!

The South African Heritage Resources Information System (SAHRIS) has undergone a generational upgrade and restructure. These changes to the site include, but are not limited to:

  • A new & modernised look and layout
  • Improved site usage flows with respect to applications and content creation
  • Improved site performance and stability

Launch for the new version of SAHRIS occurred on Monday the 30th of October 2023.

The new site can be found here:

SAHRIS | SAHRIS

Advanced options
ReportRef ReportTitle ReportType ReportDate Authors AuthoringBody CommissioningCompany Post date
Ga Segonyana Filling Station Heritage Report HERITAGE IMPACT ASSESSMENT FOR THE PROPOSED CONSTRUCTION OF A FILLING STATION AND ASSOCIATED FACILITIES ON ERF 6279, DISTRICT MUNICIPALITY OF JOHN TAOLO GAETSEWE DISTRICT, GA-SEGONYANA LOCAL MUNICIPALITY NORTHERN CAPE PROVINCE HIA Phase 1 08/06/2017 Wouter Fourie PGS Heritage and Grave Relocation Consultants 23/06/2017 - 16:23
PIA for the Padloper EGI 1, NC & WC PALAEONTOLOGICAL IMPACT ASSESSMENT: FOUR PROPOSED 132 kV OVERHEAD POWERLINES ASSOCIATED WITH PADLOPER SOLAR FACILITIES 1-4 NEAR MURRAYSBURG, WESTERN CAPE AND NORTHERN CAPE PROVINCES Palaeontological Specialist Reports 14/07/2023 Elize Butler Banzai Environmental (Pty) Ltd African Clean Energy Developments (Pty) Ltd 27/09/2023 - 14:47
SWEP Phase 2 desktop Paleontological report Proposed Sishen Western Expansion Project (Expansion of the Western Waste Rock Dump 5 and Associated Infrastructure at Sishen Iron Ore Mine PIA Desktop 31/05/2021 Dr. Heidi Fourie Dr Heidi Fourie 02/09/2021 - 13:53
Draft Basic Assessment Reports and supporting Heritage Impact Assessment for 3 Eskom Gauteng powerline developments Eskom proposes to construct three (3) 132kV powerlines throughout the Gauteng Region. These include the 132kV Diamond-Bynes powerline, 132kV Bigtree-Refilwe-Pelly powerline and the 132kV Pelly-Fairfield powerline. The heritage specialist conducted heritage impact assessments for all three abovementioned projects and generated one (1) report containing the respective information for all three developments. Three (3) Basic Assessment Processes are currently underway for the abovementioned development. As such, three (3) separate DBARs have been uploaded for review and comment. Heritage Impact Assessment Specialist Reports 27/02/2015 Umeshree Naicker GIBB Engineering & Science - Head Office Eskom Holdings SOC Ltd 14/04/2015 - 10:57
Permit application for Site 9 Permit application for site 9 at Booysendal Platinum mine on the farm Booysendal 43JT, Steelpoort, Mpumalanga Office 23/02/2016 Jaco van der Walt 07/03/2016 - 13:59
VIA-Boschendal Village Development Proposed Boschendal Village Development, Stellenbosch Municipal Area, Western Cape Visual Impact Assessment Visual Impact Assessment 01/06/2016 Quinton Lawson, Bernard Oberholzer, Boschendal (Pty) Ltd 21/08/2017 - 11:18
AIA_Mbhashe_Mall_Van_Ryneveld_K_Sep10 Mbashe Mall and Service Station Project, Dutywa, Eastern Cape, South Africa AIA Phase 1 08/09/2010 Karen Van Ryneveld 16/06/2012 - 14:47
AIA[P1]-Erven 7540, 7541 & 7538, Kimberley, SPM, NC Phase 1 Archaeological Impact Assessment - 'Offer to Purchase' Property, Portions of Erf 7540, Erf 7541 and Erf 7538, Corner Quinn and Naude Streets, Kimberley, Sol Plaatje Municipality, Northern Cape 25/05/2016 Karen Van Ryneveld P&V Pillay Family Trust 25/05/2016 - 11:47
Phase 1 Investigation for the Proposed Rehabilitaion of the Boksbrug Lake Phase 1 Investigation for the Proposed Rehabilitation of the Boksburg Lake, Ekurhuleni Metropolitan Municipality, Gauteng HIA Phase 1 01/06/2018 Francois Coetzee Francois P Coetzee 27/11/2018 - 13:11
HIA Blue Wind Heritage Impact Assessment for the Proposed Project Blue Wind Energy Facility, Kleinzee, Namakwa Magisterial District, Northern Cape HIA Phase 1 30/05/2012 Jayson Orton, Lita Webley ACO Associates CC Savannah Environmental (Pty) Ltd 22/06/2012 - 11:25
umdloti sands HERITAGE SURVEY OF THE UMDLOTI SANDS DEVELOPMENT, UMDLOTI, KWAZULU-NATAL HIA Phase 1 22/02/2019 Gavin Anderson Umlando: Archaeological Surveys & Heritage Management Triplo4 Sustainable Solutions (Pty) Ltd 04/03/2019 - 15:18
Sani Pass groynes DESKTOP HERITAGE SURVEY OF THE PROPOSED GROYNES ON THE MKHONOZANA RIVER , SANI PASS, KZN HIA Letter of Exemption 23/08/2020 Gavin Anderson Umlando: Archaeological Surveys & Heritage Management Hanslab (Pty) Ltd 23/08/2020 - 12:37
Palaeontological Impact Assessment for the proposed Titanic and Gasesa Prospecting/Mining Rights Application, near Kuruman, Northern Cape Province PIA for the proposed Prrospecting activities on the Farms Titanic 773 and Gasesa 272, Northwest of Kuruman, Northern Cape Province PIA Desktop 26/01/2020 Marion Bamford Prof Marion Bamford Thaya Trading Enterprise 28/02/2022 - 20:21
HIA Waterloo South Heritage impact assessment for the PROPOSED DEVELOPMENT OF A PHOTOVOLTAIC POWER PLANT ON A PORTION OF THE FARM WATERLOO 992, VRYBURG REGION, NORTH WEST PROVINCE HIA Phase 1 01/10/2012 Johnny Van Schalkwyk Heritage Consultants Sonvanger Solar Power Plant (Pty) Ltd. 09/10/2012 - 09:00
Waterval Propect Heritage Impact Assessment Report Heritage Impact Assessment for the proposed Waterval Retrofit E-Feed Project located in Rustenburg, North West Province. Heritage Impact Assessment Specialist Reports 30/09/2013 Anton van Vollenhoven Archaetnos CC 21/11/2013 - 09:42
HIA Report for DA2S Transmission Lines and SS Heritage Impact Assessment Report for Proposed GRID CONNECTION FOR THE DE AAR 2 SOUTH WIND ENERGY FACILITY, DE AAR, NORTHERN CAPE (Assessment conducted under Section 38 (8) of the National Heritage Resources Act (No. 25 of 1999) as part of Basic Assessment) Heritage Impact Assessment Specialist Reports 21/04/2020 19/10/2020 - 17:55
Carmel 3 - HIA 27/02/2023 - 10:34
Klipdam Scoping Report Draft 20/02/2014 - 07:30
Heritage Impact Assessment of structures at 230 Currie Rd, Durban Heritage Impact Assessment of structures and proposed restoration and development at 230 Currie Rd, Rem of portion 4 of erf 3174, Durban HIA Phase 2 25/04/2023 Lindsay Napier Lindsay Napier Architect Tectura Projects (Pty)Ltd 26/04/2023 - 09:01
HIA Mbilane Bridge, KZN HERITAGE IMPACT ASSESSMENT OF THE PROPOSED MBILANE RIVER BRIDGE AT ULUNDI, NORTHERN KWAZULU-NATAL Heritage Impact Assessment Specialist Reports Frans Prins Active Heritage CC Green Door Environmental 02/07/2015 - 08:18
AIA Greengate 68 ARCHAEOLOGICAL IMPACT ASSESSMENT FOR THE PROPOSED GREENGATE EXT 68 CURRO SCHOOL DEVELOPMENT, GAUTENG AIA Phase 1 17/10/2016 Jaco van der Walt Heritage Contracts and Archaeological Consulting Prism Environmental Management Services cc 11/11/2017 - 09:09
AIA[P2.1]-Neotel, Kathu, NC - Final report - Archaeological Monitoring, Area 1 AIA[P2.1]-Neotel, Kathu, NC - Interim report - Archaeological Monitoring, Area 1 08/08/2016 Karen Van Ryneveld Enviroworks 08/08/2016 - 07:43
HIA Ventersdorp, North West Province HERITAGE IMPACT ASSESSMENT FOR THE PROPOSED VENTERSDORP TOWNSHIP ESTABLISHMENT, NORTH WEST PROVINCE PROJECT HIA Phase 1 14/11/2017 Jaco van der Walt Heritage Contracts and Archaeological Consulting METHALE ENVIRONMENTAL CONSULTING 13/02/2018 - 08:03
Archaeological Impact Assessment - Draft EIA Buffels 2 31/08/2016 Jaco van der Walt Heritage Contracts and Archaeological Consulting Savannah Environmental (Pty) Ltd 26/09/2016 - 13:32
Kusile Heritage Status Quo report STATUS QUO AND PRE-MITIGATION HERITAGE IMPACT ASSESSMENT REPORT FOR SUSPECTED BURIALS IDENTIFIED DURING PHASE 1 IMPACT ASSESSMENT STUDY FOR KUSILE 60 YEARS ASH-DUMP DEVELOPMENT IN EMALAHLENI LOCAL MUNICIPALITY, IN MPUMALANGA PROVINCE, SA. Archaeological Specialist Reports 29/12/2017 Mabuda Mmbudziseni Moses Mulaifa Development Projects cc Eskom - SOU 29/05/2019 - 18:03
Heritage Report for the expansion of Kokosi Cemetery PROPOSED EXPANSION OF KOKOSI CEMETERY, KOKOSI SETTLEMENT, SOUTH-WEST OF FOUCHVILLE, IN THE MERAFONG LOCAL MUNICIPALITY, GAUTENG PROVINCE HIA Phase 1 15/02/2022 Johnny DEM Environmental Services and Projects MERAFONG LOCAL MUNICIPALITY 02/05/2022 - 22:45
Postmasburg Power Line 132 kV Power line connection to the Humasrus Solar Thermal Energy Power plant, postmasburg. HIA Phase 1 22/03/2012 Wouter Fourie PGS Heritage and Grave Relocation Consultants Sivest - Gauteng 04/02/2013 - 10:32
Paleontological Desktop Assessment PALAEONTOLOGICAL DESKTOP ASSESSMENT FOR DE BEERS CONSOLIDATED MINES: PROPOSED DRILLING ON FARM 277, PORTION 1 OF FARM 293 AND PORTION 1 OF FARM 294, IN THE NORTHERN CAPE PIA Desktop 24/01/2021 Elize Butler Banzai Environmental (Pty) Ltd De Beers Consolidated Mines (Pty) Ltd 18/12/2020 - 15:06
Mitigation Report - Recording of York-001 Heritage – Mitigation: Recording of Farm Dwelling on the farm York, Kudumane Manganese Mining Co, Hotazel, Northern Cape Province AIA Phase 2 16/05/2022 Mauritz Naude PGS Heritage (Pty) Ltd Kudumane Manganese Resources (Pty) Ltd 30/06/2022 - 22:38
Memela The proposed forestry projects by Memela, M.W. (25ha) in respect of the same activity occurring in several locations in Boucher 15069ET Portion 1 farm in Umzimkhulu and Ubuhlebezwe local Municipalities within Sisonke District of Kwazulu Natal Province HIA Phase 1 08/08/2013 Gavin Whitelaw, Frans Roodt KwaZulu-Natal Amafa and Research Institute Shasa Heritage Consultants CC 11/04/2014 - 14:13
Malalane 389 JU and N4 National Road heritage report Phase 1 Archaeological and Heritage Impact Assessment on the farm Malelane 389 JU and alongside 10km of the N4 National Road in respect of the proposed widening of section 8X as well as certain access roads, Malalane, Mpumalanga Province. AIA Phase 1 13/10/2020 Jean-Pierre Celliers Kudzala Antiquity Enpact Environmental Consultants CC 04/03/2021 - 18:04
HIA & PIA Heritage & Palaeontological Statement Heritage Statement 19/04/2023 Jayson Orton 05/06/2023 - 09:29
Phase 1 PIA Waaihoek WEF PALAEONTOLOGICAL IMPACT ASSESSMENT REPORT Waaihoek Wind Energy Facility (WEF) Utrecht, Kwa-Zulu Natal Province PIA Phase 1 18/03/2014 Gideon Groenewald Coastal & Environmental Services - East London 27/06/2014 - 10:00
Buffalo Camp Heritage Impact Assessment Heritage Impact Assessment for proposed clearing of 70 ha diamondiferous material from the Buffalo Camp on the north eastern side of Kimberley, Northern Cape HIA Phase 1 29/05/2015 David Morris McGregor Museum SRK Consulting (Pty) Ltd - Western Cape 07/08/2015 - 17:07
Cultural Heritage Assessment of the Proposed Development of the Lapalala Wilderness School Cultural Heritage Assessment of the Proposed Development of the Lapalala Wilderness School on Portion 1 and 2 of the Farm Frischgewaagd 649LR, outside Lapalala Wilderness, Lephalale Local Municipality in the Waterberg District Municipality, Limpopo Province HIA Phase 1 15/12/2016 Francois Coetzee NuLeaf Planning & Environmental 22/02/2017 - 12:25
HIA: Khoi-Sun Solar Farm Heritage Report for the Proposed extension of the EA granted for the proposed development of the Khoi-Sun Solar Farm near the Orange River in the Northern Cape HIA Phase 1 18/05/2023 Jenna Lavin, Nicholas Wiltshire CTS Heritage Savannah Environmental (Pty) Ltd 18/07/2023 - 10:05
Palaeontological Assessment for Palm Springs Recreational Facility Development Palaeontological Desktop Assessment for the proposed development of a Multi-Purpose Recreational Facility in Palm Springs, for Emfuleni Local Municipality, Sedibeng District Municipality, Gauteng Province PIA Desktop 28/07/2015 Gideon Groenewald 07/10/2015 - 11:56
HERITAGE SCOPING ASSESSMENT FOR THE PROPOSED LC DE VILLIERS CULVERT UPGRADE PROJECT, PRETORIA, GAUTENG PROVINCE HERITAGE SCOPING ASSESSMENT FOR THE PROPOSED LC DE VILLIERS CULVERT UPGRADE PROJECT ON THE REMAINDER OF PORTION 0 OF THE FARM KOEDOESPOORT 456 JR, PRETORIA, TSHWANE MUNICIPAL AREA, GAUTENG PROVINCE HIA Letter of Exemption 15/09/2016 Neels Kruger Exigo Sustainability Exigo Sustainability 09/11/2016 - 15:48
HIA; Expasnion of Existing Borrow Pit, OPO5960, Cape Winelands Heritage Impact Assessment for Expansion of an Existing Borrow Pit Located Along OPO 5960 Approximately 35 km northwest of Montagu in Cape Winelands District Municipality, Western Cape. HIA Phase 1 29/08/2012 Quahnita Samie, John Almond Vidamemoria Heritage Consultants, Natura Viva CC Nadeson Consulting Services 12/06/2018 - 11:28
Mooikloof Retail Park - HIA 28/08/2019 - 16:30
AIA_Whitebank_Keren_Solar_475_Kaplan_JM_Mar12 ARCHAEOLOGICAL IMPACT ASSESSMENT THE PROPOSED WHITEBANK KEREN ENERGY SOLAR PLANT ON FARM 379 NEAR KURUMAN NORTHERN CAPE PROVINCE AIA Phase 1 24/03/2012 Jonathan Kaplan Agency for Cultural Resources Management 16/06/2012 - 14:51
Amended Heritage Report - Dipompong and Tswaing 132kV Substations Amended heritage assessment report for the PROPOSED WINTERVELD 132KV POWER LINE, GARANKUWA REGION, NORTH WEST AND GAUTENG PROVINCES Heritage Study 18/04/2013 Johnny Van Schalkwyk Envirolution Consulting (Pty) Ltd 22/04/2013 - 14:41
2002_SRK 305804 EMPR Addendum_Heritage Study A cultural Heritage Impact Assessment for the Proposed new open pit for PPRust on the farm Zwartfontein 818LR in the Northern Province of Soutg Africa. Amendment to the PPRust Environmental Management Programme Report Heritage Impact Assessment Specialist Reports Julius CC Pistorius Dr Julius CC Pistorious Archaeologist and heritage Consultant 25/11/2019 - 10:13
FPC1905 Phase 1 Investigation for the Proposed Construction of Several Layer, Rearing Houses and Broilers with Associated Activities and Supporting Infrastructure on Portion 2 of the Farm Rietfontein 210 IP, Portion 1 of the Farm Oatlands 79 IP and Portion 1 of the Farm Ventersdraai 183 IP, JB Marks Local Municipality, Dr Kenneth Kaunda District Municipality, North West Province. HIA Phase 1 11/08/2022 24/08/2022 - 16:56
Muizenberg Burial Report-All individuals Skeletal Report:Remains discovered at the SAPS Museum, 186 Main Road,Muizenberg, Western Cape (HWC permit number 110810TG12 and SAHRA permit number BGG13/01/00186) BGG Phase 2 15/02/2013 Jacqui Friedling, Belinda Speed 28/06/2013 - 09:49
Public Participation Report_ Section 41 Application of the Kwa Zulu Natal Heritage Act No 4 of 2008 Heritage Impact Assessment Building structures on Portion 3, 4, 5 and 68 of Erf 498 Scottsville Public Participation Report_ Section 41 Application of the Kwa Zulu Natal Heritage Act No 4 of 2008 Heritage Impact Assessment Building structures on Portion 3, 4, 5 and 68 of Erf 498 Scottsville Heritage Impact Assessment Specialist Reports 03/05/2021 Judith Muindisi Tsica Heritage Consultants ADOWA Property Developers 03/05/2021 - 17:54
Mercury PL HIA 19/10/2022 - 15:43
Heritage Assessment of the solid waste disposal site Curries Camp First phase archaeological and heritage assessment of the solid waste disposal site at Curries Camp near Upington, Northern Cape Take note: also phase 1 heritage assessment. AIA Phase 1 27/08/2014 Cobus Dreyer 23/09/2014 - 11:19
HIA Eldorette X53 A REPORT ON A CULTURAL HERITAGE IMPACT ASSESSMENT FOR A PROPOSED TOWNSHIP DEVELOPMENT ON HOLDING 45 HEATHERDALE AGRICULTURAL HOLDINGS, CITY OF TSHWANE, GAUTENG PROVINCE Heritage Impact Assessment Specialist Reports 13/12/2016 Anton van Vollenhoven Archaetnos Culture & Cultural Resource Consultants Texture Environmental Consultants 10/04/2017 - 22:17
DESKTOP PALAEONTOLOGICAL IMPACT ASSESSMENT New Hope Solar Park 1, 2 3 and 4 and Powerline. DESKTOP PALAEONTOLOGICAL IMPACT ASSESSMENT New Hope Solar Park 1, 2 3 and 4 and Powerline. PIA Desktop 15/04/2021 Bruce Rubidge University of the Witwatersrand - Evolutionary Studies Institute AGES (PTY) Ltd - Limpopo 24/06/2021 - 08:55

Pages

CSV
 
 

Search form