FindReports

THIS IS THE ARCHIVE FOR SAHRIS 1.0


THIS SITE IS NOW AN ARCHIVE AND IS NOT SUITABLE FOR MAKING APPLICATIONS

Please be aware that no content and application creation or changes to information on this version of SAHRIS will be retained.

To make applications or utilise SAHRIS for the creation of information, please use the new site:

https://sahris.org.za

Changes to SAHRIS!

The South African Heritage Resources Information System (SAHRIS) has undergone a generational upgrade and restructure. These changes to the site include, but are not limited to:

  • A new & modernised look and layout
  • Improved site usage flows with respect to applications and content creation
  • Improved site performance and stability

Launch for the new version of SAHRIS occurred on Monday the 30th of October 2023.

The new site can be found here:

SAHRIS | SAHRIS

Advanced options
ReportRef ReportTitle ReportType ReportDatesort descending Authors AuthoringBody CommissioningCompany Post date
Lafarge Nelspruit Quarry Heritage Report BASIC HIA REPORT FOR THE PROPOSED ADDENDUM TO THE EXISTING NELSPRUIT QUARRY ON THE REMAINING EXTENT OF THE FARM KIA ORA 139-JU IN NELSPRUIT, CITY OF MBOMBELA LOCAL MUNICIPALITY, MPUMALANGA EMP (MP/30/5/1/2/2/117 MR) HIA Phase 1 19/02/2019 Anton Pelser A Pelser Archaeological Consulting 19/02/2019 - 08:57
Jagersfontein Prospecting Right Phase 1 HIA Phase 1 Heritage Impact Assessment Report - Desktop and field based Heritage Impact Assessment for the prospecting right application for the Remainder, Portion 1 and 16 of the farm Jagersfontein 14, Xhariep District, Free State. HIA Phase 1 21/02/2019 Stephan Gaigher G&A Heritage Management Consultants G&A Heritage Management Consultants 26/02/2019 - 13:06
Demolishing of old concrete bridge Phase 2 Cultural Heritage Documentation: THE PROPOSED DEMOLISHING OF AN OLD CONCRETE ROAD BRIDGE ACROSS THE MBOKOTWANA RIVER, N2 NATIONAL ROAD, TSOLO, EASTERN CAPE PROVINCE HIA Phase 2 21/02/2019 Johnny van Schalkwyk SANRAL Chameleon Environmental 11/03/2019 - 15:32
PDA for the Westrand Strengthening Project II Palaeontological Desktop Assessment (DIA) to assess the proposed Westrand Strengthening Project Phase II PIA Desktop 22/02/2019 Elize Butler Banzai Environmental (Pty) Ltd PGS Heritage (Pty) Ltd 25/06/2020 - 19:58
Heritage Exemption - Kriel PS Lime Plant 22.02.19 Exemption from a Heritage Impact Study: Kriel Power Station Lime PLan Upgrade Project, Kriel, Emalahleni Local Municipality, Mpumalanga Province Heritage Impact Assessment Specialist Reports 22/02/2019 Andrew Salomon PGS Heritage (Pty) Ltd Savannah Environmental (Pty) Ltd 28/02/2019 - 15:13
HIA - Richards Bay CCPP - Feb'19 Heritage Impact Assessment for the Proposed Richards Bay Combined Cycle Power Plant (CCPP) and Associated Infrastructure on a Site Near Richards Bay, Kwazulu-Natal Province Heritage Impact Assessment Specialist Reports 22/02/2019 Jaco van der Walt Heritage Contracts and Archaeological Consulting Savannah Environmental (Pty) Ltd 20/03/2019 - 17:37
Heritage Impact Assessment at Kriel Power Station REQUEST FOR EXEMPTION FROM A HERITAGE IMPACT STUDY: KRIEL POWER STATION LIME PLANT UPGRADE PROJECT, KRIEL, EMALAHLENI LOCAL MUNICIPALITY, MPUMALANGA PROVINCE. Heritage Impact Assessment Specialist Reports 22/02/2019 Ilan Smeyatsky PGS Heritage (Pty) Ltd 02/04/2019 - 15:22
Heritage Report 376HIA_Savannah_Kriel Power Station Exemption Letter_20190222_v0.1 HIA Letter of Exemption 22/02/2019 IIan Smeyatsky Savannah Environmental (Pty) Ltd PGS Heritage (Pty) Ltd 22/08/2019 - 12:30
PIA Palaeontological Impact Assessment: Phase 1 Field Study :THE PROPOSED RONDEBULT OUTFALL SEWER LINE. PIA Phase 1 22/02/2019 Dr. Heidi Fourie 20/04/2022 - 15:41
HIA Exemption Report 376HIA_Savannah_Kriel Power Station Exemption Letter_20190222_v0.1 Heritage Impact Assessment Specialist Reports 22/02/2019 IIan Smeyatsky Savannah Environmental (Pty) Ltd PGS Heritage (Pty) Ltd 22/08/2019 - 14:01
umdloti sands HERITAGE SURVEY OF THE UMDLOTI SANDS DEVELOPMENT, UMDLOTI, KWAZULU-NATAL HIA Phase 1 22/02/2019 Gavin Anderson Umlando: Archaeological Surveys & Heritage Management Triplo4 Sustainable Solutions (Pty) Ltd 04/03/2019 - 15:18
HIA Exemption Report 376HIA_Savannah_Kriel Power Station Exemption Letter_20190222_v0.1 Heritage Impact Assessment Specialist Reports 22/02/2019 IIan Smeyatsky Savannah Environmental (Pty) Ltd PGS Heritage (Pty) Ltd 22/08/2019 - 14:08
PHASE 1 HIA REPORT FOR A PROPOSED FILLING STATION (RIETVLEI EXTENSION 6) PHASE 1 HIA REPORT FOR A PROPOSED FILLING STATION (RIETVLEI EXTENSION 6) ON THE REMAININNG PORTION OF PORTION 1 OF THE FARM WITKOPPIES 393JR EAST OF THE RIETVLEIDAM NATURE RESERVE, CITY OF TSHWANE, GAUTENG - APAC019/17 HIA Phase 1 23/02/2019 Anton Pelser APELSER ARCHAEOLOGICAL CONSULTING Bokamoso Environmental Consultants 27/02/2019 - 13:05
Heritage Impact Assessment for Pioneer Minerals (Pty) Ltd. PHASE 1 HERITAGE IMPACT ASSESSMENT (INCLUDING PALAEONTOLOGICAL ASSESSMENT) REQUESTED ITO SECTION 34 OF THE NATIONAL HERITAGE RESOURCES ACT 25/1999 FOR THE PROPOSED MINE PROSPECTING ON A PORTION OF THE REMAINING EXTENT OF THE FARM REMHOOGTE 153, PRIESKA, NORTHERN CAPE. HIA Phase 1 24/02/2019 Edward Matenga Archaeological and Heritage Services Africa (Pty) Ltd Archaeological and Heritage Services Africa (Pty) Ltd 02/07/2019 - 10:33
Palaeontological Impact Assessment Palaeontological Impact Assessment for proposed prospecting rights application for Remhoogte 152 RE near Prieska, Northern Cape PIA Desktop 24/02/2019 Marion Bamford Prof Marion Bamford Prof Marion Bamford 02/07/2019 - 10:46
Heritage Impact Assessment for Pioneer Minerals PHASE 1 HERITAGE IMPACT ASSESSMENT (INCLUDING PALAEONTOLOGICAL ASSESSMENT) REQUESTED IN TERMS OF SECTION 38 OF THE NATIONAL HERITAGE RESOURCES ACT 25/1999 FOR THE PROPOSED MINE PROSPECTING ON A PORTION OF THE REMAINING EXTENT OF THE FARM REMHOOGTE 152 PRIESKA, NORTHERN CAPE. HIA Phase 1 24/02/2019 Edward Matenga Archaeological and Heritage Services Africa (Pty) Ltd Archaeological and Heritage Services Africa (Pty) Ltd 02/07/2019 - 10:51
PIA - Lichtenburg PVs 25.02.19 Palaeontological Impact Assessment for Three Proposed PV Projects near Lichtenburg, North West Province Palaeontological Specialist Reports 25/02/2019 Marion Bamford Prof Marion Bamford CTS Heritage 28/02/2019 - 14:11
AIA Bospoort 558 ARCHAEOLOGICAL IMPACT ASSESSMENT (AIA) OF DEMARACTED AREAS ON A PORTION OF THE REMAINDER OF THE FARM BOSPOORT 558 FOR THE PROPOSED BOSPOORT SAND MINE PROJECT IN THE FEZILE DABI DISTRICT MUNICIPALITY, FREE STATE PROVINCE AIA Phase 1 25/02/2019 Nelius Kruger Exigo3 Sustainability LW Consultatns 14/03/2019 - 12:59
Comment for PIA - Lichtenburg PVs 25.02.19 Final Comment PIA for three proposed PV projects near Lichtenburg, Northwest Province 25/02/2019 Marion Bamford Prof Marion Bamford 28/02/2019 - 14:13
HIA Gunstfontein Heritage Specialist Comment Letteerr Heritage Impact Assessment Specialist Reports 25/02/2019 CTS Heritage Savannah Environmental (Pty) Ltd 09/05/2019 - 15:11
HIA Gunstfontein WEF Heritage Specialist Comment Letter Letter Heritage Impact Assessment Specialist Reports 25/02/2019 CTS Heritage Savannah Environmental (Pty) Ltd 09/05/2019 - 16:08
PIA Caledonian Paleontological Impact Assessment for the refurbishments of the Caledonian Stadium in Pretoria, Gauteng Province. Palaeontological Specialist Reports 26/02/2019 Marion Bamford 05/06/2019 - 10:32
HIA - Allepad PV Four (Feb'19) Heritage Impact Assessment for the Proposed Development of Allepad PV Four, a solar PV facility and associated infrastructure on a site near Upington, in the Northern Cape Province Heritage Impact Assessment Specialist Reports 26/02/2019 Jenna Lavin CTS Heritage Savannah Environmental (Pty) Ltd 27/02/2019 - 11:17
HIA - Allepad PV Two (Feb'19) Heritage Impact Assessment for the Proposed Development of Allepad PV Two, a solar PV facility and associated infrastructure on a site near Upington, in the Northern Cape Province Heritage Impact Assessment Specialist Reports 26/02/2019 Jenna Lavin CTS Heritage Savannah Environmental (Pty) Ltd 27/02/2019 - 11:17
Heritage - Witberg WEF Amendment_Feb'19 Witberg WEF Amendment Heritage Impact Assessment Specialist Reports 26/02/2019 Tim Hart ACO Associates CC Savannah Environmental (Pty) Ltd 19/03/2019 - 16:49
HIA - Allepad PV One (Feb'19) Heritage Impact Assessment for the Proposed Development of Allepad PV One, a solar PV facility and associated infrastructure on a site near Upington, in the Northern Cape Province Heritage Impact Assessment Specialist Reports 26/02/2019 Jenna Lavin CTS Heritage Savannah Environmental (Pty) Ltd 27/02/2019 - 11:17
HIA - Allepad PV Three (Feb'19) Heritage Impact Assessment for the Proposed Development of Allepad PV Three, a solar PV facility and associated infrastructure on a site near Upington, in the Northern Cape Province Heritage Impact Assessment Specialist Reports 26/02/2019 Jenna Lavin CTS Heritage Savannah Environmental (Pty) Ltd 27/02/2019 - 11:18
HIA for the Proposed Refurbishment Actions at MacBeef Abattoir and Feedlot Heritage Impact Assessment for the Proposed Refurbishment Actions at Mac Beef Abattoir and Feedlot located on the Farm Leeukuil 691- LS Portions 70, 85, 86, 87, 114, 122 & 123 in the Polokwane Local Municipality, Capricorn District of the Limpopo Province. HIA Phase 1 27/02/2019 Stephan Gaigher G&A Heritage Management Consultants Tekplan Environmental 05/03/2019 - 12:24
Waterloo mitigation final permit report FINAL ARCHAEOLOGICAL MITIGATION REPORT, WATERLOO 992-IN: VRYBURG, NORTHWEST PROVINCE Archaeological Permit Report 27/02/2019 Jayson Orton ASHA Consulting(Pty) Ltd 04/03/2019 - 10:53
Algoa Bay ADZ Maritime AIA MARITIME ARCHAEOLOGICAL IMPACT ASSESSMENT OF PROPOSED AQUACULTURE AREAS 1, 6 AND 7, ALGOA BAY, EASTERN CAPE PROVINCE AIA Desktop 28/02/2019 John Gribble ACO Associates CC Anchor Research & Monitoring (Pty) Ltd 02/04/2019 - 08:43
Swartberg Heritage Assessment HERITAGE IMPACT ASSESSMENT FOR THE PROPOSED EXTENSION OF SWARTBERG MINE ON BLACK MOUNTAIN MINE, AGGENEYS, NORTHERN CAPE PROVINCE Heritage Impact Assessment Specialist Reports 28/02/2019 David Morris, Abenicia Henderson, Jani Archaeology department, McGreggor Museum 05/06/2019 - 15:17
HERITAGE IMPACT ASSESSMENT Proposed Grid Connection Infrastructure (GCI) on Konkoonsies 91/2/rem, 91/5, 91/6 and Scuit Klip 92/1 near Pofadder, in the Khaî-Ma Local Municipality.SAHRA Case No: 12583. Required under Section 38 (8) of the National Heritage Resources Act (No. 25 of 1999). Heritage Impact Assessment Specialist Reports 28/02/2019 Jayson Orton ASHA Consulting(Pty) Ltd GAEA ENVIRO PTY LTD 04/03/2019 - 10:15
HERITAGE IMPACT ASSESSMENT HERITAGE IMPACT ASSESSMENT: Proposed Grid Connection Infrastructure (GCI) on Konkoonsies 91/2/rem, 91/5, 91/6 and Scuit Klip 92/1 near Pofadder, in the Khaî-Ma Local Municipality HIA Phase 1 28/02/2019 Jayson Orton ASHA Consulting(Pty) Ltd GAEA ENVIRO PTY LTD 04/03/2019 - 11:09
BAR for Bothaville NE Ext A BASIC ASSESSMENT REPORT FOR THE AMENDMENT OF AN EXISTING PROSPECTING RIGHT AND ENVIRONMENTAL AUTHORISATION FOR BOTHAVILLE NE EXT A, SITUATED IN THE FREE STATE PROVINCE Heritage Impact Assessment Specialist Reports 28/02/2019 Kuni Mosweu Shango Solutions 07/11/2019 - 14:26
Driefontein Water Supply Scheme-Excelsior Driefontein Water Supply Scheme 28/02/2019 13/03/2019 - 08:45
HIA Witberg Proposed Witberg Wind Energy Facility Amendment 2018 Supplementary assessment of the proposed amendments. (Assessment conducted under Section 38 (8) of the National Heritage Resources Act (No. 25 of 1999) as part of an EIA) Heritage Impact Assessment Specialist Reports 28/02/2019 Tim Hart ACO Associates CC Savannah Environmental (Pty) Ltd 03/05/2019 - 16:05
PHASE I ARCHAEOLOGICAL AND CULTURAL HERITAGE IMPACT ASSESSMENT FOR THE PROPOSED CONSTRUCTION OF APPROXIMATELY 170KM 1 X 400KV POWERLINE PHASE I ARCHAEOLOGICAL AND CULTURAL HERITAGE IMPACT ASSESSMENT SPECIALIST REPORT FOR THE PROPOSED CONSTRUCTION OF APPROXIMATELY 170KM 1 X 400KV POWERLINE FROM MAPHUTHA SUBSTATION TO WITKOP SUBSTATION WITHIN THE SEKHUKHUNE AND CAPRICON DISTRICT MUNICIPALITIES OF LIMPOPO PROVINCE HIA Phase 1 28/02/2019 Munyadziwa Magoma Vhubvo Archaeo-Heritage Consultants Nsovo Environmental Consulting 09/02/2018 - 12:25
BRMO - New Railway Bridge Heritage Report A REPORT ON A HERITAGE IMPACT ASSESSMENT FOR THE PROPOSED NEW RAILWAY BRIDGE AT THE BLACK ROCK MINING OPERATIONS, CLOSE TO HOTAZEL, NORTHERN CAPE PROVINCE. Heritage Impact Assessment Specialist Reports 01/03/2019 Anton van Vollenhoven Archaetnos Culture & Cultural Resource Consultants Assmang Black Rock Mining Operations 30/05/2019 - 12:12
BRMO - New Railway Exemption Letter LETTER FOR HIA EXEMPTION REQUEST: PROPOSED ASSSSMANG BLACK ROCK MINING OPERATIONS (BRMO) ALTERATIONS TO THE RAILWAY TRACK BETWEEN GLORIA MINE AND HOTAZEL, NORTHERN CAPE PROVINCE HIA Letter of Exemption 01/03/2019 Anton van Vollenhoven Archaetnos Culture & Cultural Resource Consultants Assmang Black Rock Mining Operations 30/05/2019 - 12:14
BRMO - New Railway Bridge Heritage Report A REPORT ON A HERITAGE IMPACT ASSESSMENT FOR THE PROPOSED NEW RAILWAY BRIDGE AT THE BLACK ROCK MINING OPERATIONS, CLOSE TO HOTAZEL, NORTHERN CAPE PROVINCE. Heritage Impact Assessment Specialist Reports 01/03/2019 Anton van Vollenhoven Archaetnos Culture & Cultural Resource Consultants Assmang Black Rock Mining Operations 30/05/2019 - 12:16
NID FOR A RESIDENTIAL TOWNSHIP ON PORTION 437 AND PORTION 502 OF THE FARM ROOSBOOM 1102GS, ALFRED DUMA LOCAL MUNICIPALITY, KWAZULU-NATAL PROVINCE NOTIFICATION OF INTENT TO DEVELOP FOR A RESIDENTIAL TOWNSHIP ON PORTION 437 AND PORTION 502 OF THE FARM ROOSBOOM 1102GS, ALFRED DUMA LOCAL MUNICIPALITY, KWAZULU-NATAL PROVINCE Heritage Impact Assessment Specialist Reports 01/03/2019 Jaco van der Walt Heritage Contracts and Archaeological Consulting Eco Assessments 20/03/2019 - 09:11
Heritage Report for Augrabies Agricultural Development Phase 1 Heritage Impact Assessment Report, Farm Orange Fall no 16 Agricultural Development, Augrabies, Northern Cape Province HIA Phase 1 01/03/2019 11/06/2019 - 09:23
Heritage Report Augrabies Agricultural Project Phase 1 Heritage Impact Assessment Report, Farm Orange Fall no 16 Agricultural Development, Augrabies, Northern Cape Province HIA Phase 1 01/03/2019 11/06/2019 - 09:27
2 Seam (Pty) Ltd PHASE 1 HIA REPORT FOR THE PROPOSED VLAKLAAGTE BLOCK 6 OPEN PIT AREA LOCATED ON THE FARM LOURENS 472IS NEAR KRIEL IN THE PROVINCE OF MPUMALANGA Heritage Impact Assessment Specialist Reports 01/03/2019 Anton Pelser APELSER ARCHAEOLOGICAL CONSULTING 2 Seam (Pty) Ltd 03/06/2019 - 10:59
Heritage Impact Assessment Report, Farm Orange Fall Phase 1 Heritage Impact Assessment Report, Farm Orange Fall no 16 Agricultural Development, Augrabies, Northern Cape Province, March 2019 HIA Phase 1 01/03/2019 11/06/2019 - 10:44
ON PORTION 488 OF LYDENBURG TOWNLANDS 31JT, IN LYDENBURG ON PORTION 488 OF LYDENBURG TOWNLANDS 31JT, IN LYDENBURG HIA Phase 1 01/03/2019 Anton Pelser APELSER ARCHAEOLOGICAL CONSULTING Philo Environmental Management 06/02/2020 - 10:33
BRMO - New Railway Bridge Heritage Report A REPORT ON A HERITAGE IMPACT ASSESSMENT FOR THE PROPOSED NEW RAILWAY BRIDGE AT THE BLACK ROCK MINING OPERATIONS, CLOSE TO HOTAZEL, NORTHERN CAPE PROVINCE. Heritage Impact Assessment Specialist Reports 01/03/2019 Anton van Vollenhoven Archaetnos Culture & Cultural Resource Consultants Assmang Black Rock Mining Operations 30/05/2019 - 11:59
BRMO - New Railway Exemption Letter LETTER FOR HIA EXEMPTION REQUEST: PROPOSED ASSSSMANG BLACK ROCK MINING OPERATIONS (BRMO) ALTERATIONS TO THE RAILWAY TRACK BETWEEN GLORIA MINE AND HOTAZEL, NORTHERN CAPE PROVINCE HIA Letter of Exemption 01/03/2019 Anton van Vollenhoven Archaetnos Culture & Cultural Resource Consultants Assmang Black Rock Mining Operations 30/05/2019 - 12:02
BRMO - PALAEONTOLOGICAL Exemption Letter PALAEONTOLOGICAL DESKTOP ASSESSMENT FOR THE PROPOSED NEW RAILWAY BRIDGE, AND RAIL LINE BETWEEN HOTAZEL AND THE GLORIA MINE, NORTHERN CAPE PROVINCE. HIA Letter of Exemption 01/03/2019 Anton van Vollenhoven Archaetnos Culture & Cultural Resource Consultants Assmang Black Rock Mining Operations 30/05/2019 - 12:06
HIA for Namas Wind farm HERITAGE IMPACT ASSESSMENT: PROPOSED GRID CONNECTION INFRASTRUCTURE FOR THE NAMAS WIND FARM, NAMAKWALAND MAGISTERIAL DISTRICT, NORTHERN CAPE Heritage Impact Assessment Specialist Reports 02/03/2019 Jayson Orton ASHA Consulting(Pty) Ltd Savannah Environmental (Pty) Ltd 28/05/2019 - 16:33

Pages

CSV
 
 

Search form