THIS IS THE ARCHIVE FOR SAHRIS 1.0
THIS SITE IS NOW AN ARCHIVE AND IS NOT SUITABLE FOR MAKING APPLICATIONS
Please be aware that no content and application creation or changes to information on this version of SAHRIS will be retained.
To make applications or utilise SAHRIS for the creation of information, please use the new site:
https://sahris.org.za
Changes to SAHRIS!
The South African Heritage Resources Information System (SAHRIS) has undergone a generational upgrade and restructure. These changes to the site include, but are not limited to:
- A new & modernised look and layout
- Improved site usage flows with respect to applications and content creation
- Improved site performance and stability
Launch for the new version of SAHRIS occurred on Monday the 30th of October 2023.
The new site can be found here:
SAHRIS | SAHRIS
Displaying 17501 - 17550 of 18975
ReportRef | ReportTitle | ReportType | ReportDate | Authors | AuthoringBody | CommissioningCompany | MapID < 2009 | Post date |
---|---|---|---|---|---|---|---|---|
ASR - Stormberg Renewable | Archaeological Scoping Report for the Proposed Stormberg Renewable Energy Project, Sterkstroom District, Eastern Cape | Archaeological Specialist Reports | 20/06/2013 | Jaco van der Walt | Heritage Contracts and Archaeological Consulting | Savannah Environmental (Pty) Ltd | 11/04/2014 - 10:40 | |
Ngululu Heritage and Paleontological reports | Heritage and paleontological specialist reports for the proposed Ngululu coal mine, Delmas, Mpumalanga | Archaeological Specialist Reports | Dr. Heidi Fourie | Dr Heidi Fourie | Dr Heidi Fourie | 06/02/2015 - 12:31 | ||
AIA Wrenchville | Archaeological Impact Assessment Wrenchville Phase 2 Low Cost Housing Development, RE Erf 1, Kuruman, Northern Cape. | Archaeological Specialist Reports | 08/10/2019 | Jonathan Kaplan | 16/10/2019 - 10:00 | |||
Construction of the New Nzalo (Mqwabe) 400/88kV, 160MVA Substation with associated 88kV and 400kV turn in power lines East of Vryheid, KwaZulu-Natal Province | Construction of the New Nzalo (Mqwabe) 400/88kV, 160MVA Substation with associated 88kV and 400kV turn in power lines East of Vryheid, KwaZulu-Natal Province | Archaeological Specialist Reports | 12/02/2020 | Munyadziwa Magoma | Vhubvo Archaeo-Heritage Consultants | Vhubvo Archaeo-Heritage Consultants | 18/02/2020 - 09:44 | |
Archaeological Report for Khobab Power Line & Substation | Power Line Route Options, Access Road and Substation Positions for the Khobab WEF | Archaeological Specialist Reports | 31/01/2013 | David Morris | McGregor Museum | 04/03/2013 - 09:44 | ||
Wolvekrans Colliery North: Proposed Expansion | Archaeological Assessment for the Wolvekrans Colliery North Section, Life of Asset Opencast Expansion and Dispatch Rider project, Middelburg, Mpumalanga Province | Archaeological Specialist Reports | 04/05/2016 | Jaco van der Walt | Prism Environmental Management Services cc | Jones & Wagener Engineering and Environmental Consultants | 14/11/2016 - 13:03 | |
AIA-Transalloy | AIA for the Proposed Transalloys Coal-Fired Power Plant | Archaeological Specialist Reports | 04/08/2014 | Jaco van der Walt | Heritage Contracts and Archaeological Consulting | Savannah Environmental (Pty) Ltd | 31/03/2015 - 14:20 | |
ARCHAEOLOGICAL SPECIALIST STUDY OF THE PROPOSED HOUSING DEVELOPMENT ON ERF 1283 | ARCHAEOLOGICAL SPECIALIST STUDY OF THE PROPOSED HOUSING DEVELOPMENT ON ERF 1283, VELDDRIF, WESTERN CAPE | Archaeological Specialist Reports | 01/10/2014 | Lita Webley | ACO Associates CC | SRK Consulting (South Africa) (Pty) Ltd - PLZ | CTS_329660 | 08/09/2015 - 09:03 |
AIA for the Botswana-South Africa Transmission Line Project | Archaeological Impact Assessment for the BOSA Transmission Line Project from the Isang Substation to the Tlokweng Border Post in the South Eastern and Kgatleng Districts of Botswana | Archaeological Specialist Reports | 01/09/2017 | Wim Biemond | Lentswe Archaeological Consultants | Aurecon South Africa (Pty) Ltd, Digby Wells Environmental, G&A Heritage Management Consultants | 23/01/2018 - 12:41 | |
Abersethin Heritage report | ARCHAEOLOGICAL IMPACT ASSESSMENT SPECIALIST STUDY REPORT FOR THE PROPOSED NEW ABERSETHIN SUBSTATION AND LOOP IN LOOP OUT LINES IN BOHLOKONG TOWNSHIP OF DIHLABENG LOCAL MUNICIPALITY WITHIN THABO MOFUTSANYANA DISTRICT MUNICIPALITY. FREE STATE PROVINCE. | Archaeological Specialist Reports | 17/03/2014 | Munyadziwa Magoma | Vhubvo Archaeo-Heritage Consultants | Vhubvo Archaeo-Heritage Consultants | 31/03/2014 - 13:25 | |
Archaeological Impact Assessment Report - Ilanga CSP 9 (Jun2016) | Ilanga CSP9 and Associated Infrastructure Within Karoshoek Solar Valley Development Near Upington, Northern Cape Province | Archaeological Specialist Reports | 14/06/2016 | Jaco van der Walt | Heritage Contracts and Archaeological Consulting | Savannah Environmental (Pty) Ltd | 08/07/2016 - 10:44 | |
Kemo Dump 2006 Permit application | Archaeological Specialist Reports | David Morris | 11/05/2023 - 09:36 | |||||
Kloofsig 2 AIA | Archaeological Impact Assessment of the proposed Kloofsig 2 Solar PV Energy Facility on the remainder of the Farm Kalkpoort 18, Petrusville area, REsnosterberg Local Municipality, Northern Cape. | Archaeological Specialist Reports | 24/10/2016 | Madelon Tusenius | Natura Viva CC | SRK Consulting (South Africa) (Pty) Ltd - PLZ | 10/01/2017 - 15:45 | |
Heritage report for Eskom Luiperdshoek 33kv Powerline | Archaeological Impact Assessment for the Proposed Eskom Pofadder-Luiperdshoek 11kv Powerline Project | Archaeological Specialist Reports | 21/02/2013 | Jonathan Kaplan | Agency for Cultural Resources Management | Eskom - NWOU | 12/08/2013 - 11:08 | |
DCA_Pre-Application_BAR_App_D4_HIA_Palaeontology | EXPANSION OF DIAMOND COAST AQUACULTURE FARM PORTION 1 OF FARM KLEINZEE 654, KLEINZEE, NORTHERN CAPE, Nama Khoi Municipality, Namakwaland Magisterial District | Archaeological Specialist Reports | 31/05/2018 | John Pether | Geological and Palaeontological Consultant | Agency for Cultural Resources Management | 16/05/2018 - 13:07 | |
ARCHAEOLOGICAL IMPACT ASSESSMENT ROMA ENERGY MOUNT ROPER PV PLANT ON FARM 321 NEAR KURUMAN, NORTHERN CAPE PROVINCE | ARCHAEOLOGICAL IMPACT ASSESSMENT ROMA ENERGY MOUNT ROPER PV PLANT ON FARM 321 NEAR KURUMAN, NORTHERN CAPE PROVINCE | Archaeological Specialist Reports | Jonathan Kaplan | Agency for Cultural Resources Management | Enviroafrica CC | 20/06/2017 - 14:54 | ||
Archaeological Impact Assessment - Ilanga CSP 5 | ARCHAEOLOGICAL IMPACT ASSESSMENT REPORT - PROPOSED ESTABLISHMENT OF THE ILANGA CSP 5 PROJECT, NEAR UPINGTON, NORTHERN CAPE PROVINCE | Archaeological Specialist Reports | 13/04/2016 | Jaco van der Walt | Heritage Contracts and Archaeological Consulting | Savannah Environmental (Pty) Ltd | 25/04/2016 - 13:54 | |
AIA-KotuloTsatsiCSP1 | Archaeological Impact Assessment for the Proposed SolarReserve KotuloTsati CSP1 Facility, located close to Kenhardt in the Northern Cape | Archaeological Specialist Reports | 11/08/2015 | Jaco van der Walt | Heritage Contracts and Archaeological Consulting | Savannah Environmental (Pty) Ltd | 04/11/2015 - 08:17 | |
AIA - Gunstfontein SS & PL (Jul16) | Archaeological impact assessment report for the proposed Gunstfontein 132 kV power line, switching station and ancillaries for the proposed Gunstfontein wind energy facility near Sutherland, Northern Cape | Archaeological Specialist Reports | 18/07/2016 | Jaco van der Walt | Heritage Contracts and Archaeological Consulting | Savannah Environmental (Pty) Ltd | 21/07/2016 - 15:08 | |
Rondevly Mining Right: Phase 1 Heritage Impact Assessment (HIA) | PHASE 1 HERITAGE IMPACT ASSESSMENT (HIA) FOR THE PROPOSED MINING PERMIT ON A PORTION OF PORTION 6 AND A PORTION OF PORTION 8 OF RONDEVLY 208 IR | Archaeological Specialist Reports | 23/09/2019 | Leonie Marais | 02/05/2019 - 08:31 | |||
Schoonbee Archaeological Impact Assessment | ARCHAEOLOGICAL IMPACT ASSESSMENT (AIA) OF AREAS DEMARACTED FOR THE PROPOSED SCHOONBEE SOLAR FARM AND 22KV POWER LINE PROJECT ON PORTION 4 OF THE FARM BLAAUWILDEBEESTFONTEIN 16JS, GROBLERSDAL, GREATER SEKHUKHUNE DISTRICT MUNICIPALITY, LIMPOPO PROVINCE | Archaeological Specialist Reports | 05/08/2015 | Nelius Kruger | 08/10/2015 - 12:06 | |||
Impofu-Ngwedi HIA | Impofu-Ngwedi 132kV line Heritage Impact Assessment | Archaeological Specialist Reports | 30/09/2015 | Anton van Vollenhoven | Archaetnos CC | Texture Environmental Consultants | 23/11/2015 - 19:06 | |
GPR Review - Nyeleti | UNIVEN Gate 3 - GPR Review Report | Archaeological Specialist Reports | 25/09/2023 | 26/09/2023 - 14:21 | ||||
AIA - Ilanga CSP 3 - Jun16 | AIA for the proposed establishment of the Ilanga CSP 3 project, near Upington, NC Province | Archaeological Specialist Reports | 20/06/2016 | Jaco van der Walt | Heritage Contracts and Archaeological Consulting | Savannah Environmental (Pty) Ltd | 27/06/2016 - 11:05 | |
Ngululu Heritage and Paleontological reports | Heritage and paleontological specialist reports for the proposed Ngululu coal mine, Delmas, Mpumalanga | Archaeological Specialist Reports | Dr. Heidi Fourie | Dr Heidi Fourie | Dr Heidi Fourie | 06/02/2015 - 12:31 | ||
REPORT ON DATING ASK1 ENGRAVINGS | Archaeological Specialist Reports | 10/11/2015 | 10/11/2015 - 12:23 | |||||
Archaeological Assessment - Final EIR | Archaeological Specialist Reports | 30/04/2016 | Jaco van der Walt | Heritage Contracts and Archaeological Consulting | Savannah Environmental (Pty) Ltd | 25/10/2016 - 08:58 | ||
Archaeological Report for Loeriesfontein 1 WEF | Power line route options, access road and substation positions for the for proposed power line options for the Loeriesfontein 1 wind & Loeriesfontein 3 solar energy facility at sous and aan de karee doorn pan, north of Loeriesfontein, Northern Cape province | Archaeological Specialist Reports | 31/01/2013 | David Morris | McGregor Museum | 04/03/2013 - 10:06 | ||
ARCHAEOLOGICAL IMPACT ASSESSMENT SPECIALIST STUDY REPORT FOR THE PROPOSED NEW METEOR SUBSTATION | PHASE 1 ARCHAEOLOGICAL IMPACT ASSESSMENT SPECIALIST STUDY REPORT FOR THE PROPOSED NEW METEOR SUBSTATION AND ASSOCIATED 88KV POWERLINES IN SEBOKENG TOWNSHIP OF EMFULENI LOCAL MUNICIPALITY WITHIN SEDIBENG DISTRICT MUNICIPALITY. GAUTENG PROVINCE. | Archaeological Specialist Reports | 16/06/2014 | Munyadziwa Magoma | Vhubvo Archaeo-Heritage Consultants | Vhubvo Archaeo-Heritage Consultants | 17/10/2014 - 16:21 | |
ArchWalkThrough-Nxuba | Archaeological Walkthough Survey of the Final Optimised Layout of the Authorised Nxuba Wind Farm near Cookhouse, Blue Crane Route, | Archaeological Specialist Reports | 15/07/2015 | Johan Binneman | Eastern Cape Heritage Consultants | Savannah Environmental (Pty) Ltd | 15/12/2015 - 14:00 | |
ASR - NoupoortCSP 29.03.16 | Archaeological Scoping Report Proposed Construction Of The 150mw Noupoort Concentrated Solar Power (CSP) Project Northern Cape Province | Archaeological Specialist Reports | 29/03/2016 | Jaco van der Walt | Heritage Contracts and Archaeological Consulting | Savannah Environmental (Pty) Ltd | 30/06/2016 - 15:47 | |
DU PLESSIS DAM PV1 PRE-CON SURVEY | PRE-CONSTRUCTION ARCHAEOLOGICAL SURVEY: PROPOSED DU PLESSIS DAM PV1 SOLAR ENERGY FACILITY AND ASSOCIATED POWER LINE, NORTHERN CAPE | Archaeological Specialist Reports | 13/12/2021 | Jayson Orton | ASHA Consulting(Pty) Ltd | Landscape Dynamics - Cape Town | 15/01/2022 - 10:06 | |
AIA Report - Oryx | Archaeological Impact Assessment report for the Oryx Solar Energy Facility | Archaeological Specialist Reports | 30/08/2013 | Jaco van der Walt | Heritage Contracts and Archaeological Consulting | Savannah Environmental (Pty) Ltd | 23/10/2013 - 16:20 | |
ARCHAEOLOGICAL IMPACT ASSESSMENT | ENVIRONMENTAL IMPACT ASSESSMENT FOR PROPOSED EXTENSION OF TORMIN MINE, WEST COAST, SOUTH AFRICA: ARCHAEOLOGICAL IMPACT ASSESSMENT | Archaeological Specialist Reports | 01/05/2018 | Dave Halkett | ACO Associates CC | 20/09/2018 - 09:20 | ||
UTRECHT LOW COST HOUSING PROJECT | PHASE 1 ARCHAEOLOGICAL AND HERITAGE IMPACT ASSESSMENT SPECIALIST STUDY REPORT FOR PROPOSED 'UTRECHT LOW COST' HOUSING PROJECT ERF 1176,EMADLANGENI LOCAL MUNICIPALITY,KWAZULU NATAL PROVINCE | Archaeological Specialist Reports | 01/05/2013 | McEdward Murimbika | Nzumbululo Heritage Solutions | Ugu District Municipality | 04/06/2013 - 11:29 | |
KotuloTsatsi CSP2 - Heritage | Archaeological Impact Assessment for the Proposed SolarReserve Kotulo Tsati Energy CSP2, located close to Kenhardt in the Northern Cape Province | Archaeological Specialist Reports | 08/05/2015 | Jaco van der Walt | Heritage Contracts and Archaeological Consulting | Savannah Environmental (Pty) Ltd | 27/10/2015 - 11:41 | |
Palmietfontein_Ventersdorp_AIA_Revised+desktop | Palmietfontein_Ventersdorp_AIA_Revised+desktop | Archaeological Specialist Reports | 22/02/2020 | Tobias Coetzee | 28/02/2020 - 11:05 | |||
Hloba heritage report | The proposed forestry projects by D.T. Hloba (15ha) in respect of the same activity occurring in several locations in Stranger’s Rest farm in UMzimkhulu local Municipality within Sisonke District of Kwazulu Natal Province | Archaeological Specialist Reports | 21/02/2014 | Gavin Whitelaw | KwaZulu-Natal Amafa and Research Institute | Shasa Heritage Consultants CC | CTS_157225 | 21/02/2014 - 12:28 |
Archaeological Impact Assessment | Archaeological Impact Assessment for Okhahlamba Local Municipality Landfill Site Near Bergville, KwaZulu Natal | Archaeological Specialist Reports | 17/12/2014 | Jaco van der Walt | Pravin Amar Development Planners (PADP) | Pravin Amar Development Planners (PADP) | 12/03/2015 - 17:19 | |
Archaeological Impact Assessment Proposed Low Cost Housing Project in Kakamas, Northern Cape | Archaeological Impact Assessment Proposed Low Cost Housing Project in Kakamas, Northern Cape | Archaeological Specialist Reports | 28/02/2013 | Jonathan Kaplan | Agency for Cultural Resources Management | Enviroafrica CC | 07/06/2013 - 09:02 | |
Survey of Wilde Varkens Valey 48 | A First Phase Archaeological Survey of Wilde Varkens Valey 48 | Archaeological Specialist Reports | 01/08/1992 | University of Cape Town | Willem Buhrmann Associates | 08/04/2021 - 12:45 | ||
ASR-LethaboSolar | Archaeological Scoping Report for the Proposed Establishment of the Lethabo Solar PV Facility, Mpumalanga Province | Archaeological Specialist Reports | 28/11/2014 | Jaco van der Walt | Heritage Contracts and Archaeological Consulting | Savannah Environmental (Pty) Ltd | 17/03/2015 - 14:25 | |
Heritage Survey | Heritage Impact Assessment | Archaeological Specialist Reports | 14/03/2018 | 05/09/2018 - 12:32 | ||||
Mahoebe Archaeological Impact Assessment | MAHOEBE EIENDOMME: PROPOSED 2MW PHOTOVOLTAIC POWER PLANT DEVELOPMENT ON A PORTION OF THE FARM DE HOEK 32, PIXLEY KA SEME DISTRICT MUNICIPALITY, NORTHERN CAPE PROVINCE | Archaeological Specialist Reports | 28/09/2015 | Nelius Kruger | Exigo Sustainability | EOH | 08/10/2015 - 16:02 | |
Kitso Mine graves rehabilitation status report | Archaeological Specialist Reports | Edward Matenga | (AHSA) Archaeological and Heritage Services Africa (Pty) Ltd | 27/09/2022 - 10:53 | ||||
Senekal 1 - AIA | Archaeological Impact Assessment for the Proposed Senekal 1 5MW Solar Energy Facility near Mkuze, Kwazulu Natal | Archaeological Specialist Reports | 14/07/2014 | Jaco van der Walt | Heritage Contracts and Archaeological Consulting | Savannah Environmental (Pty) Ltd | 05/08/2014 - 12:42 | |
Archaeological Impact Assessment | Proposed Impofu East Wind Farm, Kouga Local Municipality, Sarah Baartman Ditrict Municipality, Eastern Province | Archaeological Specialist Reports | 22/06/2018 | Peter Nilssen | 10/10/2018 - 13:37 | |||
Bestwood Estates January 2014 | Rectification and/or Regularisations of activities relating to the Bestwood Township development near Kathu, Northern Cape: Phase 1 Archaeological Impact Assessment | Archaeological Specialist Reports | 01/02/2014 | David Morris | Archaeology department, McGreggor Museum | Jeffares & Green - Cape Town | 14/02/2014 - 10:08 | |
Heritage Phase 1 - Astral Organic Composting Facility | Astral Operations - Bronkhorstspruit - Phase 1 Heritage | Archaeological Specialist Reports | 01/03/2021 | 28/05/2021 - 10:13 | ||||
Drainage Rehabilitation, Jukskei River, Gauteng | Drainage Rehabilitation, Jukskei River, Gauteng - Heritage Screener | Archaeological Specialist Reports | 26/01/2016 | Mariagrazia Galimberti, Kyla Bluff | CTS Heritage | Envirolution Consulting (Pty) Ltd | 26/01/2016 - 18:04 |