THIS IS THE ARCHIVE FOR SAHRIS 1.0
THIS SITE IS NOW AN ARCHIVE AND IS NOT SUITABLE FOR MAKING APPLICATIONS
Please be aware that no content and application creation or changes to information on this version of SAHRIS will be retained.
To make applications or utilise SAHRIS for the creation of information, please use the new site:
https://sahris.org.za
Changes to SAHRIS!
The South African Heritage Resources Information System (SAHRIS) has undergone a generational upgrade and restructure. These changes to the site include, but are not limited to:
- A new & modernised look and layout
- Improved site usage flows with respect to applications and content creation
- Improved site performance and stability
Launch for the new version of SAHRIS occurred on Monday the 30th of October 2023.
The new site can be found here:
SAHRIS | SAHRIS
Displaying 14501 - 14550 of 18975
ReportRef | ReportTitle | ReportType | ReportDate | Authors | AuthoringBody | CommissioningCompany | MapID < 2009 | Post date |
---|---|---|---|---|---|---|---|---|
phase 1 HIA STELLA | PHASE 1 CULTURAL HERITAGE RESOURCES IMPACT ASSESSMENT | AIA Phase 1 | 30/09/2015 | Udo Kusel | African Heritage Consultants CC | African Heritage Consultants CC | 03/12/2015 - 10:18 | |
Heritage Report Groenkloof Extension 13 | Phase 1 Cultural Heritage Resources Impact Assessment | HIA Phase 1 | 20/05/2015 | Siegwalt Udo Kusel | African Heritage Consultants CC | LEAP - Lanscape Architect Environmental Planner | 10/06/2016 - 13:03 | |
Phase 1 Cultural Heritage Resources Impact Assessment | Phase 1 Cultural Heritage Resources Impact Assessment for the expansion of the existing cemetery site on the remainder of portion 3 of the farm Sjambok Zijn Oude Kraal 258 JR Ga-Rankuwa Tshwane Gauteng | HIA Phase 1 | 22/04/2015 | Udo Kusel | African Heritage Consultants CC | Aurecon - Head Office | 17/06/2015 - 09:46 | |
Phase 1 Cultural Heritage Resources Impact Assessment | Phase 1 Cultural Heritage Resources Impact Assessment for the expansion of the existing cemetery site on the remainder of portion 3 of the farm Sjambok Zijn Oude Kraal 258 JR Ga-Rankuwa Tshwane Gauteng | HIA Phase 1 | 22/04/2015 | Udo Kusel | African Heritage Consultants CC | Aurecon - Head Office | 17/06/2015 - 09:46 | |
Phase 1 Cultural Heritage Resources Impact Assessment | Phase 1 Cultural Heritage Resources Impact Assessment for the expansion of the existing cemetery site on the remainder of portion 3 of the farm Sjambok Zijn Oude Kraal 258 JR Ga-Rankuwa Tshwane Gauteng | HIA Phase 1 | 22/04/2015 | Udo Kusel | African Heritage Consultants CC | Aurecon - Head Office | 17/06/2015 - 09:46 | |
Phase 1 Cultural Heritage Resources Impact Assessment | Phase 1 Cultural Heritage Resources Impact Assessment for the expansion of the existing cemetery site on the Remainder of Portion 33 of the Farm Mabopane 702 JR Tshwane Gauteng Province | HIA Phase 1 | 22/04/2015 | Udo Kusel | African Heritage Consultants CC | Aurecon - Head Office | 17/06/2015 - 11:32 | |
Phase 1 Cultural Heritage Resources Impact Assessment | Phase 1 Cultural Heritage Resources Impact Assessment for the expansion of the existing cemetery site on the Remaining Extent of the Farm Hatherley 331 JR Mamelodi Tshwane Gauteng Province | HIA Phase 1 | 22/04/2015 | Udo Kusel | African Heritage Consultants CC | Aurecon - Head Office | 17/06/2015 - 12:01 | |
Phase 1 cultural heritage resources impact assessment | Phase 1 cultural heritage resources impact assessment for the proposed prospecting area on portion 1 (Kadgame number 3), portion 2 (Noordpool) and portion 4 (Bakenskop) of the farm Kadgame 558 located within the Kuruman Magisterial District, Northern Cape Province. | HIA Phase 1 | Danie Labuschagne | Milnex 189 CC | 10/10/2023 - 12:53 | |||
9-2-274-0002-20070601-VHHC | Phase 1 Cultural Heritage Scoping Report: Proposed Establishment of Residential Stands at Mokwakwaila Village in Greater Tzaneen Local Municipality of Limpopo Province | AIA Phase 1 | 01/06/2007 | Richard Munyai, Frans Roodt | Vhufa Hashu Heritage Consultants | MAPID_00893 | 16/06/2012 - 14:41 | |
9-2-111-0006-19980501-ACO | Phase 1 Cultural-Historical Assessment of the Proposed Westlake Development Area, Tokai | AIA Phase 1 | 01/05/1998 | Timothy Hart | ACO Associates CC | MAPID_01988 | 16/06/2012 - 14:37 | |
Phase I Desktop HIA for the proposed Prospecting Activities on a certain piece of land on the Remainder of Farm Nchwaning 267, near Hotazel, Northern Cape. | Phase 1 Desktop Heritage Impact Assessment & Palaeontological Desktop Assessment for a Mine Prospecting Application on A portion of a Remainder of the Farm Nchwaning 267 near Hotazel in the Joe Morolong Local Municipality, Northern Cape | HIA Phase 1 | 09/02/2023 | Edward Matenga | (AHSA) Archaeological and Heritage Services Africa (Pty) Ltd | Bidhaa Resources (Pty) Ltd | 09/01/2023 - 22:41 | |
9-2-018-0043-20050101-HAC | Phase 1 Exploration Excavation Report 31 Mechau Street, Cape Town, Erf 742 | AIA Phase 1 | 01/01/2005 | Ute Seemann | MAPID_01960 | 16/06/2012 - 14:34 | ||
9-2-258-0005-20040601-MPL | Phase 1 Ha for the Proposed Gardener Ross Golf and Country Estate, Centurion | AIA Phase 1 | 01/06/2004 | Wouter Fourie | Matakoma Heritage Consultants (Pty) Ltd | MAPID_00523 | 16/06/2012 - 14:40 | |
PHASE 1 HERITAGE IMPACT ASSESSMENT Witwater Airstrip | PHASE 1 HERITAGE IMPACT ASSESSMENT for the Proposed NTT Witwater Airfield on the Farm 948 KR near Vaalwater, Limpopo Province | AIA Phase 1 | 26/08/2023 | Tobias Coetzee | 19/10/2023 - 14:24 | |||
9-2-274-0002-20080728-AHM | Phase 1 Heritage and Archaeological Impact Assessment. Proposed Establishment of an Access Road Between Sapekoe Drive and Koedoe Street, Erf 3366 (Extension 22) and the Remainder of Erf 430 (Extension 4) | AIA Phase 1 | 28/07/2008 | Johan Nel, GC De Kamper | University of Pretoria - Archaic Heritage Project Management | MAPID_01759 | 16/06/2012 - 14:41 | |
AIA_Duma_Substation_Murimbika_M_Aug09 | Phase 1 Heritage and Cultural Impact Assessment specialist study report. Proposed construction of a new 132KV Duma substation in the Thaba Chue local Municipality, Enhlanzeni District, Mpumalanga Province. | AIA Phase 1 | 01/08/2009 | McEdward Murimbika | Nzumbululo Heritage Solutions | MAPID_03377 | 16/06/2012 - 14:44 | |
Phase 1 Heritage and Palaeontological Impact Assessment for Plot 32 Shannon Valley, Bfn, Free State Province | Phase 1 Heritage and Palaeontological Impact Assessment for Plot 32 Shannon Valley, Bfn, Free State Province | HIA Phase 1 | 13/02/2017 | Lloyd Rossouw | National Museum Bloemfontein | Manie van Wyk Environmental Consultants, Bloemfontein | 18/11/2019 - 07:38 | |
Phase 1 Heritage and Palaeontological Impact Assessment for Plot 32 Shannon Valley, Bfn, Free State Province | Phase 1 Heritage and Palaeontological Impact Assessment for Plot 32 Shannon Valley, Bfn, Free State Province | HIA Phase 1 | 14/02/2019 | Lloyd Rossouw | National Museum Bloemfontein | Manie van Wyk Environmental Consultants, Bloemfontein | 18/11/2019 - 07:48 | |
Glen Thorne Farm Phase 1 Heritage Impact Assessment | Phase 1 Heritage Assessment for the proposed mining of sand on the Remaining Extent of the farm Glen Thorne 2163, Magisterial District of Bloemfontein | HIA Phase 1 | 17/02/2017 | Lloyd Rossouw | National Museum Bloemfontein | 23/03/2017 - 15:52 | ||
PHASE 1 HERITAGE ASSESSMENT FS 30/5/1/2/2/172 MR | PHASE 1 HERITAGE ASSESSMENT FS 30/5/1/2/2/172 MR | HIA Phase 1 | 18/02/2008 | Peter Beaumont | McGregor Museum | 28/11/2014 - 14:41 | ||
Phase 1 Heritage Assessment for P22071 Worcester to Glen Heatlie Project | Phase 1 Heritage Assessment of P22071 SANRAL Worcester to Glen Heatlie Project. | HIA Phase 1 | 12/10/2023 - 08:27 | |||||
46 Rivertide, Kromme River | Phase 1 Heritage Assessment Report For site number 46, Rivertide Shareblock Scheme, situate on Portion 4 of the farm Osbosch 707, Kromme River, Humansdorp RD, Kouga Municipality, Cacadu District, Eastern Cape Province. | AIA Phase 1 | 23/05/2012 | Frank Silberbauer | Infinity Consulting | Miriam Muller | 23/07/2012 - 16:21 | |
9-2-037-0001-20070624-McGM | Phase 1 Heritage Assessment Report on the Farm Makganyene 667, Between Postmasburg and Olifantshoek, Siyanda District Municipality, Northern Cape Province | AIA Phase 1 | 24/06/2007 | Peter Beaumont | McGregor Museum | MAPID_00977 | 16/06/2012 - 14:35 | |
Heritage Assessment for Lilyvale 30/2313 | Phase 1 Heritage Assessment with regard to planned Township development on the Farm Lilyvale 30/2313, Bloemfontein, Free State. Phase 1 Palaeontological Impact Assessment with regard to proposed Township development on the Farm Lilyvale 30/2313, Bloemfontein, Free State. | HIA Phase 1 | 15/01/2018 | 24/01/2018 - 17:19 | ||||
Phase 1 Heritage assessment- | Phase 1 Heritage Assessment- Eye of Africa Township Extension | AIA Desktop | 03/02/2020 | Cornerstone Consultants | Eye of Africa Development | 14/08/2020 - 18:24 | ||
AIA_Moses_Kotane_Pipeline_Roodt_F_Sep07 | Phase 1 Heritage Development of a Water Pipeline to Moses Kotane Municipality and the Barrick and Boynton Mines: Limpopo and North West Provinces | AIA Phase 1 | 01/09/2007 | Frans Roodt | R & R Cultural Resource Consultants | CTS_7414 | 16/06/2012 - 14:48 | |
40780: Warrenton Pipeline | Phase 1 Heritage Impact a of a new pipeline crossing over the Vaal River at the Margaretha Prinsloo Bridge on the N18 national road outside Warrenton, Northern Cape Province. | HIA Phase 1 | 22/08/2018 | Lloyd Rossouw | 29/10/2018 - 09:19 | |||
9-2-253-0003-20070101-VHHC | Phase 1 Heritage iMpact Asessment: An Archaeological Investigation of Proposed Site for Demarcation of 500 Site at Bethesda 208 LS, Mollemole Local Municipality | AIA Phase 1 | 01/01/2007 | Frans Roodt, Richard Munyai | Vhufa Hashu Heritage Consultants | MAPID_01476 | 16/06/2012 - 14:39 | |
DFT Coali prospecting Right Application. DMR Ref: KZN 10899 PRO | PHASE 1 HERITAGE IMPACT ASSESSMENT COAL PROSPECTING RIGHT APPLICATION ON FARM MOOIKLIP 239 HU IN THE VRYHEID DISTRICT, KWAZULU NATAL PROVINCE | HIA Phase 1 | KwaZulu-Natal Amafa and Research Institute | Lushika Services | 06/03/2020 - 08:18 | |||
HIA_EXM_Proposed Pollution Control Dams_Final Reviewed Report_Version 2 | PHASE 1 HERITAGE IMPACT ASSESSMENT PROPOSED DEVELOPMENT OF A NEW POLLUTION CONTROL DAM AT ALDAG, ON THE REMAINDER OF THE FARM SISHEN 543, AND THE EXPANSION OF A CURRENTLY PLANNED POLLUTION CONTROL DAM ON THE REMAINDER OF THE FARM LYLYVELD 545, NORTHERN CAPE. | HIA Phase 1 | 06/06/2018 | 08/06/2018 - 08:42 | ||||
Scheiding Heritage Study | Phase 1 Heritage Impact Assessment PROPOSED OPENCAST CHROME MINE ON THE FARM SCHEIDING: Lepelle-Nkumpi Municipality | Heritage Impact Assessment Specialist Reports | 24/04/2013 | Frans Roodt | R & R Cultural Resource Consultants | Prime Resources (Pty) Ltd | 30/07/2013 - 08:15 | |
Manjekwini HIA | Phase 1 Heritage Impact Assessment for the proposed construction of Emanjokweni Community Hall in Manjokweni, Inkosi Langalibalele Local Municipality, Kwa-Zulu Natal | Roy Muroyi | Tsimba Archaeological Footprints (Pty) Ltd | Tlhaho Environmental Consultants (Pty) Ltd | 20/09/2023 - 16:03 | |||
Ntinini WSS HIA Phase 1 Report | Phase 1 Heritage Impact Assessment Ntinini Bulk Water Supply Scheme | HIA Phase 1 | 07/08/2012 | Len van Schalkwyk | eThembeni Cultural Heritage | E&D Consulting Services cc | 15/07/2013 - 22:09 | |
Final HIA Report | Phase 1 Heritage Impact Assessment | HIA Phase 1 | 29/03/2022 | Lloyd Rossouw | Palaeo Field Services | 29/03/2022 - 14:26 | ||
Phase 1 HIA:Windhoek 393 | Phase 1 Heritage Impact Assessment | HIA Phase 1 | 05/07/2022 | Lloyd Rossouw | Electri City Mining (Pty) Ltd | 05/07/2022 - 11:53 | ||
Phase 1 HIA_Umshwathi Bulk Water Supply Scheme Phase 4 | Phase 1 Heritage Impact Assessment for the Proposed Umshwathi Bulk Water Supply Scheme Phase 4, Ndwedwe Local Municipality, KwaZulu Natal. | HIA Phase 1 | 20/03/2020 | Jean Beater | JLB Consulting | 1World Consultants (Pty) Ltd | 12/09/2018 - 16:00 | |
1st phase Heritage Impact Assessment Environmental Authorisation (EA) process and application for Renewal of existing Mining Right for | Phase 1 Heritage Impact Assessment study for Seriti Coal (Pty) Ltd: Arnot Colliery Mining Right Renewal Application. | HIA Phase 1 | 31/07/2023 | Sidney Miller | 08/09/2023 - 14:08 | |||
The Proposed Development of the Umlaas Junction Light Industrial Estate on a 139-ha portion of the Remainder of Farm Crookes 15723, Mkhambathini Local Municipality, KwaZulu-Natal | Phase 1 Heritage Impact Assessment & Desktop Paleontological Impact Assessment for the proposed establishment of the Umlaas Junction Private Light Industrial Estate, Camperdown, KwaZulu-Natal | HIA Phase 1 | 01/03/2022 | Phillipa Harrison | Green Door Environmental | Green Door Environmental | 27/01/2023 - 15:40 | |
Phase 1 Heritage Impact Assessment & Desktop Paleontological Impact Assessment for the proposed establishment of the Umlaas Junction Light Industrial Estate, Camperdown, KwaZulu-Natal. | Phase 1 Heritage Impact Assessment & Desktop Paleontological Impact Assessment for the proposed establishment of the Umlaas Junction Private Light Industrial Estate, Camperdown, KwaZulu-Natal. | HIA Phase 1 | 01/03/2022 | Phillipa Harrison | Green Door Environmental | Green Door Environmental | 27/01/2023 - 15:23 | |
Phase I HIA (Desktop) for proposed Prospecting Activities on Farm Perth 343, near Hotazel, Northern Cape. | Phase 1 Heritage Impact Assessment & Palaeontological Assessment (Desktop) for a Mine Prospecting Application on the Farm Perth 343 near Hotazel in the Joe Morolong Local Municipality, Northern Cape | HIA Phase 1 | 09/02/2023 | Edward Matenga | (AHSA) Archaeological and Heritage Services Africa (Pty) Ltd | Thaya Trading Enterprise | 09/01/2023 - 19:28 | |
HIA for Leeuwfontein Residential Development | PHASE 1 HERITAGE IMPACT ASSESSMENT & REPORT FOR THEvLEEUWFONTEIN RESIDENTIAL DEVELOPMENT BASID ASSESSMENT PROCESSvPORTION 111 OF LEEUWFONTEIN 299JR GREATER TSHWANE MUNICIPAL AREA, GAUTENG | HIA Phase 1 | 30/11/2020 | Anton Pelser | APELSER ARCHAEOLOGICAL CONSULTING | Red Kite Environmental Solutions (Pty) Ltd | 11/11/2022 - 08:45 | |
Phase 1 Heritage Impact Assessment, Farm 713, SRVM | Phase 1 Heritage Impact Assessment (Archaeology and Palaeontology) of Disco Chicks Farm 2 (Farm 713), Sundays River Valley Municipality | HIA Phase 1 | 30/06/2014 | Lloyd Rossouw | Public Process Consultants | CTS_156894 | 18/02/2014 - 12:26 | |
BBMT HIA | PHASE 1 HERITAGE IMPACT ASSESSMENT (HIA) FOR PROPOSED DEVELOPMENT OF 8 CHICKEN HOUSES AND ASSOCIATED INFRASTRUCTURE FOR BBMT CHICKEN POULTRY LOCATED ON PORTION 39 OF THE FARM KLIPPAN 21 JR, LIMPOPO PROVINCE | HIA Phase 1 | 28/09/2018 | Leonie Marais-Botes | 28/09/2018 - 14:39 | |||
PHASE 1 HERITAGE IMPACT ASSESSMENT (HIA) FOR A PROPOSED 8000 SOW UNIT PIGGERY ON PORTIONS OF THE FARMS SAMARIA, DE RUST, REWIESIE AND MARA, FREE STATE PROVINCE | PHASE 1 HERITAGE IMPACT ASSESSMENT (HIA) FOR A PROPOSED 8000 SOW UNIT PIGGERY ON PORTIONS OF THE FARMS SAMARIA, DE RUST, REWIESIE AND MARA, FREE STATE PROVINCE | HIA Phase 1 | 31/03/2022 | Leonie Marais-Botes | Leonie Marais Botes | 24/06/2022 - 13:08 | ||
HIA JACKAL CREEK GOLF ESTATE | PHASE 1 HERITAGE IMPACT ASSESSMENT (HIA) FOR ERF 647 ZANDSPRUIT X 19, JACKAL CREEK GOLF ESTATE, BOUNDARY ROAD, NORTHRIDING, GAUTENG PROVINCE | HIA Phase 1 | 15/11/2018 | Leonie Marais | Leonie Marais Heritage Practitioner | ZANDEVCO (PTY) LTD | 14/09/2021 - 08:53 | |
PROPOSED DEVELOPMENT OF AN EGG LAYING UNIT ON THE FARM NEW HOPE, FS | PHASE 1 HERITAGE IMPACT ASSESSMENT (HIA) FOR PROPOSED DEVELOPMENT OF AN EGG LAYING UNIT ON THE FARM NEW HOPE, NEAR HENNENMAN, FREE STATE PROVINCE | HIA Phase 1 | 20/03/2019 | Leonie Marais-Botes | Leonie Marais Botes | 03/04/2019 - 14:06 | ||
HIA for Somkhele’s Ophondweni and Emalahleni opencast pits | Phase 1 Heritage Impact Assessment (HIA) for proposed mining infrastructure for Somkhele’s Ophondweni and Emalahleni opencast pits, near Mtubatuba, KwaZulu Natal Province. | HIA Phase 1 | 20/01/2020 | Wouter Fourie, Polke Birkholtz, Ilan Smeyatsky | PGS Heritage (Pty) Ltd | Tendele Coal Mining (Pty) Ltd | 29/05/2020 - 15:25 | |
Stilfontein Truck Stop and Filling Station | Phase 1 Heritage Impact Assessment (HIA) for Stilfontein Truck Stop and Filling Station | HIA Phase 1 | 18/11/2022 | Ane Agenbacht | Sapphire Environmental Consulting | Sapphire Environmental Consulting | 16/08/2022 - 14:29 | |
HIA of Alpine Heath Resort gabion installation | Phase 1 Heritage Impact Assessment (HIA) for the Alpine Heath Resort on the Farm Akkerman 5679 GS, Northern Drakensberg, KZN | Leonie Marais-Botes | 05/08/2021 - 13:30 | |||||
LEFA COLLIERY HIA PHASE 1 STUDY | PHASE 1 HERITAGE IMPACT ASSESSMENT (HIA) FOR THE ENVIRONMENTAL IMPACT ASSESSMENT (EIA) AND WATER USE LICENSE APPLICATION PROCESS FOR A MINING RIGHT ON AN EXISITNG PROSPECTING RIGHT REF. FS 30/5/1/1/2/10158 PR TO BE KNOWN AS LEFA COLLIERY | HIA Phase 1 | 09/03/2017 | Leonie Marais-Botes | 23/08/2017 - 11:32 |