THIS IS THE ARCHIVE FOR SAHRIS 1.0
THIS SITE IS NOW AN ARCHIVE AND IS NOT SUITABLE FOR MAKING APPLICATIONS
Please be aware that no content and application creation or changes to information on this version of SAHRIS will be retained.
To make applications or utilise SAHRIS for the creation of information, please use the new site:
https://sahris.org.za
Changes to SAHRIS!
The South African Heritage Resources Information System (SAHRIS) has undergone a generational upgrade and restructure. These changes to the site include, but are not limited to:
- A new & modernised look and layout
- Improved site usage flows with respect to applications and content creation
- Improved site performance and stability
Launch for the new version of SAHRIS occurred on Monday the 30th of October 2023.
The new site can be found here:
SAHRIS | SAHRIS
Displaying 51 - 100 of 18975
ReportRef | ReportTitle | ReportType | ReportDate | Authors | AuthoringBody | CommissioningCompany | Post date |
---|---|---|---|---|---|---|---|
Archaelogical and HIA - Tiergerpoort Lodge and Wedding Venue | Phase 1 Archaeological and Heritage Impact Assessment on the Remainder of Portion 186 of the farm Tiegerpoort 371 JR in respect of a proposed hospitality development, City of Tshwane, Gauteng Province. | HIA Phase 1 | 06/11/2018 | Jean-Pierre Celliers | Kudzala Antiquity | 28/11/2018 - 09:20 | |
Palaeontological Impact Assessment for the proposed Eskom Ararat-Bafokeng 88 kV powerline | Palaeontological Impact Assessment for the proposed Eskom Ararat-Bafokeng 88 kV powerline, Distribution Gemma Cluster, Northwest Province | PIA Desktop | 31/08/2021 | Marion Bamford | Prof Marion Bamford | HUMBA ENVIRONMENTAL CONSULTANCY | 29/11/2021 - 11:22 |
Ngqura 16 Mtpa Heritage Reports | Phase 1 Heritage Impact Assessment Kimberley to De Aar | HIA Phase 1 | 10/10/2012 | Elize Becker | Hatch | 19/10/2012 - 13:01 | |
132kv John Dube HIA Report | Phase1 Heritage Impact Assessment Report for proposed 132kv ±4km powerline for John Dube Ext 1 Development within City of Ekurhuleni Metropolitan Municipality, Gauteng | Heritage Impact Assessment Specialist Reports | 13/11/2018 | Trust Mlilo | Integrated Specialist Services (Pty) Ltd | 06/03/2019 - 11:11 | |
Heritage Crime: Zindzi Mandela, Sterkfontein Tweet, 13 June 2019, Sterkfontein, COHWHS, a UNESCO World Heritage Site | Heritage Crime: Zindzi Mandela, Sterkfontein Tweet, 13 June 2019, Sterkfontein, COHWHS, a UNESCO World Heritage Site | 24/08/2020 - 21:40 | |||||
Klipdrift Shelter 2018 excavation report | Report on the 2018 archaeological excavations at Klipdrift Shelter, southern Cape, South Africa – 18 February to 2 April 2018 | Archaeological Specialist Reports | 12/12/2021 | Christopher Henshilwood, Karen van Niekerk, Samantha Mienies, Jenny Maccali | Centre for Early Sapiens Behaviour University of Bergen, Norway | Centre for Early Sapiens Behaviour University of Bergen, Norway | 01/03/2022 - 09:27 |
PHASE 1 HIA PLOT 2386 KAKAMAS-SOUTH NORTHERN CAPE | PHASE 1 HERITAGE IMPACT ASSESSMENT FOR THE PROPOSED AGRICULTURAL DEVELOPMENT PLOT 2386, (PORTION OF PLOT 2189), KAKAMAS-SOUTH SETTLEMENT, KAI !GARIB LOCAL MUNICIPALITY, ZF MGCAWU DISTRICT MUNICIPALITY, NORTHERN CAPE PROVINCE. | HIA Phase 1 | Heidi Fivaz, Jan Engelbrecht, Elize Butler | UBIQUE HERITAGE CONSULTANTS | ECO Balance Planning Co | 28/09/2023 - 13:22 | |
HIA Melkspruit Rouxville | THE PROPOSED DEVELOPMENT OF THE ESKOM MELKSPRUIT TO ROUXVILLE 132 KV OVERHEADPOWERLINE, FREE STATE PROVINCE Heritage Impact Assessment PGS Heritage, 2020 | HIA Phase 1 | 30/09/2020 | Wouter Fourie | PGS Heritage (Pty) Ltd | GA Environment (Pty) Ltd | 20/10/2020 - 08:13 |
Varkenslaagte - PIA | 27/02/2023 - 10:49 | ||||||
BORROW PITS LERATONG THABA NCHU | LETTER OF RECOMMENDATION FOR THE EXEMPTION FROM A FIRST PHASE ARCHAEOLOGICAL & HERITAGE INVESTIGATION OF THE PROPOSED BORROW PIT DEVELOPMENTS AT LERATONG 835, THABA NCHU, FREE STATE | HIA Letter of Exemption | 26/10/2013 | Cobus Dreyer | Raubex Construction (Pty) Ltd. | 16/01/2014 - 21:52 | |
CULTURAL HERITAGE IMPACT ASSESSMENT DONE FOR PROPOSED QUARRIES ON THE FARM HARRIET’S WISH 393 LR | A REPORT ON A CULTURAL HERITAGE IMPACT ASSESSMENT DONE FOR PROPOSED QUARRIES ON THE FARM HARRIET’S WISH 393 LR, PORTIONS 12 AND 13, FORMING PART OF THE PLATINUM GROUP METALS WATERBERG PROSPECTING AREA, LIMPOPO PROVINCE | Heritage Impact Assessment Specialist Reports | 28/09/2022 | Prof. Anton van Vollenhoven | Archaetnos CC | 26/04/2023 - 09:53 | |
Draft BAR and EMPr | Draft Basic Assessment report and Environmental Management report regarding Matsulu Waste Transfer Station, in City of Mbombela Local Municipality, Mpumalanga Province | HIA Phase 1 | 27/09/2017 | Babalwa Fatyi | Myezo Environmental Management Services | Mbombela Local Municipality | 13/11/2017 - 12:59 |
RBM end 2004 | The archaeological survey of the Zulti North and Tisand mining lease areas | AIA Phase 1 | 01/12/2004 | Gavin Anderson | Umlando: Archaeological Surveys & Heritage Management | Richards Bay Minerals | 02/07/2015 - 11:45 |
AIA[P2.1]-Neotel, Kathu, NC - Final report - Archaeological Monitoring, Area 1 | AIA[P2.1]-Neotel, Kathu, NC - Interim report - Archaeological Monitoring, Area 1 | 08/08/2016 | Karen Van Ryneveld | Enviroworks | 08/08/2016 - 07:43 | ||
Isondlo Dairy Irrigation Project Palaeontological Report | Palaeontological Impact Assessment for the proposed Isondlo Dairy CBAR (irrigation project), near Bergville, KwaZulu Natal Province | PIA Desktop | 20/01/2018 | Marion Bamford | GCS Water and Environmental Consultants - Durban | 13/02/2018 - 13:28 | |
Archaeological Impact Assessment - Draft EIA Buffels 2 | 31/08/2016 | Jaco van der Walt | Heritage Contracts and Archaeological Consulting | Savannah Environmental (Pty) Ltd | 26/09/2016 - 13:32 | ||
NALEDI SEWER HIA | Phase 1 Cultural Heritage Impact Assessment: THE REPLACEMENT OF A SEWER PIPELINE IN NALEDI, GREATER SOWETO REGION, CITY OF JOHANNESBURG METROPOLITAN MUNICIPALITY, GAUTENG PROVINCE | Heritage Impact Assessment Specialist Reports | 15/05/2019 | J.A. van Schalkwyk | 30/05/2019 - 10:06 | ||
PALAEONTOLOGICAL DESKTOP ASSESSMENT | PALAEONTOLOGICAL DESKTOP ASSESSMENT for THE PROSPECTING RIGHT APPLICATION FOR DIAMONDS ALLUVIAL ON THE FARM AANSLUIT 250, REGISTRATION DIVISION: HOPETOWN, NORTHERN CAPE PROVINCE | PIA Desktop | 11/05/2022 | Elize Butler | Banzai Environmental (Pty) Ltd | 03/05/2022 - 14:54 | |
HIA_Eyethu Kromdraai Coal Mine | A Report on a Heritage Impact Assessment (HIA) for the proposed Eyethu Kromdraai Coal Mine close to Delmas, Mpumalanga | HIA Phase 1 | 01/07/2012 | Anton van Vollenhoven | Archaetnos CC | Geovicon Environmental (Pty) Limited | 29/04/2013 - 12:03 |
PIA-Lowlands Hydropower and Distribution, near Cradock, CHDM, EC | PIA-Lowlands Hydropower and Distribution, near Cradock, CHDM, EC | PIA Phase 1 | 22/12/2020 | Elize Butler | 22/12/2020 - 08:51 | ||
ARCHAEOLOGICAL DESKTOP STUDY | ARCHAEOLOGICAL DESKTOP STUDY for the Proposed Tsebeblox Prospecting Right Application on Portion 25 and the Remaining Extent of the Farm Bankpan 225 IS and Portion 1 and the Remaining Extent of the Farm Killowen 465 IS, Bethal, Mpumalanga | AIA Desktop | 30/05/2022 | Tobias Coetzee | Tobias Coetzee | 04/07/2022 - 14:26 | |
B.J Mbanjwa | The proposed Eucalyptus forestry projects by B.J Mbanjwa occurring in Roodewal 209 farms in UMzimkhulu local Municipality within Sisonke District of Kwazulu Natal Province. | HIA Phase 1 | 08/08/2013 | Gavin Whitelaw | KwaZulu-Natal Amafa and Research Institute | Shasa Heritage Consultants CC | 11/04/2014 - 15:27 |
Heritage Impact Assessment for the the proposed Nseleni Independent Floating Power Plant (NIFPP) and associated infrastructure, Port of Richards Bay, Kwazulu-Natal | Heritage Impact Assessment for the the proposed Nseleni Independent Floating Power Plant (NIFPP) and associated infrastructure, Port of Richards Bay, Kwazulu-Natal | HIA Phase 1 | 08/02/2021 | Jaco van der Walt | Heritage Contracts and Archaeological Consulting | SE Solutions | 04/03/2021 - 22:12 |
HIA: Ruspoort 1 PV | HERITAGE IMPACT ASSESSMENT In terms of Section 38(8) of the NHRA for the PROPOSED RUSPOORT 1 SOLAR PV FACILITY NEAR PETRUSVILLE, DE AAR & PHILLIPSTOWN IN THE NORTHERN CAPE | HIA Phase 1 | 24/04/2023 | Jenna Lavin, Nicholas Wiltshire, Kimberley Chapelle | CTS Heritage | Savannah Environmental (Pty) Ltd | 05/06/2023 - 10:44 |
THE PROPOSED EMERALD VALLEY ESTATE, RIETVALLEIRAND EXTENSION 80 | Phase 1 Cultural Heritage Impact Assessment: THE PROPOSED EMERALD VALLEY ESTATE, RIETVALLEIRAND EXTENSION 80, HOLDING 72, WATERKLOOF AGRICULTURAL HOLDINGS, CITY OF TSHWANE METROPOLITAN MUNICIPALITY, GAUTENG PROVINCE | HIA Phase 1 | 22/02/2017 | Johnny Van Schalkwyk | J Paul van Wyk | JA van Schalkwyk Heritage Consultant | 23/02/2017 - 09:39 |
Heritage Impact Assessment for Phenyane to Obhazweni Road | Heritage Impact Assessment of the proposed ward 15 Phenyane to Obhazweni Road, Nongoma Municipality in northern KwaZulu-Natal | Heritage Impact Assessment Specialist Reports | 24/06/2014 | Frans Prins | Active Heritage CC | Nongoma Local Municipality | 28/06/2014 - 22:53 |
HIA of LIA stone walled settlements on Taurus Plantation | A PHASE 1 ARCHAEOLOGICAL AND HERITAGE IMPACT ASSESSMENT OF THE STONE WALLED SETTLEMENTS ON TAURUS PLANTATION, BARBERTON DISTRICT, MPUMALANGA PROVINCE | AIA Phase 1 | 11/08/2015 | Christine Van Wyk Rowe | Adansonia Heritage Consultants | York Timbers | 11/08/2015 - 20:26 |
AIA_Karoo_Renewable_Energy_Booth_C_Nov10 | An Archaeological Desktop Study for the proposed Karoo Renewable Energy Facility on a site south of Vicoria West, Northern and Western Cape | AIA Desktop | 19/11/2010 | Celeste Booth, Natasha Higgitt | Albany Museum | 16/06/2012 - 14:46 | |
Schoonbee Archaeological Impact Assessment | ARCHAEOLOGICAL IMPACT ASSESSMENT (AIA) OF AREAS DEMARACTED FOR THE PROPOSED SCHOONBEE SOLAR FARM AND 22KV POWER LINE PROJECT ON PORTION 4 OF THE FARM BLAAUWILDEBEESTFONTEIN 16JS, GROBLERSDAL, GREATER SEKHUKHUNE DISTRICT MUNICIPALITY, LIMPOPO PROVINCE | Archaeological Specialist Reports | 05/08/2015 | Nelius Kruger | 08/10/2015 - 12:06 | ||
HERITAGE SCOPING ASSESSMENT FOR THE PROPOSED LC DE VILLIERS CULVERT UPGRADE PROJECT, PRETORIA, GAUTENG PROVINCE | HERITAGE SCOPING ASSESSMENT FOR THE PROPOSED LC DE VILLIERS CULVERT UPGRADE PROJECT ON THE REMAINDER OF PORTION 0 OF THE FARM KOEDOESPOORT 456 JR, PRETORIA, TSHWANE MUNICIPAL AREA, GAUTENG PROVINCE | HIA Letter of Exemption | 15/09/2016 | Neels Kruger | Exigo Sustainability | Exigo Sustainability | 09/11/2016 - 15:48 |
HIA; Expansion of Existing Borrow Pit, DR01380, Cape Winelands | Heritage Impact Assessment for Expansion of an Existing Borrow Pit Located Along DR01380 Approximately 18 km southeast of Worcester in Cape Winelands District Municipality, Western Cape | HIA Phase 1 | 29/08/2012 | Quahnita Samie, John Almond, Madelon Tusenius | Vidamemoria Heritage Consultants | Nadeson Consulting Services | 12/06/2018 - 12:55 |
Palaeontological Impact Assessment: Desktop study | PIA Desktop | 20/08/2015 | Barry Millsteed | BM Geological Services | Jacana Environmental cc | 29/08/2019 - 14:55 | |
HIA_Gemsbok Horn Prospect | Heritage Impact Assessment of proposed prospecting drilling sites at two pans on Gemsbok Horn 242 in the Dawid Kruiper Local Municipality, Northern Cape | HIA Phase 1 | 01/11/2019 | David Morris | McGregor Museum | Site Plan Consulting | 25/11/2019 - 10:56 |
JAW7146_G292_Alexander_PIA | Sasol South Africa (Pty) Ltd. Alexander Mining Project. Palaeontological Impact Assessment: Phase 1 Field Study | PIA Phase 1 | 30/01/2019 | Dr. Heidi Fourie | Die Erfenisstigting, Jones & Wagener Engineering and Environmental Consultants | 26/08/2022 - 10:25 | |
HIA 10857MP | HERITAGE IMPACT ASSESSMENT: PROPOSED QUARTZ MINE ON KABIS 27/REM, NAMAKWALAND MAGISTERIAL DISTRICT, NORTHERN CAPE | HIA Phase 1 | 20/02/2021 | Jayson Orton | ASHA Consulting(Pty) Ltd | ASHA Consulting(Pty) Ltd | 05/05/2021 - 13:12 |
Final Plans for Founders Estates FE 9 | 29/09/2022 | Studio Mas | Boschendal (Pty) Ltd | 20/10/2022 - 11:10 | |||
Paleo letter exemption Siviti Lodge | Request for Exemption of any Palaeontological Impact Assessment for the proposed Siviti River Lodge and crossings on Farm Guernsey 81, between Acornhoek and Timbavati, Limpopo Province | Palaeontological Specialist Reports | 14/04/2022 | Marion Bamford | Prof Marion Bamford | Eco8 Environmental Planners | 18/07/2023 - 11:45 |
2ND DRAFT REPORT ON A HERITAGE IMPACT ASSESSMENT PROCESS FOR PROPOSED RESIDENTIAL DEVELOPMENT ON ERVEN 1483, 1299 AND THE REMAINING EXTENT OF ERF 453, IN ARCADIA, PRETORIA | 2ND DRAFT REPORT ON A HERITAGE IMPACT ASSESSMENT PROCESS FOR PROPOSED RESIDENTIAL DEVELOPMENT ON ERVEN 1483, 1299 AND THE REMAINING EXTENT OF ERF 453, IN ARCADIA, PRETORIA GAUTENG PROVINCE APAC013/13 | HIA Phase 1 | 01/02/2013 | Anton Pelser | A Pelser Archaeological Consulting | Urban Nest | 05/08/2013 - 08:20 |
REPORT ON A PHASE 1 HERITAGE ASSESSMENT | REPORT ON A PHASE 1 HERITAGE ASSESSMENT FOR THE OVERHEAD POWERLINE AND ZETA SUBSTATION, LOCATED ON ERF 1806 VAN DER HOFF PARK & PORTION 17 OF THE FARM VYFHOEK 424IQ POTCHEFSTROOM, NORTHWEST PROVINCE - APAC017/26. April 2017 | HIA Phase 1 | 01/04/2017 | Anton Pelser | APELSER ARCHAEOLOGICAL CONSULTING | AB Enviro Consult CC | 11/04/2017 - 09:37 |
HIA Mookodi - Ganyesa | BASIC HERITAGE ASSESSMENT FOR THE PROPOSED MOOKODI 132KV PHASE 2 POWER LINES DEVELOPMENT, NORTH WEST PROVINCE | Heritage Impact Assessment Specialist Reports | 31/08/2014 | Johnny Van Schalkwyk | Sivest - Gauteng | 25/09/2014 - 13:16 | |
Calodex Solar PV Palaeontological Report | Palaeontological Impact Assessment for the Proposed Establishment of a 115 MW Solar Photovoltaic (PV) Facility in Springs, Gauteng | PIA Phase 1 | 06/05/2021 | Dr. Heidi Fourie | 25/06/2021 - 15:23 | ||
MSix Wits Application | Basic Assessment Report | 26/06/2017 | Ephraim Masibhera | Kweneng Group | Kweneng Group | 31/05/2017 - 14:37 | |
Maritime Heritage Aspects for relocation of Eassy cable | Maritime Heritage Aspects for relocation of Eassy Submarine cable, Mtunzini | 20/01/2015 | African Centre for Heritage Activities | E&D Consulting Services cc | 20/01/2015 - 11:55 | ||
Tshisimane Campus | A REPORT ON A HERITAGE IMPACT ASSESSMENT FOR THE UPGRADE OF VARIOUS BUILDINGS AT VHEMBE FURTHER EDUCATION AND TRAINING COLLEGE/ CAMPUSES, LIMPOPO PROVINCE | AIA Phase 1 | 04/12/2015 | Anton van Vollenhoven | Archaetnos CC | MSW | 04/12/2015 - 08:02 |
Proposed Extension of Ilima Mining Operation | PROPOSED EXTENSION OF THE MINING OPERATIONS AT THE EXISTING ILIMA COLLIERY (OLD PEMBANI COLLIERY), NEAR CAROLINA, ALBERT LUTHULI LOCAL MUNICIPALITY, GERT SIBANDE DISTRICT MUNICIPALITY, MPUMALANGA PROVINCE | HIA Phase 1 | 14/09/2017 | Jessica Angel | PGS Heritage (Pty) Ltd | Ilima Coal Company (Pty) Ltd | 14/08/2018 - 15:02 |
HIA Proposed Tawana Hotazel Mine | A Report on a Heritage Impact Assessment for the Proposed Tawana Hotazel Mine, Hotazel, Northern Cape Province | HIA Phase 1 | 21/04/2021 | Anton van Vollenhoven, Johan Smit | Archaetnos Culture & Cultural Resource Consultants | Prime Resources (Pty) Ltd | 06/09/2021 - 14:10 |
Anref Phase 1 heritage impact assessment | Magozastad report final COMPRESSED revised | HIA Phase 1 | 01/10/2015 | Sidney Miller | African Heritage Consultants CC | Shangoni Management Services | 02/11/2018 - 10:18 |
Proposed new aboveground Diesel Depot on Plot 1/42 Estoire | Exemption from Phase 1 Heritage Impact Assessment: Proposed new aboveground Diesel Depot on Plot 1/42 Estoire, Bloemfontein Free State Province. | HIA Letter of Exemption | 12/03/2020 | Lloyd Rossouw | 17/03/2020 - 11:17 | ||
HIA Report Sutherland & Rietrug WEF Grid Infrastructure | HERITAGE IMPACT ASSESSMENT: PROPOSED 33KV/132KV SUBSTATION, 132KV POWERLINE WITH A 132KV SWITCHING STATION AND ASSOCIATED INFRASTRUCTURE FOR THE SUTHERLAND AND RIETRUG WIND ENERGY FACILITIES, SUTHERLAND MAGISTERIAL DISTRICT, NORTHERN CAPE | Heritage Impact Assessment Specialist Reports | 04/11/2021 | Jayson Orton | ASHA Consulting(Pty) Ltd | 15/11/2021 - 08:26 | |
HIA Kwartelspan PV 1 | Proposed Kwartelspan PV Power Station I and Associated Infrastructure, Pixley ka Seme District Municipality, Northern Cape Province | HIA Phase 1 | 02/07/2012 | Peter Nilssen | Van Zyl Environmental Consultants | 30/08/2012 - 10:30 |