FindReports

THIS IS THE ARCHIVE FOR SAHRIS 1.0


THIS SITE IS NOW AN ARCHIVE AND IS NOT SUITABLE FOR MAKING APPLICATIONS

Please be aware that no content and application creation or changes to information on this version of SAHRIS will be retained.

To make applications or utilise SAHRIS for the creation of information, please use the new site:

https://sahris.org.za

Changes to SAHRIS!

The South African Heritage Resources Information System (SAHRIS) has undergone a generational upgrade and restructure. These changes to the site include, but are not limited to:

  • A new & modernised look and layout
  • Improved site usage flows with respect to applications and content creation
  • Improved site performance and stability

Launch for the new version of SAHRIS occurred on Monday the 30th of October 2023.

The new site can be found here:

SAHRIS | SAHRIS

Advanced options
ReportRef ReportTitle ReportType ReportDate Authors AuthoringBody CommissioningCompany Post date
Exemption Letter - Naroogna Salt Mine Exemption Letter - Naroogna Salt Mine HIA Letter of Exemption 29/01/2016 Jonathan Kaplan Agency for Cultural Resources Management United Salt 08/02/2016 - 08:27
Tshepiso Primary School Development School development Archaeological Specialist Reports 10/07/2017 Siegwalt Udo Kusel African Heritage Consultants CC African Heritage Consultants CC 17/07/2017 - 11:14
Palaeontological Impact Assessment - Lethabo 24/03/2016 - 16:30
PHASE 1 HIA REPORT RHENOSTERKOP 452JR REPORT ON A PHASE 1 HERITAGE IMPACT ASSESSMENT FOR THE RHENOSTERKOP PROSPECTING RIGHTS APPLICATION ON THE FARM RHENOSTERKOP 452JR, 24 KM NORTH-EAST OF BRONKHORSTSPRUIT, TSHWANE EAST MUNICIPAL DISTRICT AIA Phase 1 10/09/2018 Anton Pelser A Pelser Archaeological Consulting Red Kite Environmental Solutions (Pty) Ltd 27/09/2018 - 11:41
HIA for the Proposed Upgrade of the Dingukwazi High School, KZN Heritage Impact Assessment for the Proposed Upgrade of the Dingukwazi High School, near Pongola town at Kwalubisi area in the uPhongolo Local Municipality, Zululand District of the KwaZulu–Natal Province. HIA Phase 1 29/11/2018 Stephan Gaigher G&A Heritage Management Consultants Kujenga Trading Pty Ltd t/a Kujenga Consulting 09/01/2019 - 14:36
Heritage Screener: Kamaggas Prospecting DESKTOP HERITAGE SCREENING ASSESSMENT FOR THE PROPOSED PROSPECTING RIGHT FOR THE PROSPECTING OF HEAVY MINERALS SANDS AND RARE EARTH ELEMENTS NEAR KLEINZEE ON A PORTION ON THE REMAINING EXTENT OF PORTION 5 OF THE FARM KAMAGGAS 200, REGISTRATION DIVISION: IP, NORTHERN CAPE PROVINCE Heritage Scoping 29/06/2020 Jenna Lavin CTS Heritage PHS Consulting 29/06/2020 - 14:43
Thakadu SPP PIA 07/01/2022 - 08:29
Penhoek Pass N6-4 Archaeology PENHOEK PAS - UPGRADE OF THE N6- 4 [KM52- KM66.2], BETWEEN QUEENSTOWN AND JAMESTOWN, EASTERN CAPE, SOUTH AFRICA AIA Phase 1 30/04/2012 Karen Van Ryneveld ArchaeoMaps Archaeological Consultancy GIBB Engineering & Science - Port Elizabeth 24/07/2012 - 14:28
Ganyesa HIA Heritage impact assessment for the PROPOSED GANYESA WILD SILK PROJECT, VRYBURG REGION, NORTH-WEST PROVINCE Heritage Scoping 16/03/2012 Johnny Van Schalkwyk North West - Department of Economic Development, Environment, Conservation and Tourism 15/10/2013 - 11:43
VISUAL IMPACT ASSESSMENT HOTAZEL SOLAR AMENDMENT ENVIRONMENTAL IMPACT ASSESSMENT FOR THE AMENDMENT TO THE AUTHORISED HOTAZEL SOLAR, NORTHERN CAPE SPECIALIST REPORT:VISUAL IMPACT ASSESSMENT Draft 2: May 2020 Visual Impact Assessment 01/05/2020 Stephen Stead Visual Resource Management Africa cc Cape Environmental Assessment Practitioners 14/09/2020 - 15:43
HIA Report For EA for High-level Bridge and Culvert on D1724 PHASE 1 HERITAGE IMPACT ASSESSMENT REPORT APPLICATION FOR ENVIRONMENTAL AUTHORISATION THE PROPOSED CONSTRUCTION OF A HIGH-LEVEL BRIDGE AND CULVERT OVER THE VUNGU RIVER, ON ROAD D1724, KWACEZA, KZN Heritage Impact Assessment Specialist Reports Roy Muroyi Tsimba Archaeological Footprints (Pty) Ltd Hanslab (Pty) Ltd 23/01/2023 - 12:49
Unilever Alterations Proposed Internal Alterations to an existing Building 09/12/2013 Andrea Mary van Dam 09/12/2013 - 15:41
HIA_Kora Solar PV Cluster Proposed development of the Kora Solar PV Cluster near Postmasburg in the Northern Cape HIA Phase 1 03/08/2023 Jenna Lavin Jones & Wagener Engineering and Environmental Consultants 18/10/2023 - 13:50
Ga-Rankuwa Unit 23 Stand 1719 and Unit 25 Stand 1427 PHASE 1 ARCHAEOLOGICAL AND HERITAGE IMPACT ASSESSMENT FOR PROPOSED GA RANKUWA UNIT 23 STAND 1719 AND UNIT 25 NUMBER 1427 RESIDENTIAL DEVELOPMENT PROJECT IN THE CITY OF TSHWANE METROPOLITAN MUNICIPALITY IN THE GAUTENG PROVINCE AIA Phase 1 13/12/2022 Trust Mlilo Integrated Specialist Services (Pty) Ltd Setala Environmental 15/03/2023 - 10:42
AIA FarmEttrick 182, Hopetown District Northern Cape Cultural Resources Management Impact Assessment: (Portions of) Ettrick 182, Hopetown District, Northern Cape, South Africa AIA Phase 1 31/10/2005 Karen Van Ryneveld Basadi Ba Tlou Supply Chain Solutions CC 14/05/2015 - 12:33
Proposed croplands for berry cultivation at Kruger Berries near Tzaneen, Limpopo Phase 1 Heritage resources scoping report: Proposed croplands for berry cultivation near Tzaneen, Limpopo HIA Phase 1 12/05/2015 Frans Roodt Shasa Heritage Consultants CC Polygon Environmental Planning CC 15/09/2017 - 16:04
Sendawo PV 1 Heritage Report 75MW SOLAR PHOTOVOLTAIC (PV) ENERGY FACILITY – SENDAWO SOLAR 1 Heritage Impact Assessment Heritage Impact Assessment Specialist Reports 26/05/2016 Wouter Fourie PGS Heritage and Grave Relocation Consultants Sivest - Gauteng 09/06/2016 - 11:32
Heritage report 2017 ILIMA COLLIERY: PROPOSED EXTENSION OF THE MINING OPERATIONS AT THE EXISTING ILIMA COLLIERY (OLD PEMBANI COLLIERY), NEAR CAROLINA, ALBERT LUTHULI LOCAL MUNICIPALITY, GERT SIBANDE DISTRICT MUNICIPALITY, MPUMALANGA PROVINCE HIA Phase 1 PGS Heritage (Pty) Ltd 28/11/2017 - 12:47
Jan Smut Park Heritage Report Jan Smut Park Heritage Impact Assessment HIA Phase 1 01/02/2019 Johnny van Schalkwyk 02/04/2019 - 11:39
1480 HIA MULILO STRUISBULT PV2 GRID CONNECTION CLOSE TO COPPERTON, NORTHERN CAPE PROVINCE Heritage Impact Assessment Specialist Reports 17/01/2022 Wouter Fourie PGS Heritage (Pty) Ltd Environmental Impact Management Services (Pty) Ltd 18/03/2022 - 09:18
Application for exemption from an AIA for the proposed Morehill Gold Dump prospecting APPLICATION FOR EXEMPTION FROM AN ARCHAEOLOGICAL IMPACT ASSESSMENT FOR THE PROPOSED MOREHILL GOLD DUMP PROSPECTING, BENONI, GAUTENG PROVINCE Jaco van der Walt 22/11/2012 - 13:55
Jagersfontein Heritage Impact Assessment Phase I Impact Assessment of the Dormant Jagersfontein Mine (Free State) in terms of the Archaeological and Other Heritage Sites HIA Phase 1 31/03/2009 Loudine Philip National Museum Bloemfontein - Archaeology and Anthropology De Beers Considated Mines 25/06/2019 - 16:31
Eshowe WWTW and Sewage Reticulation Heritage Scoping Report Upgrade of the Waste-Water Treatment Works and Sewage Reticulation in Eshowe Mlalazi Local Municipality, King Cetshwayo DM, KwaZulu-Natal. Heritage Scoping 11/10/2020 Len van Schalkwyk eThembeni Cultural Heritage Exigent Environmental 06/11/2020 - 17:21
Heritage Screening Impact Assessment Karusa BESS Appendix F Heritage Screening Impact Assessment 23/05/2022 Jenna Lavin CTS Heritage Savannah Environmental (Pty) Ltd 23/05/2022 - 16:02
Extension of Cemetery Alheit Assessment for the proposed extension and operation of a cemetery on portion 1409, Alheit Kakamas AIA Phase 1 26/02/2013 Cobus Dreyer Stabilis Development (Pty) Ltd 26/02/2013 - 11:34
Hlongoane Shopping Centre Proposed Development of a Shopping Centre on Portion 1 of the Farm Kroonstad 468 LR, west of Marken in the Mogalakwena Local Municipality, Waterberg District, Limpopo Province HIA Phase 1 23/01/2014 Marko Hutten PGS Heritage and Grave Relocation Consultants Tekplan Environmental 04/03/2014 - 20:02
Palaeontological Impact Assessment: Bismarck Dam, Pipeline and Orchards Makhado Local Municipality, Vhembe District Municipality, Limpopo Province. Palaeontological Impact Assessment: Phase 1 Field Study: Bismarck Dam, Pipeline and Orchards Makhado Local Municipality, Vhembe District Municipality, Limpopo Province. PIA Phase 1 28/09/2020 Dr. Heidi Fourie Dr Heidi Fourie AGES (PTY) Ltd - Limpopo 27/01/2021 - 13:30
120 KENNETH KAUNDA DEMOLITION PERMIT Heritage Study 10/05/2023 Manoj Ishwarlall SHRAVAN PROJECTS CC SHRAVAN PROJECTS CC 11/05/2023 - 15:51
Boshoek Smelter Phase I Base Line Heritage study for the proposed Glencore Merafe Venture Operation - Boshoek Operations near Boshoek in the North-West Province of South Africa HIA Phase 1 06/05/2014 Julius CC Pistorius JMA Consulting (Pty) Ltd 06/05/2014 - 15:34
Kloofsig 3 AIA Archaeological Impact Assessment of the proposed Kloofsig 1 Solar PV Energy Facility on the remainder of the Farm Kalkpoort 18, Petrusville area, REsnosterberg Local Municipality, Northern Cape. Archaeological Specialist Reports 24/10/2016 Madelon Tusenius Natura Viva CC SRK Consulting (South Africa) (Pty) Ltd - PLZ 13/01/2017 - 11:36
Phase 1 PIA Naudesbank Phase 1 PIA Naudesbank Final Draft PIA Phase 1 30/05/2023 Dr Heidi Fourie 19/06/2023 - 12:12
Enamandla PV 1 Heritage Specialist Study HERITAGE IMPACT ASSESSMENT: PROPOSED CONSTRUCTION OF ENAMANDLA PV 1 SOLAR FACILITY ON THE REMAINING EXTENT OF THE FARM HARTEBEEST VLEI 86, NEAR AGGENEYS, NORTHERN CAPE HIA Phase 1 10/01/2017 Lita Webley ACO Associates CC WSP Environmental Pty Ltd - Johannesburg 13/03/2017 - 09:31
Vaalbank Heritage Report PHASE 1 ARCHAEOLOGICAL IMPACT ASSESSMENT For The Proposed Diep Vaalbank Coal Project Between Hendrina and Bethal, Mpumalanga AIA Phase 1 12/02/2018 Tobias Coetzee Tobias Coetzee Ecoelementum Environmental and Engineering (Pty) Ltd 09/03/2018 - 11:13
PIA[P1]-SANRAL: Upgrade of the R63, Section 13, Fort Beaufort to Alice, Nkonkobe Local Municipality, Eastern Cape Palaeontological Heritage Assessment: Combined Desktop and Field-Based Study. Proposed Upgrade of National Route R63, Section 13, and Associated Mining Applications from Fort Beaufort (km 35,77) to Alice (km 58,86), Eastern Cape PIA Phase 1 22/10/2016 John Almond EOH Coastal & Environmental Services (CES) - East London 22/10/2016 - 11:21
De Beers Demolition Works HIA Heritage Impact Assessment Kleinzee Mining Area, Heritage Management Plan for the Mining Structures within the Kleinzee Mining Rights Area, Kleinzee, Northern Cape Province Heritage Impact Assessment Specialist Reports 07/03/2018 Stephan Gaigher South African Heritage Resources Agency De Beers Consolidated Mines (Pty) Ltd 16/05/2018 - 10:36
PROPOSED 400KV POWER LINE FROM ARIADNE SUBSTATION TO VENUS SUBSTATION ARCHAEOLOGICAL AND CULTURAL HERITAGE PHASE I EMP WALK DOWN SPECIALIST REPORT FOR THE PROPOSED 400KV POWER LINE FROM ARIADNE SUBSTATION TO VENUS SUBSTATION WITHIN UTHUKELA AND UMGUNGUNDLOVU DISTRICT MUNICIPALITY OF KWAZULU NATAL PROVINCE. AIA Phase 1 01/10/2014 KwaZulu-Natal Amafa and Research Institute KwaZulu-Natal Amafa and Research Institute 01/12/2016 - 09:36
Hartebeesthoek East HIA Heritage Impact Assessment Specialist Reports John Gribble ACO Associates CC Arcus Consulting 27/09/2019 - 14:15
PHASE 1 ARCHAEOLOGICAL AND HERITAGE IMPACT ASSESSMENT PHASE 1 ARCHAEOLOGICAL AND HERITAGE IMPACT ASSESSMENT REPORT FOR THE PROPOSED UPGRADING OF WATER PIPELINES IN EMBALENHLE GOVANI MBEKI LOCAL MUNICIPALITY, MPUMALANGA PROVINCE AIA Phase 1 06/06/2022 Trust Mlilo Integrated Specialist Services (Pty) Ltd Govan Mbeki Local Municipality 19/07/2022 - 21:59
HIA Tutwa PV Heritage Impact Assessment Report - Basic Assessment Phase: Proposed Establishment of the Tutwa Solar Energy Facility Located West of Upington on a Portion 4 of the Farm Narries 7, Northern Cape Province HIA Phase 1 07/05/2012 Stephan Gaigher G & A Heritage Savannah Environmental (Pty) Ltd 14/06/2012 - 10:05
Report on Archaeological Investigation of the New Extension to the Cango Caves Report on Archaeological Investigation of the New Extension to the Cango Caves AIA Phase 1 01/01/1972 Hilary Deacon, Graham Avery Iziko: South African Museum 16/06/2012 - 14:33
243 Currie Road St Thomas Road Historical Impact Assessment Heritage Impact Assessment Specialist Reports 20/07/2012 Deborah Whelan 241 Currie Road (Pty) Ltd 16/05/2013 - 17:57
Mosplaas ARCHAEOLOGICAL IMPACT ASSESSMENT S24G Application, illegal agricultural development on Mosplaas (Erf 2255, 2149, 1740 & 2125 Kakamas South Settlement), Kai! Garib Municipality, Northern Cape. AIA Phase 1 30/07/2020 Jonathan Kaplan ACRM GroenbergEnviro (Pty) Ltd 18/03/2021 - 11:50
PHASE 1 ARCHAEOLOGICAL IMPACT ASSESSMENT PHASE 1 ARCHAEOLOGICAL IMPACT ASSESSMENT for the Proposed Mafatiki and Kapalpha Solutions Mining Permits on Portions of Portion 12 & 13 of the Farm Aangewys 81 IS, Kriel, Mpumalanga AIA Phase 1 07/09/2022 Tobias Coetzee 12/09/2022 - 13:33
HIA Mathanjana A HERITAGE IMPACT ASSESSMENT STUDY FOR THE PROPOSED PROVISION OF BULK WATER SUPPLY FROM RUST DE WINTER DAM TO MATHANJANA MAGISTERIAL DISTRICT , LIMPOPO/MPUMALANGA PROVINCES, SOUTH AFRICA Nkosinathi Godfrey Tomose Green Gold Consulting 24/07/2014 - 14:31
EIA 446PR - Paleontological Desktop Study PALEONTOLOGICAL DESKTOP ASSESSMENT FOR THE PROSPECTING RIGHT APPLICATION COMBINED WITH A WASTE LICENCE APPLICATION OF AAA MINING CC FOR THE PROSPECTING OF DIAMONDS ALLUVIAL, DIAMONDS IN KIMBERLITE, DIAMONDS GENERAL & DIAMONDS ON THE REMAINING EXTENT OF THE FARM KAMEELDRIFT 285, REGISTRATION DIVISION: HOPETOWN, NORTHERN CAPE PROVINCE. (NC30/5/1/1/2/12632PR) PIA Desktop 26/03/2021 Elize Butler Banzai Environmental (Pty) Ltd Milnex 17/05/2021 - 14:04
Revised Cultural Heritage Management Plan CULTURAL HERITAGE MANAGEMENT PLAN RELATED TO ARCHAEOLOGICAL & HISTORICAL SITES RECORDED DURING PHASE 1 HIA’S FOR THE DEVELOPMENT OF A 300MW SOLAR PHOTOVOLTAIC (PV) FACILITY AND ASSOCIATED INFRASTRUCTURE ON SEVERAL PORTIONS OF FARMS IN THE HANOVER DISTRICT, EMTHANJENI LOCAL MUNICIPALITY, PIXLEY KA SEME DISTRICT MUNICIPALITY, NORTHERN CAPE PROVINCE FOR SOVENTIX SA (rights sold to SolarAfrica Energy (Pty) Ltd, Project Hereafter referred to as Sun Central). Conservation Management Plan 31/07/2023 Anton Pelser APELSER ARCHAEOLOGICAL CONSULTING APELSER ARCHAEOLOGICAL CONSULTING 08/08/2023 - 11:32
Bokpoort pipeline new alignment Archaeological Impact Assessment - ACWA Power Solafrica Bokpoort CSP Power Plant (PTY) LTD: Amended Alignment: Bokpoort Water Pipeline, Groblershoop, Northern Cape. AIA Phase 1 01/08/2014 David Morris Archaeology department, McGreggor Museum ACWA Power Solafrica Bokpoort CSP Power Plant (Pty) Ltd 23/10/2014 - 13:44
Goedetrouw, Ketting subs and 132kV lines Heritage Impact Assessment Heritage Impact Assessment Specialist Reports 31/08/2015 Anton van Vollenhoven Archaetnos CC Texture Environmental Consultants 03/11/2015 - 14:13
Rezoning ERF 8898/506 APPLICATION IN TERMS OF SECTION 2 OF THE SPATIAL PLANNING AND LANDUSE MANAGEMENT ACT, 2013, FOR THE REZONING OF ERF 8898, PORTION OF ERF 506, VRYBURG. 12/07/2016 Emendo Town and Regional Planning Emendo Town and Regional Planning Emendo Town and Regional Planning 02/05/2017 - 15:56
HIA Netherby Farm FIRST PHASE CULTURAL HERITAGE IMPACT ASSESSMENT OF THE PROPOSED ESTABLISHMENT OF A 700 000 m³ DAM ON SUB 6 OF THE FARM ELANDSHOEK NO. 1024, BOSTON, KWAZULU-NATAL HIA Phase 1 01/11/2014 Frans Prins Active Heritage CC Green Door Environmental 04/01/2016 - 11:51

Pages

CSV
 
 

Search form