THIS IS THE ARCHIVE FOR SAHRIS 1.0
THIS SITE IS NOW AN ARCHIVE AND IS NOT SUITABLE FOR MAKING APPLICATIONS
Please be aware that no content and application creation or changes to information on this version of SAHRIS will be retained.
To make applications or utilise SAHRIS for the creation of information, please use the new site:
https://sahris.org.za
Changes to SAHRIS!
The South African Heritage Resources Information System (SAHRIS) has undergone a generational upgrade and restructure. These changes to the site include, but are not limited to:
- A new & modernised look and layout
- Improved site usage flows with respect to applications and content creation
- Improved site performance and stability
Launch for the new version of SAHRIS occurred on Monday the 30th of October 2023.
The new site can be found here:
SAHRIS | SAHRIS
Displaying 17651 - 17700 of 18975
ReportRef | ReportTitle | ReportType | ReportDate | Authors | AuthoringBody | CommissioningCompany | MapID < 2009 | Post date |
---|---|---|---|---|---|---|---|---|
HIA for MAhlathini Road | CULTURAL HERITAGE IMPACT ASSESSMENT FOR THE PROPOSED UPGRADING OF MAHLATHINI ROAD | Heritage Impact Assessment Specialist Reports | 06/05/2016 | Frans Prins | 09/05/2016 - 12:37 | |||
HIA | Cultural Heritage Impact Assessment | Heritage Impact Assessment Specialist Reports | 17/12/2016 | Anton van Vollenhoven | 10/07/2017 - 15:16 | |||
HIA Erksin Farm, Winterton, KZN | CULTURAL HERITAGE IMPACT ASSESSMENT OF THE PROPOSED CULTIVATION OF 70 HECTARES OF ARABLE LAND AND THE EXPANSION OF AN EXISTING DAM ON PORTION 3 OF 1919, ERSKINE FARM, IN CATHKIN (NEAR WINTERTON), KWAZULU-NATAL | Heritage Impact Assessment Specialist Reports | Frans Prins | Active Heritage CC | Green Door Environmental | 28/07/2016 - 15:50 | ||
Generaal Heritage Impact Assessment | The report is a Heritage Impact Assessment (HIA) for the Generaal Project area, Vhembe District, Limpopo Province, which describes potential adverse and positive effects of the proposed mining operations on heritage resources. The report builds on a scoping survey conducted earlier and adds results of fieldwork which followed. The report will inform decisions on intervention strategies for sustainable management of the heritage resources in the mining area. The Heritage Impact Assessment follows the requirements of the National Heritage Resources Act (No 25: 1999), the relevant regulations of which are Section 38 (Heritage Impact Assessment process), Section 34 (Buildings and Structures older than 60 years) Section 35 (Archaeological and Palaentological sites) and Section 36 (Graves and Burial Grounds). | Heritage Impact Assessment Specialist Reports | 10/12/2013 | Matodzi Silidi, Innocent Pikirayi | Mbofho Consulting and Project Managers | Jacana Environmental cc | 17/01/2014 - 08:04 | |
Heritage Impact Assessment | Heritage Impact Assessment & Palaeontological Desk Assessment for a Mining Right Application on Portion 1 (Neel Dale), Portion 2 (Witkop), Portion 3 (Eijerdop Put), Portion Eyerdop Pan 58, Near Marydale, Northern Cape Province | Heritage Impact Assessment Specialist Reports | 11/03/2021 | Edward Matenga | Edward Matenga | 12/03/2021 - 07:59 | ||
HIA, Borrow Pit, Divisional road 01721 (DR01721), Klaarstroom, Prince Albert | Heritage Impact Assessment submitted in terms of section 38(8) of the National Heritage Resources Act: Divisional Road 01721, Klaarstroom Prince Albert – Central Karoo District Municipality, Western Cape | Heritage Impact Assessment Specialist Reports | 25/04/2012 | Vidamemoria Heritage Consultants | Aurecon South Africa (Pty) Ltd | CTS_503285 | 11/04/2018 - 15:07 | |
Iziduli Emoyeni Walkdown Report | HERITAGE WALKDOWN REPORT for the approved Iziduli Emoyeni Wind Energy Facility and associated infrastructure in the Eastern Cape | Heritage Impact Assessment Specialist Reports | 06/06/2022 | Jenna Lavin, Nicholas Wiltshire, marion Bamford | CTS Heritage | Nala Environmental (Pty) Ltd | 08/06/2022 - 11:46 | |
HIA-KonkoonsiesII | Heritage Impact Assessment for the proposed 132 kV power line and substation at the Konkoonsies II SEF. | Heritage Impact Assessment Specialist Reports | 16/08/2015 | Jayson Orton | ASHA Consulting(Pty) Ltd | Savannah Environmental (Pty) Ltd | 20/10/2015 - 07:51 | |
HIA-New Largo EMPr amendment | NEW LARGO COAL PROJECT: EMPr AMENDMENT – UPDATED PHASE 1 CULTURAL HERITAGE IMPACT ASSESSMENT | Heritage Impact Assessment Specialist Reports | 31/07/2020 | J.A. van Schalkwyk | New Largo Coal (Pty) Ltd | 26/11/2020 - 11:13 | ||
Heritage Impact Assessment for Lyra 2 Solar Park | Heritage Impact Assessment for the proposed renewable energy generation projects by Cygnis Energy (Pty) Ltd (Lyra 2 Solar Park) on Farm Groot Vogelstruisfontein 644 LQ with overhead powerlines to the Eskom Matimba Substation and/or to the Eskom Waterberg Distribution Substation, within the Lephalale Local Municipality, Waterberg District Municipality, Limpopo Province | Heritage Impact Assessment Specialist Reports | 23/03/2023 | Jaco van der Walt | Beyond Heritage | 19/05/2023 - 12:30 | ||
HIA report Road D1480 Borrow Pits at Mafiyane, Mogabane & Pashaskraal | Phase 1 Heritage Impact Assessment Report. Road D1480: Borrow Pits at Mafiyane, Mogabane & Pashaskraal. Greater Sekhukhune District Municipality. | Heritage Impact Assessment Specialist Reports | 14/12/2022 | Frans Roodt | Gudani Consulting | 14/12/2022 - 17:24 | ||
Hyperion PV2 - HIA 27.03.19 | Heritage Impact Assessment:Proposed Hyperion Solar Development 2, Lyndoch 432/Rem, Kuruman Magisterial District, Northern Cape | Heritage Impact Assessment Specialist Reports | 27/03/2019 | Jayson Orton | ASHA Consulting(Pty) Ltd | Savannah Environmental (Pty) Ltd | 05/04/2019 - 09:20 | |
Vryburg Solar 3 Heritage Report | Cultural Heritage Impact Assessment for the Proposed Development of a 100 MW AC (115 MW DC) Solar Photovoltaic Facility (Vryburg Solar 3) and Associated 132kV Transmission Line near Vryburg, North West Province | Heritage Impact Assessment Specialist Reports | 03/08/2018 | J.A. van Schalkwyk | 16/08/2018 - 16:18 | |||
HIA | Heritage Impact Assessment for the Proposed Township Development outside Bloemfontein in the Mangaung Metropolitan Municipality in the Free State Province. Situated on a Portion of the Farm Klipfontein 716 and the Farm Ceres 626. | Heritage Impact Assessment Specialist Reports | 19/07/2019 | Stephan Gaigher | G&A Heritage Management Consultants | G&A Heritage Management Consultants | 10/11/2020 - 11:11 | |
Xha! Boom Heritage Impact Assessment Report | !Xhaboom Wind Energy Facility (WEF) Heritage Impact Report | Heritage Impact Assessment Specialist Reports | 05/10/2017 | Wouter Fourie | PGS Heritage (Pty) Ltd | Sivest - Gauteng | 14/11/2017 - 09:51 | |
Ilanga Lethemba Heritage Impact Assessment Report | Ilanga Lethemba PV Solar Energy Facility | Heritage Impact Assessment Specialist Reports | 12/09/2011 | David Morris | Solar Capital | 16/11/2018 - 00:30 | ||
SNM Desktop | A desktop heritage impact assessment report for the Sylvania Northern Mining prospecting rights application on various farms in the Mokopane Magisterial District of the Limpopo Province | Heritage Impact Assessment Specialist Reports | 03/10/2022 | Anton Pelser | APELSER ARCHAEOLOGICAL CONSULTING | 28/11/2022 - 07:53 | ||
CULTURAL HERITAGE IMPACT ASSESSMENT OF THE PROPOSED EXTENSION OF THE EMONDLO. ST JAMES AND LEKSAND SUBSTATION YARDS | CULTURAL HERITAGE IMPACT ASSESSMENT OF THE PROPOSED EXTENSION OF THE EMONDLO. ST JAMES AND LEKSAND SUBSTATION YARDS, INCLUDING THE RECONSTRUCTION OF THE EXISTING LEKSAND-ST JAMES 88/22kV POWERLINE AND THE CONSTRUCTION OF THE NEW EMONDLO-ST JAMES 88/22kV POWERLINE | Heritage Impact Assessment Specialist Reports | 26/04/2012 | Frans Prins | Active Heritage CC | Kerry Seppings Environmental Management | 09/09/2013 - 16:21 | |
HOEKPAN EDEN FAURESMITH | FIRST PHASE ARCHAEOLOGICAL & HERITAGE ASSESSMENT OF THE PROPOSED DIAMOND PROSPECTING AT HOEKPAN 942 & EDEN 893 NEAR PETRUSBURG, IN THE FAURESMITH DISTRICT | Heritage Impact Assessment Specialist Reports | 10/09/2014 | Cobus Dreyer | De Beers Consolidated Mines (Pty) Ltd | De Beers Consolidated Mines (Pty) Ltd | CTS_175153 | 18/09/2014 - 22:03 |
HIA | Heritage Impact Assessment | Heritage Impact Assessment Specialist Reports | 18/07/2016 | Eric Ndivhuho Mathoho | 28/10/2016 - 13:05 | |||
Mukondeleli 132kV HIA | Heritage Impact Assessment: Proposed Mukondeleli Grid Connection Near Secunda, Mpumalanga | Heritage Impact Assessment Specialist Reports | 02/12/2022 | Jayson Orton | ASHA Consulting(Pty) Ltd | WSP Group Africa (Pty) Ltd | 09/02/2023 - 15:47 | |
HIA report Proposed development of a shopping centre and filling station in Namakgale | Heritage Impact Assessment Report. Proposed development of a Shopping Centre and a Filling Station in Namakgale on the Portion Of The Remaining Extent of the farm Makushane Location 28-Lu within Ba-Phalaborwa Local Municipality of Mopani District, Limpopo Province. | Heritage Impact Assessment Specialist Reports | 20/10/2020 | Frans Roodt | Phaki Phakanani | 20/10/2020 - 06:37 | ||
Heritage Comparative Assessment for the Existing 765kV Gamma Substation and Associated Powerline Turn-in Infrastructure, located on Farms Uit Vlugt Fontein No.265 and Schietkuil No.3 | Part 2 Amendment Application for the Existing 765kV Gamma Substation and Associated Powerline Turn-in Infrastructure, located on Farms Uit Vlugt Fontein No.265 and Schietkuil No.3, Western and Northern Cape Provinces. | Heritage Impact Assessment Specialist Reports | 27/03/2023 | Nikki Mann | PGS Heritage (Pty) Ltd | PGS Heritage (Pty) Ltd | 18/04/2023 - 12:10 | |
NAM3428_IPP_HIA | Heritage Impact Assessment: Namane Generation Independent Power Producer and Transmission Line Project, Lephalale, Limpopo Province | Heritage Impact Assessment Specialist Reports | 29/02/2016 | Justin du Piesanie, Johan Nel | Digby Wells Environmental | Namane Generation (Pty) Ltd | 12/05/2016 - 11:44 | |
HIA Springfield | HIA for Springfield Coal Mining Project situated between Vereeniging and Meyerton, in the Sedibeng District Municipality, Gauteng Province. | Heritage Impact Assessment Specialist Reports | 17/11/2020 | Jennifer Kitto | PGS Heritage (Pty) Ltd | 08/06/2021 - 11:26 | ||
HIA and PIA | L20 EXT_Geluksburg_Near Bergville_HIA&PIA | Heritage Impact Assessment Specialist Reports | 09/07/2017 | Frans Prins | Active Heritage CC | Active Heritage CC | 13/07/2017 - 09:41 | |
IDC Frankfort Paper Mill Heritage Report | A REPORT ON A CULTURAL HERITAGE IMPACT ASSESSMENT FOR THE PROPOSED THE FRANKFORT PAPER MILL PROJECT, FREE STATE PROVINCE | Heritage Impact Assessment Specialist Reports | 30/09/2013 | Anton van Vollenhoven | Industrial Development Corporation of Southern Africa | 11/02/2016 - 13:07 | ||
Umnini housing | HIA FOR THE PROPOSED UMNINI RURAL HOUSING PROJECT, KZN | Heritage Impact Assessment Specialist Reports | 11/04/2023 | Gavin Anderson, Alan Smith | Umlando: Archaeological Surveys & Heritage Management | Delta Built Environment Consultants (Pty) Ltd | 19/07/2023 - 11:10 | |
Heritage Impact Assessment - Rheboksfontein PL | Heritage Impact Assessment: Proposed Construction of a 132 kV Power Line from the Rheboksfontein Wind Energy Facility to the Aurora Substation, Western Cape Province | Heritage Impact Assessment Specialist Reports | 16/11/2015 | Lita Webley | ACO Associates CC | Savannah Environmental (Pty) Ltd | 11/02/2016 - 16:46 | |
Desktop Cultural Heritage Assessment: Farm Klein Torquay 249, Bondeo 140 CC | Desktop Cultural Heritage Assessment: Prospecting Right Application to prospect for Diamonds Alluvial (DA), Diamonds General (D) near Douglas on the Remaining Extent and the Remaining Extent of Portion 1 of the farm Klein Torquay 249, Siyancuma Local Municipality, Pixley ka Seme District Municipality, Northern Cape Province. | Heritage Impact Assessment Specialist Reports | 21/06/2023 | Francois P Coetzee | 19/07/2023 - 14:22 | |||
HIA Obisini Gravel Road | Proposed construction of 7.6 km gravel road in Obisini Village on the Farm Qamu Location 17484 Msinga LM, Mzinyathi District DM, KwaZulu-Natal. | Heritage Impact Assessment Specialist Reports | 31/03/2017 | Len van Schalkwyk | eThembeni Cultural Heritage | Magalela & Associates (Pty) Ltd | 12/04/2017 - 12:18 | |
Zonnebloem HIA - Mar'18 | Heritage Impact Assessment Report for the Construction of the Zonnebloem Switching Station (132/22kv) and Two Loop-In Loop-Out Power Lines (132kV), Middelburg, Mpumalanga Province. | Heritage Impact Assessment Specialist Reports | 27/03/2018 | Jaco van der Walt | Heritage Contracts and Archaeological Consulting | Savannah Environmental (Pty) Ltd | 13/04/2018 - 11:40 | |
Proposed Ezakheni AutoHub | Proposed Construction of Ezakheni AutoHub on Erf 1923 Ezakheni D Section, Emnambithi-Ladysmith Municipality, UThukela District, KwaZulu-Natal | Heritage Impact Assessment Specialist Reports | 27/05/2015 | Frans Prins | Active Heritage CC | Active Heritage CC | 08/06/2015 - 09:23 | |
JAKHALSFONTEIN 146, DE AAR | FIRST PHASE ARCHAEOLOGICAL & HERITAGE ASSESSMENT OF THE PROPOSED PV SOLAR ENERGY FACILITIES ON THE FARM JAKHALSFONTEIN 146, DE AAR, NORTHERN CAPE | Heritage Impact Assessment Specialist Reports | 24/10/2014 | Cobus Dreyer | Eco-compliance | Eco-compliance | 27/10/2014 - 22:02 | |
INGLESBY 580 OLIFANTSHOEK | FIRST PHASE ARCHAEOLOGICAL & HERITAGE INVESTIGATION OF THE PROPOSED MINE PROSPECTING AT THE REMAINING EXTENT OF THE FARM INGLESBY 580 NEAR OLIFANTSHOEK, NORTHERN CAPE PROVINCE | Heritage Impact Assessment Specialist Reports | 10/05/2014 | Cobus Dreyer | 15/06/2014 - 16:23 | |||
Proposed Installation of Four Underground Tanks on Erf 854 in Thohoyandou-P Ext 1 | Heritage Impact Assessment for the Proposed Installation of Four Underground Tanks on Erf 854 in Thohoyandou-P Ext 1, Thulamela Local Municipality, Limpopo Province. | Heritage Impact Assessment Specialist Reports | 27/06/2016 | Marko Hutten | Hutten Heritage Consultants | Tekplan Environmental | 07/07/2016 - 18:01 | |
Palmietkuilen 241 IR MRA HIA | Heritage Impact Assessment: Application for a Mining Right and Environmental Authorisation of the proposed Palmietkuilen Mine, Gauteng Province | Heritage Impact Assessment Specialist Reports | 31/10/2017 | Justin du Piesanie | Digby Wells Environmental | Anglo Operations (Pty) Ltd | 31/03/2017 - 11:28 | |
HIA for Proposed upgrades to Maropeng | Basic Heritage Impact Assessment for the proposed upgrades to the Maropeng Interpretive Centre | Heritage Impact Assessment Specialist Reports | 20/11/2014 | Dominic Stratford | 08/05/2015 - 14:17 | |||
HIA for the proposed Tirisano PV Solar Power Project | HIA for the proposed Tirisano PV Solar Power Project | Heritage Impact Assessment Specialist Reports | Johnny Van Schalkwyk | Subsolar Energy | 28/03/2020 - 08:03 | |||
Leliehoek Heritage and Palaeontology walkdown reports | 1) PRECONSTRUCTION ARCHAEOLOGICAL SURVEY OF THE MAINSTREAM KENTANI SUITE PV PROJECTS (SONOBLOMO), DEALESVILLE, FREE STATE 2) PALAEONTOLOGICAL WALKDOWN, SONOBLOMO PV PROJECT | Heritage Impact Assessment Specialist Reports | 13/08/2022 | Jayson Orton, Elize Butler | ASHA Consulting(Pty) Ltd, Banzai Environmental (Pty) Ltd | SLR Consulting (South Africa) (Pty) Ltd | 01/12/2022 - 15:55 | |
Springhaas Line 5 Heritage Impact Assessment | Heritage Impact Assessment: Proposed Powerlines From Springhaas Solar Facility 6 To Collector Substation B Within The Proposed Springhaas Grid Connection Corridor Near Dealesville In The Free State Province | Heritage Impact Assessment Specialist Reports | 20/06/2022 | Jayson Orton | ASHA Consulting(Pty) Ltd | ABO Wind Renewable Energies (Pty) Ltd | 19/09/2022 - 14:44 | |
Heritage Impact Assessment (Summerpride) | Heritage Impact Assessment Specialist Reports | Gary Minkley | 09/04/2015 - 09:23 | |||||
HIA Telkom Underground Cables, KZN | CULTURAL HERITAGE IMPACT ASSESSMENT OF THE PROPOSED ESTABLISHMENT OF A NEW UNDERGROUND CABLE, CROSSING TWO WATERCOURSES, ON THE FARM LOT K 52 NO. 16721 AND PORTION 1 (REMAINING EXTENT) OF THE FARM COMBINE NO. 13220, LOCATED NEAR KWAMBONAMBI, UTHUNGULU DISTRICT MUNICIPALITY, KWAZULU-NATAL | Heritage Impact Assessment Specialist Reports | 30/04/2015 | Frans Prins | Active Heritage CC | 08/09/2015 - 14:54 | ||
Phezukomoya Split 1 HIA and Walkthrough Report | Heritage Impact Assessment Specialist Reports | John Gribble | ACO Associates CC | Arcus Consulting | 27/09/2019 - 14:17 | |||
EC-KZN Group 2 Heritage Report | Heritate assessment of Group 2 Sites of the proposed EC-KZN Afforestation EIA | Heritage Impact Assessment Specialist Reports | 20/07/2017 | Len van Schalkwyk | eThembeni Cultural Heritage | Sigwela and Associates | 17/02/2019 - 02:18 | |
Parliamentary Precinct Security Upgrades | PARLIAMENTARY PRECINCT SECURITY UPGRADES Road Reserve Bouquet Street, Road Reserve Lelie Lane, Erf 3740 Parliament, Erf 95164 Parliament, Erf 7723 Parliament Street, Erf 95183 Gallery Lane, Re erf 3805 off Plein Street Belvedere House situated on Erf 95187, Corner of Bouquet Street and St John’s Road CITY OF CAPE TOWN, GARDENS | Heritage Impact Assessment Specialist Reports | 17/06/2020 | Sarah Winter | Sarah Winter Heritage Practitioner | Coega Development Corporation (Pty) Ltd | 25/07/2020 - 12:45 | |
Residential Developemnt at the Old Dairy Site, Hilton College | Cultural Heritage Impact Assessment of the Proposed Establishment of a Residential Development atht he Old Dairy Site, Hilton College, Umngeni Local Municipality, KZN | Heritage Impact Assessment Specialist Reports | 12/10/2016 | Frans Prins | Active Heritage CC | Terratest (Pty) Ltd | 17/07/2017 - 11:02 | |
Dannhauser Cemetery HIA | PROPOSED CEMETERY FOR THE DANNHAUSER LOCAL MUNICIPALITY, KWAZULU-NATAL Phase 1 Heritage Impact Assessment | Heritage Impact Assessment Specialist Reports | 31/05/2021 | Jean Beater | JLB Consulting | SiVEST SA (Pty) Ltd | 03/12/2021 - 12:08 | |
HIA Screener | Proposed Springbok Wind Energy Facility: Application for Extension of the Environmental Authorisation | Heritage Impact Assessment Specialist Reports | 28/02/2023 | Savannah Environmental (Pty) Ltd | 24/07/2023 - 13:32 | |||
EXX3666 - NID | Notification of Intent to Develop: EXXARO COAL (PTY) LTD GROOTEGELUK COAL MINE SHORT-TERM STOCKPILE AMENDMENT PROJECT | Heritage Impact Assessment Specialist Reports | 06/10/2016 | Justin du Piesanie | Digby Wells Environmental | Exxaro Resources | 06/10/2016 - 13:59 |