FindReports

THIS IS THE ARCHIVE FOR SAHRIS 1.0


THIS SITE IS NOW AN ARCHIVE AND IS NOT SUITABLE FOR MAKING APPLICATIONS

Please be aware that no content and application creation or changes to information on this version of SAHRIS will be retained.

To make applications or utilise SAHRIS for the creation of information, please use the new site:

https://sahris.org.za

Changes to SAHRIS!

The South African Heritage Resources Information System (SAHRIS) has undergone a generational upgrade and restructure. These changes to the site include, but are not limited to:

  • A new & modernised look and layout
  • Improved site usage flows with respect to applications and content creation
  • Improved site performance and stability

Launch for the new version of SAHRIS occurred on Monday the 30th of October 2023.

The new site can be found here:

SAHRIS | SAHRIS

Advanced options
ReportRef ReportTitle ReportType ReportDatesort descending Authors AuthoringBody CommissioningCompany Post date
Jan Kempdorp Cemetery Exp PIA PALAEONTOLOGICAL DESKTOP ASSESSMENT OF THE EXPANSION OF THE JAN KEMPDORP CEMETRY ON PORTION 43 OF FARM GULDENSKAT 36-HN, NORTHERN CAPE PROVINCE PIA Desktop 02/05/2019 Elize Butler Banzai Environmental (Pty) Ltd NSVT Consultants 03/03/2020 - 12:13
Eskom Transnet HIA A REPORT ON A HERITAGE IMPACT ASSESSMENT FOR THE ESKOM TRANSNET FREIGHT RAIL PROJECT, LIMPOPO PROVINCE HIA Phase 1 03/05/2019 Prof. Anton van Vollenhoven 22/05/2019 - 13:35
PHASE 1 HIA REPORT FOR A PROPOSED RESIDENTIAL AND MIXED USE TOWNSHIP DEVELOPMENT AND RELATED INFRASTRUCTURE PHASE 1 HIA REPORT FOR A PROPOSED RESIDENTIAL AND MIXED USE TOWNSHIP DEVELOPMENT AND RELATED INFRASTRUCTURE ON VARIOUS PORTIONS OF THE FARMS BOSCHOEK 385IR & BOSCHFONTEIN 386IR NEAR HEIDELBERG IN THE LESEDI LOCAL MUNICIPALITY OF GAUTENG APAC019/45 HIA Phase 1 03/05/2019 Anton Pelser APELSER ARCHAEOLOGICAL CONSULTING AB Enviro Consult CC 22/05/2019 - 19:48
Phase 1 Heritage Assessment: Steraine (Pty) Ltd Exemption from further Archaeological and Palaeontological Impact Assessment: proposed establishment of the 0.8 ha Steraine Chicken Layer and 0.07 ha Packing Facility near Kroonstad, FS Province Heritage Impact Assessment Specialist Reports 03/05/2019 Lloyd Rossouw Environmental Management Group (Pty) Ltd Palaeo Field Services 23/05/2019 - 15:22
Phase 1 Heritage Assessment: Steraine (Pty) Ltd Exemption from further Archaeological and Palaeontological Impact Assessment: proposed establishment of the 0.8 ha Steraine Chicken Layer and 0.07 ha Packing Facility near Kroonstad, FS Province. HIA Phase 1 03/05/2019 Lloyd Rossouw Paleo Field Services Environmental Management Group (Pty) Ltd 24/05/2019 - 11:14
DESKTOP PALAEONTOLOGICAL HERITAGE IMPACT ASSESSMENT REPORT ON THE SITE OF A PROPOSED TOWNSHIP EXPANSION, ON PORTIONS 76 REMAINDER, 77 REMAINDER AND 169 OF THE FARM ZANDFONTEIN 317 JR, NEAR PRETORIA, GAUTENG DESKTOP PALAEONTOLOGICAL HERITAGE IMPACT ASSESSMENT REPORT ON THE SITE OF A PROPOSED TOWNSHIP EXPANSION, ON PORTIONS 76 REMAINDER, 77 REMAINDER AND 169 OF THE FARM ZANDFONTEIN 317 JR, NEAR PRETORIA, GAUTENG PIA Desktop 05/05/2019 Barry Millsteed BM Geological Services Exigent Engineering Consultants 03/07/2019 - 16:39
ASGT PALAEONTOLOGICAL EXEMPTION LETTER PALAEONTOLOGICAL EXEMPTION LETTER OF THE PROPOSED 2.5ML PROCESS WATER RESERVOIR AT GLORIA MINE, BLACK ROCK, HOTAZEL, NORTHERN CAPE HIA Letter of Exemption 05/05/2019 Elize Butler PGS Heritage (Pty) Ltd EScience Associates (Pty) Ltd 05/06/2019 - 12:33
PALAEONTOLOGICAL DESKTOP STUDY Mosikwe PALAEONTOLOGICAL DESKTOP STUDY - Prospecting Rights Application on remaining extent and portion 1 of the Farm Bakhoutrantje 205JP, near Rustenburg, North West Province PIA Desktop 05/05/2019 JF Durand 05/07/2021 - 15:12
Voortrekker Monument Wagon Lager Technical Maintenance Interventions Assessment of the technical maintenance interventions on the structure of the 'walaer' at the Voortrekker Monument, Pretoria Site Inspection Report 06/05/2019 Mauritz Naude Voortrekker Monument 20/05/2019 - 12:43
Indwe Asphalt and Emulsion HIA Phase 1 Heritage Impact Assessment of a proposed new bitumen emulsion plant at an existing gravel quarry near Indwe, EC Province. HIA Phase 1 07/05/2019 Lloyd Rossouw Palaeo Field Services 08/07/2019 - 09:50
Jagersfontein Palaeontological Heritage Study Desktop Palaeontological Heritage Study: Application for Environmental Authorisation for a prospecting right on the Remaining Extent, Portion 1 and Portion 16 of the farm Jagersfontein 14, Fauresmith District, Free State PIA Desktop 07/05/2019 John E. Almond Natura Viva CC Natura Viva CC 07/05/2019 - 13:56
DAG5603 NID Notification of Intent to Develop: Environmental Authorisation for the Dagsoom Coal Mining Project near Ermelo, Mpumalanga Province Heritage Impact Assessment Specialist Reports 09/05/2019 Shannon Hardwick, Justin du Piesanie Digby Wells Environmental Dagsoom Coal Mining (Pty) Ltd 09/05/2019 - 18:25
Pearly Beach AIA Archaeological Impact Assessment in terms of Section 38(8) of the NHRA for a Proposed abalone farm on Erf 385, Pearly Beach, Western Cape AIA Phase 1 09/05/2019 Jonathan Kaplan Agency for Cultural Resources Management 15/09/2019 - 12:56
HIA Report_Phaphama_ Farm Waterkloof 95 Heritage Impact Assessment for the proposed mining rights on the farm Waterkloof 95 located between Griekwastad and Groblershoop in The Pixley Ka Seme District Municipality within the Northern Cape Province Heritage Impact Assessment Specialist Reports 09/05/2019 Cherene de Bruyn NGT ESHS Solutions 21/06/2019 - 11:38
PIA report Phaphama_ Farm Waterkloof 95 PIA for the proposed mining rights on the farm Waterkloof 95 located between Griekwastad and Groblershoop in The Pixley Ka Seme District Municipality within the Northern Cape Province Palaeontological Specialist Reports 09/05/2019 Marion Bamford NGT ESHS Solutions 21/06/2019 - 11:41
AIA FOR THE PROPOSED NIGEL BULK WATER PIPELINE PHASE 2 PROJECT, EKURHULENI METROPOLITAN MUNICIPALITY, GAUTENG PROVINCE ARCHAEOLOGICAL IMPACT ASSESSMENT (AIA) FOR THE PROPOSED NIGEL BULK WATER PIPELINE PHASE 2 PROJECT IN THE NIGEL AREA OF THE EKURHULENI METROPOLITAN MUNICIPALITY, GAUTENG PROVINCE AIA Phase 1 09/05/2019 Neels Kruger Exigo Sustainability Lamela Consulting (Pty) Ltd 20/05/2019 - 08:24
Comment from heritage practitioner Comment from heritage practitioner based on SAHRA's interim comment dated 9 May 2019 10/05/2019 Prof. Anton van Vollenhoven 13/05/2019 - 10:21
BRMO Heritage Management Plan Comprehensive site wide heritage management plan for Black Rock Mining Operations Conservation Management Plan 10/05/2019 Prof. Anton van Vollenhoven Archaetnos Culture & Cultural Resource Consultants Assmang Black Rock Mining Operations 23/05/2019 - 09:00
Mining Permit PIA on Waterfall 133, Northern Cape PALAEONTOLOGICAL DESKTOP ASSESSMENT OF THE PROPOSED DIAMOND PERMIT APPLICATION NEAR KIMBERLEY, SOL PLAATJIES MUNICIPALITY, NORTHERN CAPE PIA Desktop 12/05/2019 Elize Butler Banzai Environmental (Pty) Ltd Thaya Trading Enterprise 29/05/2019 - 10:01
Mining Permit PIA on Waterfall 133, Northern Cape PALAEONTOLOGICAL DESKTOP ASSESSMENT OF THE PROPOSED DIAMOND PERMIT APPLICATION NEAR KIMBERLEY, SOL PLAATJIES MUNICIPALITY, NORTHERN CAPE PIA Desktop 12/05/2019 Elize Butler Banzai Environmental (Pty) Ltd Thaya Trading Enterprise 29/05/2019 - 10:31
FESTIVE KAALFONTEIN HATCHERY MOTIVATION FOR EXEMPTION MOTIVATION FOR EXEMPTION FROM FULL PHASE 1 HERITAGE IMPACT ASSESSMENT FOR THE PROPOSED EXPANSION OF THE FESTIVE KAALFONTEIN HATCHERY FROM 1 617 408 CHICKS PER WEEK (AT FULL CAPACITY AND 80% HATCH RATE) TO 2 515 968 CHICKS PER WEEK (AT FULL CAPACITY AND 80% HATCH RATE) HIA Letter of Exemption 13/05/2019 21/05/2019 - 15:54
Mbilane Access Road Upgrade and Construction, Nquthu DC24/0017/2018 Proposed construction of 3.6 km Mbilane Access Road situated between Mbewunye and Pentsana Location, Ward 8, Nquthu LM, Zululand District DM KwaZulu-Natal. Heritage Scoping 13/05/2019 Len van Schalkwyk eThembeni Cultural Heritage Isolendalo Environmental Consulting 28/05/2019 - 02:00
Mbilane Access Road Upgrade and Construction, Nquthu Heritage Scoping Report Proposed construction of 3.6 km Mbilane Access Road situated between Mbewunye and Pentsana Location, Ward 8, Nquthu LM, Zululand District DM KwaZulu-Natal. Heritage Scoping 13/05/2019 Len van Schalkwyk eThembeni Cultural Heritage Isolendalo Environmental Consulting 28/05/2019 - 02:27
Mantuli Access Road Heritage Report Heritage Scoping Report Proposed construction of 2.7 km Mantuli Access Road in Ward 8, Nquthu LM, Zululand District DM, KwaZulu-Natal. Heritage Scoping 13/05/2019 Len van Schalkwyk eThembeni Cultural Heritage eThembeni Cultural Heritage 31/05/2019 - 14:47
Chansbury Layer Poultry Houses Proposed construction of Layer Poultry Houses, Chansbury Farm, REM of Farm Vaalkranz, No. 140038, Winterton, KwaZulu-Natal HIA Phase 1 13/05/2019 Jean Beater JLB Consulting Sivest - PMB 19/08/2019 - 09:14
Heritage Impact Assessment for Kophia Diamonds Blaauwboschfontein PHASE I HERITAGE IMPACT ASSESSMENT (INCLUDING PALAEONTOLOGICAL ASSESSMENT) REQUESTED IN TERMS OF SECTION 38 OF THE NATIONAL HERITAGE RESOURCES ACT NO 25/1999 FOR A MINING RIGHT ON PORTION 4 OF THE FARM BLAAUWBOSCHFONTEIN 229, BOSHOF DISTRICT, FREE STATE PROVINCE HIA Phase 1 14/05/2019 Edward Matenga Archaeological and Heritage Services Africa (Pty) Ltd 14/05/2019 - 09:58
RECOMMENDED EXEMPTION FROM FURTHER PALAEONTOLOGICAL STUDIES: DESKTOP STUDY RE-LOCATION OF EXISTING EVAPORATION PONDS AND THE CONSTRUCTION OF VINEYARDS ACROSS STREAMS ON PORTION 75 OF FARM KEBOES NO 37 NEAR KEIMOES, KAI! GARIB MUNICIPALITY, NORTHERN CAPE PIA Desktop 14/05/2019 John Almond Natura Viva CC Newgro Farming PTY Ltd 19/05/2019 - 12:41
Heritage Impact Assessment for Kophia Diamonds Blaauwboschfontein PHASE I HERITAGE IMPACT ASSESSMENT (INCLUDING PALAEONTOLOGICAL ASSESSMENT) REQUESTED IN TERMS OF SECTION 38 OF THE NATIONAL HERITAGE RESOURCES ACT NO 25/1999 FOR A MINING RIGHT ON PORTION 4 OF THE FARM BLAAUWBOSCHFONTEIN 229, BOSHOF DISTRICT, FREE STATE PROVINCE HIA Phase 1 14/05/2019 Edward Matenga Archaeological and Heritage Services Africa (Pty) Ltd 14/05/2019 - 09:51
NALEDI SEWER HIA Phase 1 Cultural Heritage Impact Assessment: THE REPLACEMENT OF A SEWER PIPELINE IN NALEDI, GREATER SOWETO REGION, CITY OF JOHANNESBURG METROPOLITAN MUNICIPALITY, GAUTENG PROVINCE Heritage Impact Assessment Specialist Reports 15/05/2019 J.A. van Schalkwyk 30/05/2019 - 10:06
Bushveld Energy HIA PHASE 1 ARCHAEOLOGICAL AND HERITAGE IMPACT ASSESSMENT REPORT FOR PROPOSED BUSHVELD ENERGY HYBRID PV PARK IN MADIBENG LOCAL MUNICIPALITY, NORTH WEST PROVINCE. AIA Phase 1 15/05/2019 Trust Mlilo Integrated Specialist Services (Pty) Ltd Golder Associates Africa (Pty) Ltd 18/02/2020 - 10:22
Gateway fuel station AIA Heritage Impact Assessment (Archaeology) for the proposed Gateway Fuel Station and Convenience Centre, Jan Kempdorp, Northern Cape AIA Phase 1 15/05/2019 David Morris McGregor Museum Onyxia Environmental Management 16/05/2019 - 13:55
FESTIVE KAALFONTEIN HATCHERY PIA DESKTOP The Proposed Expansion of the Kaalfontein Hatchery - Palaeontological Impact Assessment: Desktop Study AIA Desktop 15/05/2019 22/05/2019 - 13:38
Gateway fuel station AIA Heritage Impact Assessment (Archaeology) for the proposed Gateway Fuel Station and Convenience Centre, Jan Kempdorp, Northern Cape AIA Phase 1 15/05/2019 David Morris McGregor Museum Onyxia Environmental Management 16/05/2019 - 15:39
Dannhauser HIA PHASE ONE HERITAGE IMPACT ASSESSMENT OF THE PROPOSED DURNACOL TO DANNHAUSER WATER PROJECT, NEWCASTLE LOCAL MUNICIPALITY, KZN. HIA Phase 1 15/05/2019 Frans Prins Active Heritage CC SLR Consulting (South Africa) (Pty) Ltd 30/08/2019 - 14:10
Proposed Development of the of the Rhino Ridge Tented Camp Proposed Development of the of the Rhino Ridge Tented Camp Mpembeni Community Reserve, Hluhluwe iMfolozi Park Hlabisa Local Municipality, Umkhanyakude DM, KwaZulu-Natal Heritage Scoping 16/05/2019 Len van Schalkwyk eThembeni Cultural Heritage ACER (Africa) Environmental Management Consultants 14/07/2019 - 23:58
PHASE 1 HIA REPORT FOR THE PROPOSED SENWABARWANA MALL PHASE 1 HIA REPORT FOR THE PROPOSED SENWABARWANA MALL DEVELOPMENT ON PORTION 6 OF THE FARM BORKUM 143LS IN SENWABARWANA, LIMPOPO PROVINCE - APAC019/53 HIA Phase 1 20/05/2019 Anton Pelser APELSER ARCHAEOLOGICAL CONSULTING Molshe Business Solutions 28/06/2019 - 12:27
HIA East Coast Gas 400 Kv Power Lines Richards Bay HIA for the proposed East Coast Gas 400 Kv Power Lines, Located In Richards Bay, Within The Umhlathuze Local Municipality In The King Cetshwayo District Municipality, KZN Heritage Impact Assessment Specialist Reports 20/05/2019 Cherene de Bruyn NGT ESHS Solutions 08/07/2019 - 09:40
PIA East Coast Gas 400 Kv Power Lines Richards Bay Palaeontological Impact Assessment for the East Coast Gas 400 KV power line, located in Richards Bay, within the Umhlathuze Local Municipality in the King Cetshwayo District Municipality, Kwazulu-Natal Province Palaeontological Specialist Reports 20/05/2019 Marion Bamford NGT ESHS Solutions 08/07/2019 - 09:46
Obed Nkosi PHASE 1 HIA REPORT FOR A PROPOSED RESIDENTIAL AND MIXED USE TOWNSHIP DEVELOPMENT AND RELATED INFRASTRUCTURE ON VARIOUS PORTIONS OF THE FARMS BOSCHOEK 385IR & BOSCHFONTEIN 386IR NEAR HEIDELBERG IN THE LESEDI LOCAL MUNICIPALITY OF GAUTENG HIA Phase 1 21/05/2019 Anton Pelser A Pelser Archaeological Consulting AB Enviro Consult CC 19/05/2021 - 16:35
NOM5486 - HIA including PIA Heritage Impact Assessment: Environmental Authorisations for the Nomalanga Estates Expansion Project, KwaZulu-Natal HIA Phase 1 22/05/2019 Shannon Hardwick, Justin du Piesanie, Marion Bamford Digby Wells Environmental Nomalanga Property Holdings (Pty) Ltd 22/05/2019 - 11:07
AIA Phase 1 for Erfs 5117, 5118, & 6574, Kathu, Northern Cape Archaeological Impact Assessment Phase 1 for Erfs 5117, 5118, & 6574, Kathu, Northern Cape AIA Phase 1 22/05/2019 David Morris 15/11/2019 - 16:32
Mining Permit AIA on Waterfall 133, Northern Cape Heritage Impact Assessment for a a mining permit application in respect of alluvial diamonds and dolomite on the farm Waterfall 133 near Ritchie, Sol Plaatje Municipality, Northern Cape AIA Phase 1 23/05/2019 David Morris, Jani Mirialet Catherina Louw Archaeology department, McGreggor Museum Thaya Trading Enterprise 29/05/2019 - 09:44
PALAEONTOLOGICAL EXEMPTION LETTER OF THE PROPOSED 2.5ML PROCESS WATER RESERVOIR AT GLORIA MINE, BLACK ROCK, HOTAZEL, NORTHERN CAPE PALAEONTOLOGICAL EXEMPTION LETTER OF THE PROPOSED 2.5ML PROCESS WATER RESERVOIR AT GLORIA MINE, BLACK ROCK, HOTAZEL, NORTHERN CAPE HIA Letter of Exemption 24/05/2019 Elize Butler PGS Heritage (Pty) Ltd Assmang Black Rock Mining Operations 27/05/2019 - 10:12
HIA Gunstfontein Heritage Special Comment Letter Heritage Impact Assessment Specialist Reports 25/05/2019 CTS Heritage Savannah Environmental (Pty) Ltd 09/05/2019 - 14:58
Archaeological Impact Assessment MAGOGUDI CONSTRUCTION PROJECTS: PROPOSED MAGOGUDI TYRE STORAGE FACILITIES ANNFIELD PROJECT ON PORTION 3 OF THE FARM ANNFIELD 178, GA-SEGONYANA LOCAL MUNICIPALITY, NORTHERN CAPE PROVINCE Archaeological Specialist Reports 25/05/2019 Nelius Kruger Exigo3 Sustainability Magogudi Construction Projects CC 04/11/2019 - 18:00
ARCHAEOLOGICAL IMPACT ASSESSMENT (AIA) ON OLYVENHOUTSDRIFT PLOT 1298 ARCHAEOLOGICAL IMPACT ASSESSMENT (AIA) ON OLYVENHOUTSDRIFT PLOT 1298 FOR THE PROPOSED MAGOGUDI TYRE STORAGE FACILITIES OLYVENHOUTSDRIFT PROJECT, DAWID KRUIPER LOCAL MUNICIPALITY, NORTHERN CAPE PROVINCE Archaeological Specialist Reports 25/05/2019 Nelius Kruger Exigo3 Sustainability Magogudi Construction Projects CC 04/11/2019 - 18:24
Port Nolloth shell export RE: EXPORT OF SHELL SAMPLES FROM PORT NOLLOTH (CASE: 10978; PERMITID: 2533) Archaeological Permit Report 25/05/2019 25/05/2019 - 21:22
CONTINUOUS ASH DUMP FOR THE KENDAL POWER STATION PROPOSED EXTENSION OF THE CONTINUOUS ASH FACILITY AND EMERGENCY ASH DUMP FOR THE KENDAL POWER STATION AIA Phase 1 26/05/2019 Wouter Fourie 01/11/2022 - 19:48
AIA FOR THE PROPOSED A-THERMAL RETORT TECHNOLOGIES PLANT UPGRADE PROJECT, CITY OF TSHWANE, GAUTENG PROVINCE ARCHAEOLOGICAL IMPACT ASSESSMENT (AIA) ON A PORTION OF THE FARM OLIFANTSFONTEIN 410JR FOR THE PROPOSED A-THERMAL RETORT TECHNOLOGIES PLANT UPGRADE PROJECT, CITY OF TSHWANE, GAUTENG PROVINCE AIA Phase 1 26/05/2019 Neels Kruger Exigo Sustainability Exigo3 Sustainability 12/07/2021 - 10:02
Status quo and heritage mitigation Report Status Qou AND Pre-Mitigation Heritage Impact Assessment Report Incorporating Social Consultation For Burials identified during Phase 1 impact Assessment Study for South 32 (KPSX:SOUTH) Mining Development in Hartebeenlaagte 325 JS-Orgies EMALAHLENI LOCAL MUNICIPALITY, IN MPUMALANGA PROVINCE. Archaeological Permit Report 26/05/2019 Mabuda Mmbudziseni Moses Mulaifa Development Projects cc South 32 Coal Holdings PTY Ltd 29/05/2019 - 17:31