THIS IS THE ARCHIVE FOR SAHRIS 1.0
THIS SITE IS NOW AN ARCHIVE AND IS NOT SUITABLE FOR MAKING APPLICATIONS
Please be aware that no content and application creation or changes to information on this version of SAHRIS will be retained.
To make applications or utilise SAHRIS for the creation of information, please use the new site:
https://sahris.org.za
Changes to SAHRIS!
The South African Heritage Resources Information System (SAHRIS) has undergone a generational upgrade and restructure. These changes to the site include, but are not limited to:
- A new & modernised look and layout
- Improved site usage flows with respect to applications and content creation
- Improved site performance and stability
Launch for the new version of SAHRIS occurred on Monday the 30th of October 2023.
The new site can be found here:
SAHRIS | SAHRIS
Displaying 17501 - 17550 of 18975
ReportRef | ReportTitle | ReportType | ReportDate | Authors | AuthoringBody | CommissioningCompany | Post date |
---|---|---|---|---|---|---|---|
Ga Segonyana Filling Station Heritage Report | HERITAGE IMPACT ASSESSMENT FOR THE PROPOSED CONSTRUCTION OF A FILLING STATION AND ASSOCIATED FACILITIES ON ERF 6279, DISTRICT MUNICIPALITY OF JOHN TAOLO GAETSEWE DISTRICT, GA-SEGONYANA LOCAL MUNICIPALITY NORTHERN CAPE PROVINCE | HIA Phase 1 | 08/06/2017 | Wouter Fourie | PGS Heritage and Grave Relocation Consultants | 23/06/2017 - 16:23 | |
PIA for the Padloper EGI 1, NC & WC | PALAEONTOLOGICAL IMPACT ASSESSMENT: FOUR PROPOSED 132 kV OVERHEAD POWERLINES ASSOCIATED WITH PADLOPER SOLAR FACILITIES 1-4 NEAR MURRAYSBURG, WESTERN CAPE AND NORTHERN CAPE PROVINCES | Palaeontological Specialist Reports | 14/07/2023 | Elize Butler | Banzai Environmental (Pty) Ltd | African Clean Energy Developments (Pty) Ltd | 27/09/2023 - 14:47 |
SWEP Phase 2 desktop Paleontological report | Proposed Sishen Western Expansion Project (Expansion of the Western Waste Rock Dump 5 and Associated Infrastructure at Sishen Iron Ore Mine | PIA Desktop | 31/05/2021 | Dr. Heidi Fourie | Dr Heidi Fourie | 02/09/2021 - 13:53 | |
Draft Basic Assessment Reports and supporting Heritage Impact Assessment for 3 Eskom Gauteng powerline developments | Eskom proposes to construct three (3) 132kV powerlines throughout the Gauteng Region. These include the 132kV Diamond-Bynes powerline, 132kV Bigtree-Refilwe-Pelly powerline and the 132kV Pelly-Fairfield powerline. The heritage specialist conducted heritage impact assessments for all three abovementioned projects and generated one (1) report containing the respective information for all three developments. Three (3) Basic Assessment Processes are currently underway for the abovementioned development. As such, three (3) separate DBARs have been uploaded for review and comment. | Heritage Impact Assessment Specialist Reports | 27/02/2015 | Umeshree Naicker | GIBB Engineering & Science - Head Office | Eskom Holdings SOC Ltd | 14/04/2015 - 10:57 |
Permit application for Site 9 | Permit application for site 9 at Booysendal Platinum mine on the farm Booysendal 43JT, Steelpoort, Mpumalanga Office | 23/02/2016 | Jaco van der Walt | 07/03/2016 - 13:59 | |||
VIA-Boschendal Village Development | Proposed Boschendal Village Development, Stellenbosch Municipal Area, Western Cape Visual Impact Assessment | Visual Impact Assessment | 01/06/2016 | Quinton Lawson, Bernard Oberholzer, | Boschendal (Pty) Ltd | 21/08/2017 - 11:18 | |
AIA_Mbhashe_Mall_Van_Ryneveld_K_Sep10 | Mbashe Mall and Service Station Project, Dutywa, Eastern Cape, South Africa | AIA Phase 1 | 08/09/2010 | Karen Van Ryneveld | 16/06/2012 - 14:47 | ||
AIA[P1]-Erven 7540, 7541 & 7538, Kimberley, SPM, NC | Phase 1 Archaeological Impact Assessment - 'Offer to Purchase' Property, Portions of Erf 7540, Erf 7541 and Erf 7538, Corner Quinn and Naude Streets, Kimberley, Sol Plaatje Municipality, Northern Cape | 25/05/2016 | Karen Van Ryneveld | P&V Pillay Family Trust | 25/05/2016 - 11:47 | ||
Phase 1 Investigation for the Proposed Rehabilitaion of the Boksbrug Lake | Phase 1 Investigation for the Proposed Rehabilitation of the Boksburg Lake, Ekurhuleni Metropolitan Municipality, Gauteng | HIA Phase 1 | 01/06/2018 | Francois Coetzee | Francois P Coetzee | 27/11/2018 - 13:11 | |
HIA Blue Wind | Heritage Impact Assessment for the Proposed Project Blue Wind Energy Facility, Kleinzee, Namakwa Magisterial District, Northern Cape | HIA Phase 1 | 30/05/2012 | Jayson Orton, Lita Webley | ACO Associates CC | Savannah Environmental (Pty) Ltd | 22/06/2012 - 11:25 |
umdloti sands | HERITAGE SURVEY OF THE UMDLOTI SANDS DEVELOPMENT, UMDLOTI, KWAZULU-NATAL | HIA Phase 1 | 22/02/2019 | Gavin Anderson | Umlando: Archaeological Surveys & Heritage Management | Triplo4 Sustainable Solutions (Pty) Ltd | 04/03/2019 - 15:18 |
Sani Pass groynes | DESKTOP HERITAGE SURVEY OF THE PROPOSED GROYNES ON THE MKHONOZANA RIVER , SANI PASS, KZN | HIA Letter of Exemption | 23/08/2020 | Gavin Anderson | Umlando: Archaeological Surveys & Heritage Management | Hanslab (Pty) Ltd | 23/08/2020 - 12:37 |
Palaeontological Impact Assessment for the proposed Titanic and Gasesa Prospecting/Mining Rights Application, near Kuruman, Northern Cape Province | PIA for the proposed Prrospecting activities on the Farms Titanic 773 and Gasesa 272, Northwest of Kuruman, Northern Cape Province | PIA Desktop | 26/01/2020 | Marion Bamford | Prof Marion Bamford | Thaya Trading Enterprise | 28/02/2022 - 20:21 |
HIA Waterloo South | Heritage impact assessment for the PROPOSED DEVELOPMENT OF A PHOTOVOLTAIC POWER PLANT ON A PORTION OF THE FARM WATERLOO 992, VRYBURG REGION, NORTH WEST PROVINCE | HIA Phase 1 | 01/10/2012 | Johnny Van Schalkwyk | Heritage Consultants | Sonvanger Solar Power Plant (Pty) Ltd. | 09/10/2012 - 09:00 |
Waterval Propect Heritage Impact Assessment Report | Heritage Impact Assessment for the proposed Waterval Retrofit E-Feed Project located in Rustenburg, North West Province. | Heritage Impact Assessment Specialist Reports | 30/09/2013 | Anton van Vollenhoven | Archaetnos CC | 21/11/2013 - 09:42 | |
HIA Report for DA2S Transmission Lines and SS | Heritage Impact Assessment Report for Proposed GRID CONNECTION FOR THE DE AAR 2 SOUTH WIND ENERGY FACILITY, DE AAR, NORTHERN CAPE (Assessment conducted under Section 38 (8) of the National Heritage Resources Act (No. 25 of 1999) as part of Basic Assessment) | Heritage Impact Assessment Specialist Reports | 21/04/2020 | 19/10/2020 - 17:55 | |||
Carmel 3 - HIA | 27/02/2023 - 10:34 | ||||||
Klipdam Scoping Report | Draft | 20/02/2014 - 07:30 | |||||
Heritage Impact Assessment of structures at 230 Currie Rd, Durban | Heritage Impact Assessment of structures and proposed restoration and development at 230 Currie Rd, Rem of portion 4 of erf 3174, Durban | HIA Phase 2 | 25/04/2023 | Lindsay Napier | Lindsay Napier Architect | Tectura Projects (Pty)Ltd | 26/04/2023 - 09:01 |
HIA Mbilane Bridge, KZN | HERITAGE IMPACT ASSESSMENT OF THE PROPOSED MBILANE RIVER BRIDGE AT ULUNDI, NORTHERN KWAZULU-NATAL | Heritage Impact Assessment Specialist Reports | Frans Prins | Active Heritage CC | Green Door Environmental | 02/07/2015 - 08:18 | |
AIA Greengate 68 | ARCHAEOLOGICAL IMPACT ASSESSMENT FOR THE PROPOSED GREENGATE EXT 68 CURRO SCHOOL DEVELOPMENT, GAUTENG | AIA Phase 1 | 17/10/2016 | Jaco van der Walt | Heritage Contracts and Archaeological Consulting | Prism Environmental Management Services cc | 11/11/2017 - 09:09 |
AIA[P2.1]-Neotel, Kathu, NC - Final report - Archaeological Monitoring, Area 1 | AIA[P2.1]-Neotel, Kathu, NC - Interim report - Archaeological Monitoring, Area 1 | 08/08/2016 | Karen Van Ryneveld | Enviroworks | 08/08/2016 - 07:43 | ||
HIA Ventersdorp, North West Province | HERITAGE IMPACT ASSESSMENT FOR THE PROPOSED VENTERSDORP TOWNSHIP ESTABLISHMENT, NORTH WEST PROVINCE PROJECT | HIA Phase 1 | 14/11/2017 | Jaco van der Walt | Heritage Contracts and Archaeological Consulting | METHALE ENVIRONMENTAL CONSULTING | 13/02/2018 - 08:03 |
Archaeological Impact Assessment - Draft EIA Buffels 2 | 31/08/2016 | Jaco van der Walt | Heritage Contracts and Archaeological Consulting | Savannah Environmental (Pty) Ltd | 26/09/2016 - 13:32 | ||
Kusile Heritage Status Quo report | STATUS QUO AND PRE-MITIGATION HERITAGE IMPACT ASSESSMENT REPORT FOR SUSPECTED BURIALS IDENTIFIED DURING PHASE 1 IMPACT ASSESSMENT STUDY FOR KUSILE 60 YEARS ASH-DUMP DEVELOPMENT IN EMALAHLENI LOCAL MUNICIPALITY, IN MPUMALANGA PROVINCE, SA. | Archaeological Specialist Reports | 29/12/2017 | Mabuda Mmbudziseni Moses | Mulaifa Development Projects cc | Eskom - SOU | 29/05/2019 - 18:03 |
Heritage Report for the expansion of Kokosi Cemetery | PROPOSED EXPANSION OF KOKOSI CEMETERY, KOKOSI SETTLEMENT, SOUTH-WEST OF FOUCHVILLE, IN THE MERAFONG LOCAL MUNICIPALITY, GAUTENG PROVINCE | HIA Phase 1 | 15/02/2022 | Johnny | DEM Environmental Services and Projects | MERAFONG LOCAL MUNICIPALITY | 02/05/2022 - 22:45 |
Postmasburg Power Line | 132 kV Power line connection to the Humasrus Solar Thermal Energy Power plant, postmasburg. | HIA Phase 1 | 22/03/2012 | Wouter Fourie | PGS Heritage and Grave Relocation Consultants | Sivest - Gauteng | 04/02/2013 - 10:32 |
Paleontological Desktop Assessment | PALAEONTOLOGICAL DESKTOP ASSESSMENT FOR DE BEERS CONSOLIDATED MINES: PROPOSED DRILLING ON FARM 277, PORTION 1 OF FARM 293 AND PORTION 1 OF FARM 294, IN THE NORTHERN CAPE | PIA Desktop | 24/01/2021 | Elize Butler | Banzai Environmental (Pty) Ltd | De Beers Consolidated Mines (Pty) Ltd | 18/12/2020 - 15:06 |
Mitigation Report - Recording of York-001 | Heritage – Mitigation: Recording of Farm Dwelling on the farm York, Kudumane Manganese Mining Co, Hotazel, Northern Cape Province | AIA Phase 2 | 16/05/2022 | Mauritz Naude | PGS Heritage (Pty) Ltd | Kudumane Manganese Resources (Pty) Ltd | 30/06/2022 - 22:38 |
Memela | The proposed forestry projects by Memela, M.W. (25ha) in respect of the same activity occurring in several locations in Boucher 15069ET Portion 1 farm in Umzimkhulu and Ubuhlebezwe local Municipalities within Sisonke District of Kwazulu Natal Province | HIA Phase 1 | 08/08/2013 | Gavin Whitelaw, Frans Roodt | KwaZulu-Natal Amafa and Research Institute | Shasa Heritage Consultants CC | 11/04/2014 - 14:13 |
Malalane 389 JU and N4 National Road heritage report | Phase 1 Archaeological and Heritage Impact Assessment on the farm Malelane 389 JU and alongside 10km of the N4 National Road in respect of the proposed widening of section 8X as well as certain access roads, Malalane, Mpumalanga Province. | AIA Phase 1 | 13/10/2020 | Jean-Pierre Celliers | Kudzala Antiquity | Enpact Environmental Consultants CC | 04/03/2021 - 18:04 |
HIA & PIA | Heritage & Palaeontological Statement | Heritage Statement | 19/04/2023 | Jayson Orton | 05/06/2023 - 09:29 | ||
Phase 1 PIA Waaihoek WEF | PALAEONTOLOGICAL IMPACT ASSESSMENT REPORT Waaihoek Wind Energy Facility (WEF) Utrecht, Kwa-Zulu Natal Province | PIA Phase 1 | 18/03/2014 | Gideon Groenewald | Coastal & Environmental Services - East London | 27/06/2014 - 10:00 | |
Buffalo Camp Heritage Impact Assessment | Heritage Impact Assessment for proposed clearing of 70 ha diamondiferous material from the Buffalo Camp on the north eastern side of Kimberley, Northern Cape | HIA Phase 1 | 29/05/2015 | David Morris | McGregor Museum | SRK Consulting (Pty) Ltd - Western Cape | 07/08/2015 - 17:07 |
Cultural Heritage Assessment of the Proposed Development of the Lapalala Wilderness School | Cultural Heritage Assessment of the Proposed Development of the Lapalala Wilderness School on Portion 1 and 2 of the Farm Frischgewaagd 649LR, outside Lapalala Wilderness, Lephalale Local Municipality in the Waterberg District Municipality, Limpopo Province | HIA Phase 1 | 15/12/2016 | Francois Coetzee | NuLeaf Planning & Environmental | 22/02/2017 - 12:25 | |
HIA: Khoi-Sun Solar Farm | Heritage Report for the Proposed extension of the EA granted for the proposed development of the Khoi-Sun Solar Farm near the Orange River in the Northern Cape | HIA Phase 1 | 18/05/2023 | Jenna Lavin, Nicholas Wiltshire | CTS Heritage | Savannah Environmental (Pty) Ltd | 18/07/2023 - 10:05 |
Palaeontological Assessment for Palm Springs Recreational Facility Development | Palaeontological Desktop Assessment for the proposed development of a Multi-Purpose Recreational Facility in Palm Springs, for Emfuleni Local Municipality, Sedibeng District Municipality, Gauteng Province | PIA Desktop | 28/07/2015 | Gideon Groenewald | 07/10/2015 - 11:56 | ||
HERITAGE SCOPING ASSESSMENT FOR THE PROPOSED LC DE VILLIERS CULVERT UPGRADE PROJECT, PRETORIA, GAUTENG PROVINCE | HERITAGE SCOPING ASSESSMENT FOR THE PROPOSED LC DE VILLIERS CULVERT UPGRADE PROJECT ON THE REMAINDER OF PORTION 0 OF THE FARM KOEDOESPOORT 456 JR, PRETORIA, TSHWANE MUNICIPAL AREA, GAUTENG PROVINCE | HIA Letter of Exemption | 15/09/2016 | Neels Kruger | Exigo Sustainability | Exigo Sustainability | 09/11/2016 - 15:48 |
HIA; Expasnion of Existing Borrow Pit, OPO5960, Cape Winelands | Heritage Impact Assessment for Expansion of an Existing Borrow Pit Located Along OPO 5960 Approximately 35 km northwest of Montagu in Cape Winelands District Municipality, Western Cape. | HIA Phase 1 | 29/08/2012 | Quahnita Samie, John Almond | Vidamemoria Heritage Consultants, Natura Viva CC | Nadeson Consulting Services | 12/06/2018 - 11:28 |
Mooikloof Retail Park - HIA | 28/08/2019 - 16:30 | ||||||
AIA_Whitebank_Keren_Solar_475_Kaplan_JM_Mar12 | ARCHAEOLOGICAL IMPACT ASSESSMENT THE PROPOSED WHITEBANK KEREN ENERGY SOLAR PLANT ON FARM 379 NEAR KURUMAN NORTHERN CAPE PROVINCE | AIA Phase 1 | 24/03/2012 | Jonathan Kaplan | Agency for Cultural Resources Management | 16/06/2012 - 14:51 | |
Amended Heritage Report - Dipompong and Tswaing 132kV Substations | Amended heritage assessment report for the PROPOSED WINTERVELD 132KV POWER LINE, GARANKUWA REGION, NORTH WEST AND GAUTENG PROVINCES | Heritage Study | 18/04/2013 | Johnny Van Schalkwyk | Envirolution Consulting (Pty) Ltd | 22/04/2013 - 14:41 | |
2002_SRK 305804 EMPR Addendum_Heritage Study | A cultural Heritage Impact Assessment for the Proposed new open pit for PPRust on the farm Zwartfontein 818LR in the Northern Province of Soutg Africa. Amendment to the PPRust Environmental Management Programme Report | Heritage Impact Assessment Specialist Reports | Julius CC Pistorius | Dr Julius CC Pistorious Archaeologist and heritage Consultant | 25/11/2019 - 10:13 | ||
FPC1905 | Phase 1 Investigation for the Proposed Construction of Several Layer, Rearing Houses and Broilers with Associated Activities and Supporting Infrastructure on Portion 2 of the Farm Rietfontein 210 IP, Portion 1 of the Farm Oatlands 79 IP and Portion 1 of the Farm Ventersdraai 183 IP, JB Marks Local Municipality, Dr Kenneth Kaunda District Municipality, North West Province. | HIA Phase 1 | 11/08/2022 | 24/08/2022 - 16:56 | |||
Muizenberg Burial Report-All individuals | Skeletal Report:Remains discovered at the SAPS Museum, 186 Main Road,Muizenberg, Western Cape (HWC permit number 110810TG12 and SAHRA permit number BGG13/01/00186) | BGG Phase 2 | 15/02/2013 | Jacqui Friedling, Belinda Speed | 28/06/2013 - 09:49 | ||
Public Participation Report_ Section 41 Application of the Kwa Zulu Natal Heritage Act No 4 of 2008 Heritage Impact Assessment Building structures on Portion 3, 4, 5 and 68 of Erf 498 Scottsville | Public Participation Report_ Section 41 Application of the Kwa Zulu Natal Heritage Act No 4 of 2008 Heritage Impact Assessment Building structures on Portion 3, 4, 5 and 68 of Erf 498 Scottsville | Heritage Impact Assessment Specialist Reports | 03/05/2021 | Judith Muindisi | Tsica Heritage Consultants | ADOWA Property Developers | 03/05/2021 - 17:54 |
Mercury PL HIA | 19/10/2022 - 15:43 | ||||||
Heritage Assessment of the solid waste disposal site Curries Camp | First phase archaeological and heritage assessment of the solid waste disposal site at Curries Camp near Upington, Northern Cape Take note: also phase 1 heritage assessment. | AIA Phase 1 | 27/08/2014 | Cobus Dreyer | 23/09/2014 - 11:19 | ||
HIA Eldorette X53 | A REPORT ON A CULTURAL HERITAGE IMPACT ASSESSMENT FOR A PROPOSED TOWNSHIP DEVELOPMENT ON HOLDING 45 HEATHERDALE AGRICULTURAL HOLDINGS, CITY OF TSHWANE, GAUTENG PROVINCE | Heritage Impact Assessment Specialist Reports | 13/12/2016 | Anton van Vollenhoven | Archaetnos Culture & Cultural Resource Consultants | Texture Environmental Consultants | 10/04/2017 - 22:17 |
DESKTOP PALAEONTOLOGICAL IMPACT ASSESSMENT New Hope Solar Park 1, 2 3 and 4 and Powerline. | DESKTOP PALAEONTOLOGICAL IMPACT ASSESSMENT New Hope Solar Park 1, 2 3 and 4 and Powerline. | PIA Desktop | 15/04/2021 | Bruce Rubidge | University of the Witwatersrand - Evolutionary Studies Institute | AGES (PTY) Ltd - Limpopo | 24/06/2021 - 08:55 |