FindReports

THIS IS THE ARCHIVE FOR SAHRIS 1.0


THIS SITE IS NOW AN ARCHIVE AND IS NOT SUITABLE FOR MAKING APPLICATIONS

Please be aware that no content and application creation or changes to information on this version of SAHRIS will be retained.

To make applications or utilise SAHRIS for the creation of information, please use the new site:

https://sahris.org.za

Changes to SAHRIS!

The South African Heritage Resources Information System (SAHRIS) has undergone a generational upgrade and restructure. These changes to the site include, but are not limited to:

  • A new & modernised look and layout
  • Improved site usage flows with respect to applications and content creation
  • Improved site performance and stability

Launch for the new version of SAHRIS occurred on Monday the 30th of October 2023.

The new site can be found here:

SAHRIS | SAHRIS

Advanced options
ReportRef ReportTitle ReportType ReportDatesort descending Authors AuthoringBody CommissioningCompany Post date
Phase 1 Cultural Heritage Impact Assessment: THE PROSPECTING RIGHT APPLICATION COMBINED WITH A WASTE LICENCE APPLICATION FOR THE PROSPECTING OF DIAMONDS (ALLUVIAL, GENERAL & IN KIMBERLITE) & DIAMONDS NEAR DOUGLAS ON PORTION 1 OF THE FARMS VALS PAN 26, PORTION 2 & 3 OF THE FARM VRAAI PLAATS 27, PORTION 1 OF THE FARM ANNEX DIAMOND VALLEY, REGISTRATION DIVISION: HOPETOWN, NORTHERN CAPE PROVINCE HIA Phase 1 31/10/2022 J A van Schalkwyk J A van Schalkwyk Milnex 189 CC 19/10/2022 - 07:46
HIA for Ptn 329& RePtn7 Rietfontein 189_Greengate100&101 Heritage Impact Assessment required under Section 38 (1) of the NHRA, 1999 for the proposed Greengate Extension 100 and 101 Development on Portion 329 and the Remainder of Portion 7 of the Farm Rietfontein 189 IQ, Mogale City Local Municipality HIA Phase 1 01/11/2022 Jaco van der Walt Beyond Heritage Prism Environmental Management Services cc 09/03/2023 - 08:25
PHASE 1 HERITAGE IMPACT ASSESSMENT (HIA) FOR THE PROPOSED EXPANSION OF A SHEEP FEEDLOT PHASE 1 HERITAGE IMPACT ASSESSMENT (HIA) FOR THE PROPOSED EXPANSION OF A SHEEP FEEDLOT ON THE REMAINDER OF THE FARM GROENHOF, VREDEFORT ROAD, FREE STATE PROVINCE HIA Phase 1 01/11/2022 Leonie Marais-Botes Leonie Marais Botes 16/01/2023 - 12:13
Proposed new powerline near Groblershoop, NC Province. 132 KV GRID CONNECTION TRANSMISSION LINE BETWEEN THE ORANGE RIVER SOLAR FACILITY 1 AND ESKOM’S HIGH VOLTAGE GROBLERSHOOP SUBSTATION, NORTHERN CAPE PROVINCE HIA Phase 1 01/11/2022 Lloyd Rossouw Paleo Field Service 03/02/2023 - 09:34
HIA1 Proposed Chicken Broiler Development Thaba Nchu Phase 1 Heritage Impact Assessment for proposed new chicken broiler development on Farm Fransina 2060 near Thaba Nchu, Free State Province. HIA Phase 1 01/11/2022 Lloyd Rossouw 06/02/2023 - 09:43
Phase 1 Heritage Impact Assessment Proposed new powerline on farms Boegoeberg 48 and Rooisand 387 near Groblershoop, NC Province. HIA Phase 1 01/11/2022 Paleo Field Services 26/01/2023 - 10:48
Umsobomvu WEF Heritage Walk Through Heritage Impact Assessment Specialist Reports 01/11/2022 Gavin Anderson Umlando: Archaeological Surveys & Heritage Management Coastal & Environmental Services - East London 16/03/2023 - 11:13
Phase 1 Heritage Impact Assessment Groblershoop Powerline 132 KV GRID CONNECTION TRANSMISSION LINE BETWEEN THE ORANGE RIVER SOLAR FACILITY 1 AND ESKOM’S HIGH VOLTAGE GROBLERSHOOP SUBSTATION, NORTHERN CAPE PROVINCE. HIA Phase 1 01/11/2022 Lloyd Rossouw 26/01/2023 - 11:05
Umsobomvu WEF Heritage Walk Through Heritage Impact Assessment Specialist Reports 01/11/2022 Gavin Anderson Umlando: Archaeological Surveys & Heritage Management Coastal & Environmental Services - East London 16/03/2023 - 11:19
Soutrivier North WEF HIA AIA Phase 1 01/11/2022 Nelius Kruger Coastal & Environmental Services - Grahamstown Coastal & Environmental Services - East London 25/01/2023 - 09:42
REDESIGN OF TUYNHUYS PARKING LAYOUT PERMIT APPLICATION: REDESIGN OF TUYNHUYS PARKING LAYOUT 01/11/2022 Neche Ramjee - Lynch Department of Public Works 01/11/2022 - 13:06
HIA Application - replacement of Quay wall 3&4 and Ferry Landing in EL Port Heritage Impact Assessment Report IN TERMS OF SECTION 34 (1) OF NHRA FOR THE PROPOSED REPAIR AND PLACEMENT OF PORT STRUCTURES QUAY 3 & 4 AND FERRY LANDING IN THE PORT OF EAST LONDON IN THE EASTERN CAPE PROVINCE Heritage Impact Assessment Specialist Reports 01/11/2022 jennifer Mokakabye Setjo Sesho Consultants Transnet National Ports Authority - East London 12/09/2023 - 18:13
Umsobomvu WEF and Infrastructure Heritage Ground Truthing Umsobomvu WEF and Infrastructure Heritage Ground Truthing Heritage Study 01/11/2022 Gavin Anderson Umlando: Archaeological Surveys & Heritage Management EOH Coastal and Environmental Services 13/02/2023 - 09:44
Phase 1 Heritage Impact Assessment A PHASE I HERITAGE IMPACT ASSESSMENT (HIA) STUDY FOR SIBANYE STILLWATER’S PROPOSED MECCANO TAILINGS RETREATMENT PROJECT NEAR MARIKANA IN THE NORTH-WEST HIA Phase 1 01/11/2022 Dr Julius CC Pistorius Dr Julius CC Pistorious Archaeologist and heritage Consultant Alta van Dyk Environmental Consultants cc 13/01/2023 - 13:20
HIA: Aggeneys BESS HERITAGE IMPACT ASSESSMENT In terms of Section 38(8) of the NHRA for the Proposed development of the Aggeneys PV BESS near Aggeneys in the Northern Cape HIA Phase 1 01/11/2022 Jenna Lavin CTS Heritage WSP Group Africa (Pty) Ltd 31/03/2023 - 11:00
Archaeological Report Greenbushes Solar PV Facility A LETTER OF RECOMMENDATION (WITH CONDITIONS) FOR THE EXEMPTION OF A FULL PHASE 1 ARCHAEOLOGICAL IMPACT ASSESSMENT FOR THE PROPOSED DEVELOPMENT OF THE GREENBUSHES FARM SOLAR PV FACILITY ON PORTION 8 (PORTION OF PORTION 3) OF THE FARM KUYGA NO. 8, AS WELL AS ELECTRICAL TRANSMISSION LINES IN WARD 40 IN GREENBUSHES, GQEBERHA (PORT ELIZABETH), NELSON MANDELA BAY MUNICIPALITY, EASTERN CAPE PROVINCE HIA Letter of Exemption 02/11/2022 Kobus Reichert Eastern Cape Heritage Consultants CEN Integrated Environmental Management Unit 14/04/2023 - 20:02
HDBR Heritage Report HERITAGE IMPACT ASSESSMENT: FOR THE PROPOSED CONSTRUCTION OF THE 2 KM LONG HOLSDAM BARKLEY RIVER FARMERS 11KV POWERLINE Heritage Impact Assessment Specialist Reports 02/11/2022 Jaco van der Walt 1World Consultants (Pty) Ltd 1World Consultants (Pty) Ltd 03/11/2022 - 16:12
Stellenbosch Interest Group comment on Final Plans for FE 9 02/11/2022 02/11/2022 - 17:03
HDRB Heritage Report Heritage Impact Assessment: For the proposed construction of the 2km long Holsdam Barkly River Farmers 11kV powerline Heritage Impact Assessment Specialist Reports 03/11/2022 Jaco van der Walt 1World Consultants (Pty) Ltd 1World Consultants (Pty) Ltd 03/11/2022 - 16:04
Palaeontology Desktop Report Palaeontology Desktop Report PIA Desktop 03/11/2022 Marion Bamford (AHSA) Archaeological and Heritage Services Africa (Pty) Ltd 17/06/2022 - 01:14
PHASE 1 ARCHAEOLOGICAL IMPACT ASSESSMENT PHASE 1 ARCHAEOLOGICAL IMPACT ASSESSMENT for the Proposed Nndanganeni S102 application on a Portion intersecting Portions 14 and 15 of the Farm Hartogs Hof 413 JS, Middelburg, Mpumalanga AIA Phase 1 04/11/2022 Tobias Coetzee 11/11/2022 - 19:14
Heritage Impact Assessment Heritage Impact Assessment (Archaeology, Cultural Landscape and Palaeontology) for the Proposed 132 kV Overhead Power Line and Associated Electrical Grid Infrastructure to Support the Proposed Vhuvhili Solar Energy Facility near Secunda, Mpumalanaga Heritage Impact Assessment Specialist Reports 04/11/2022 Jayson Orton, Jaco van der Walt, Marion Bamford ASHA Consulting(Pty) Ltd Vhuvhili Solar (RF) (Pty) Ltd 15/11/2022 - 14:05
GEOHYDROLOGICAL INVESTIGATION GEOHYDROLOGICAL INVESTIGATION FOR THE PROPOSED DIAMOND KIMBERLITE AND DIAMOND GENERAL MINE IN BOSHOF WITHIN THE BOSHOF DISTRICT MUNICIPALITY, FREE STATE PROVINCE. 04/11/2022 Mufamadi M Geo Equilibria Biomental Services (Pty) Ltd 21/09/2023 - 07:38
REQUEST FOR EXEMPTION OF A PALAEONTOLOGICAL IMPACT ASSESSMENT Request for Exemption of a Palaeontological Impact Assessment for the proposed increased pig processing capacity at an abattoir on Portion 88 of Farm Langkuil 363 IR, Meyerton, Midvaal Local Municipality, Gauteng Province. Palaeontological Specialist Reports 05/11/2022 Marion Bamford Prof Marion Bamford Prof Marion Bamford 15/11/2022 - 11:20
Mukondeleli Paleontological 132kV Palaeontological Impact Assessment for the proposed Grid Connection for the Mukondeleli Wind Energy Facility, south of Secunda, Mpumalanga Province PIA Phase 1 06/11/2022 Marion Bamford WSP Group Africa (Pty) Ltd 09/02/2023 - 15:54
Mukondeleli Paleontological Assessment Paleontological Impact Assessment for the proposed Mukondeleli Wind Energy Facility, south of Secunda, Mpumalanga Province PIA Phase 1 06/11/2022 Marion Bamford WSP Group Africa (Pty) Ltd 12/01/2023 - 11:36
Richards Bay powership HIA FOR THE RICHARDS BAY POWERSHIP, RICHARDS BAY, KZN HIA Phase 1 06/11/2022 Gavin Anderson Umlando: Archaeological Surveys & Heritage Management Triplo4 Sustainable Solutions (Pty) Ltd 10/11/2022 - 09:22
Heritage Report for the Proposed Loxton Wind Energy Facility 1 HERITAGE IMPACT ASSESSMENT: PROPOSED LOXTON WIND ENERGY FACILITY 1, CARNARVON AND VICTORIA WEST MAGISTERIAL DISTRICTS, NORTHERN CAPE Heritage Scoping 07/11/2022 Jayson Orton (AHSA) Archaeological and Heritage Services Africa (Pty) Ltd 15/11/2022 - 11:07
Palaeontological Heritage Draft Scoping Loxton WEF 1 Palaeontological Heritage: combined desktop and field-based Compliance Statement PROPOSED LOXTON WEF CLUSTER, UBUNTU LOCAL MUNICIPALITY AND THE PIXLEY KA SEME DISTRICT MUNICIPALITY IN THE NORTHERN CAPE PROVINCE. PIA Desktop 07/11/2022 John E. Almond Natura Viva CC 15/11/2022 - 11:14
Heritage Impact Assessment Report HERITAGE SURVEY OF THE UPGRADING OF THE D2286, P372, L1190, P148, L1333, L1351, D897, AND D30 Heritage Scoping 07/11/2022 Gavin Anderson Umlando: Archaeological Surveys & Heritage Management 17/05/2023 - 14:46
Isandlwana road upgrades HERITAGE SURVEY OF THE UPGRADING OF THE D2286, P372, L1190, P148, L1333, L1351, D897, AND D30 HIA Phase 1 07/11/2022 Umlando: Archaeological Surveys & Heritage Management Afzelia Environmental Consultants Pty Ltd 29/06/2023 - 09:32
Heritage Draft Scoping Report Loxton WEF 1 Heritage Scoping 07/11/2022 15/11/2022 - 11:37
Vaalbult Palaeontological Monitoring Report Annual Palaeontological Monitoring Report (September 2020) on Vaalbult Colliery located on Portion 1,9 and 10 of the Farm Vaalbult 3IT, Mpumalanga Province Palaeontological Monitoring 07/11/2022 16/11/2020 - 13:45
Palaeontological Heritage Draft Scoping Loxton WEF 2 Palaeontological Heritage: combined desktop and field-based Compliance Statement PROPOSED LOXTON WEF CLUSTER, UBUNTU LOCAL MUNICIPALITY AND THE PIXLEY KA SEME DISTRICT MUNICIPALITY IN THE NORTHERN CAPE PROVINCE. PIA Desktop 07/11/2022 John E. Almond Natura Viva CC Loxton Wind Facility 2 (Pty) Ltd 15/11/2022 - 12:04
Heritage Survey HERITAGE SURVEY OF THE UPGRADING OF THE D2286, P372, L1190, P148, L1333, L1351, D897, AND D30 Heritage Impact Assessment Specialist Reports 07/11/2022 Gavin Anderson Umlando: Archaeological Surveys & Heritage Management Umlando: Archaeological Surveys & Heritage Management 15/05/2023 - 11:16
Palaeontological Heritage Draft Scoping Report Loxton WEF 2 Palaeontological Heritage: combined desktop and field-based Compliance Statement PROPOSED LOXTON WEF CLUSTER, UBUNTU LOCAL MUNICIPALITY AND THE PIXLEY KA SEME DISTRICT MUNICIPALITY IN THE NORTHERN CAPE PROVINCE. PIA Desktop 07/11/2022 John E. Almond Natura Viva CC Loxton Wind Facility 3(Pty) Ltd 15/11/2022 - 12:25
NVT Timber HERITAGE IMPACT ASSESSMENT FOR THE NCT TIMBER LOADING AREA HIA Phase 1 07/11/2022 Gavin Anderson Umlando: Archaeological Surveys & Heritage Management Independent Environmental Advisor 11/11/2022 - 17:38
PHASE 1 ARCHAEOLOGICAL IMPACT ASSESSMENT PHASE 1 ARCHAEOLOGICAL IMPACT ASSESSMENT for the Proposed Tala Bethal S102 Amendment on a Portion of Portion 1 of the Farm K-Stad 195 IS, Hendrina, Mpumalanga AIA Phase 1 08/11/2022 Tobias Coetzee 11/11/2022 - 19:06
LEEUDORINGSTAD 132KV POWER LINE HIA PROPOSED CONSTRUCTION OF THE LEEUDORINGSTAD 132KV POWERLINE, NORTH WEST PROVINCE, SOUTH AFRICA Heritage Impact Assessment Specialist Reports 08/11/2022 Nikki Mann PGS Heritage (Pty) Ltd SiVEST SA (Pty) Ltd 15/12/2022 - 15:36
Heritage Impact Assessment for the proposed Vhuvhili Solar PV Energy Facility Heritage Impact Assessment (HIA) for the proposed Vhuvhili Solar PV Facility Heritage Impact Assessment Specialist Reports 08/11/2022 Jayson Orton, Marion Bamford, Jaco van der Walt ASHA Consulting(Pty) Ltd, Beyond Heritage ASHA Consulting(Pty) Ltd 17/06/2022 - 00:58
HIA: Highveld PV HERITAGE IMPACT ASSESSMENT In terms of Section 38(8) of the NHRA for the Proposed development of the Highveld PV Cluster near Potchefstroom, North West Province HIA Phase 1 08/11/2022 Jenna Lavin, Marion Bamford CTS Heritage Savannah Environmental (Pty) Ltd 14/11/2022 - 12:18
Khangela Emoyeni Heritage Pre-Construction Walkthrough Report Khangela Emoyeni Heritage Pre-Construction Walkthrough Report Heritage Impact Assessment Specialist Reports 09/11/2022 Nikki Mann PGS Heritage (Pty) Ltd Nala Environmental (Pty) Ltd 09/12/2022 - 13:15
22242- HIA Haven 88-22kV Substation HERITAGE IMPACT ASESSMENT FOR THE PROPOSED HAVEN 88-22KV SUBSTATION ON HOLDING 98 CHARTWELL AGRICULTURAL HOLDINGS AND PART OF ERF 3, CHARTWELL EXTENSION 1, CITY OF JOHANNESBURG, GAUTENG PROVINCE. Heritage Impact Assessment Specialist Reports 09/11/2022 Jaco van der Walt HCAC Heritage Consultants Prism Environmental Management Services cc 18/11/2022 - 09:45
Heritage Impact Assessment for the for the Proposed New Residential Township Development Of Vanderbijl Park South West No 8 Ext 1, Situated On Holding 23, Lasiandra Ah, Emfuleni Local Municipality, Sedibeng District Municipality, Gauteng Province Heritage Impact Assessment for the for the Proposed New Residential Township Development Of Vanderbijl Park South West No 8 Ext 1, Situated On Holding 23, Lasiandra Ah, Emfuleni Local Municipality, Sedibeng District Municipality, Gauteng Province HIA Phase 1 09/11/2022 Jaco van der Walt Beyond Heritage Isquare Environmental Planning and GIS 20/12/2022 - 13:52
Khangela Emoyeni Heritage Pre-Construction Walkthrough Report Khangela Emoyeni Heritage Pre-Construction Walkthrough Report Heritage Impact Assessment Specialist Reports 09/11/2022 Nikki Mann PGS Heritage (Pty) Ltd Nala Environmental (Pty) Ltd 09/12/2022 - 13:21
Emulsion Plant letter Application for exemption from a Heritage Impact Assessment for the proposed Emulsion Plant at Venetia Mine Near Alldays, Limpopo Province HIA Letter of Exemption 09/11/2022 Jaco van der Walt Beyond Heritage Alta van Dyk Environmental Consultants cc 10/11/2022 - 10:20
Amended Cultural Heritage Impact Assessment: Phase 1 Investigation for a Proposed Environmental Authorisation Application of Mr Petrus Van Der Walt Vermeulen for the proposed Prospecting Right for the prospecting of Diamonds Alluvial (DA), Diamonds General (D), Diamonds in Kimberlite (DK) and Diamonds (DIA) on Portion 3 of the Farm Deelfontein 237 RD near Hopetown, Thembelihle Local Municipality, Pixley Ka Seme District Municipality, Northern Cape HIA Phase 1 10/11/2022 Francois Coetzee Francois P Coetzee Milnex 189 CC 10/11/2022 - 12:14
HIA-Invest in Property126 (Pty) Ltd PHASE I ARCHAEOLOGICAL AND HERITAGE IMPACT ASSESSMENT SPECIALIST REPORT FOR THE PROPOSED MINING RIGHT ON THE FARM VILJOENSHOF 1655 IN BOSHOF WITHIN THE JURISDICTION OF TOKOLOGO LOCAL MUNICIPALITY OF LEJWELEPUTSWA DISTRICT MUNICIPALITY, FREE STATE PROVINCE HIA Phase 1 10/11/2022 Alvord Nhundu Biomental Services (Pty) Ltd Biomental Services (Pty) Ltd 20/09/2023 - 20:44
Form A 10/11/2022 18/11/2022 - 11:23
invest in Property Heritage Impact Assessment Phase I PHASE I ARCHAEOLOGICAL AND HERITAGE IMPACT ASSESSMENT SPECIALIST REPORT FOR THE PROPOSED MINING RIGHT ON THE FARM VILJOENSHOF 1655 IN BOSHOF WITHIN THE JURISDICTION OF TOKOLOGO LOCAL MUNICIPALITY OF LEJWELEPUTSWA DISTRICT MUNICIPALITY, FREE STATE PROVINCE HIA Phase 1 10/11/2022 Alvord Nhundu Biomental Services (Pty) Ltd 12/04/2023 - 20:54

Pages

CSV
 
 

Search form