FindReports

THIS IS THE ARCHIVE FOR SAHRIS 1.0


THIS SITE IS NOW AN ARCHIVE AND IS NOT SUITABLE FOR MAKING APPLICATIONS

Please be aware that no content and application creation or changes to information on this version of SAHRIS will be retained.

To make applications or utilise SAHRIS for the creation of information, please use the new site:

https://sahris.org.za

Changes to SAHRIS!

The South African Heritage Resources Information System (SAHRIS) has undergone a generational upgrade and restructure. These changes to the site include, but are not limited to:

  • A new & modernised look and layout
  • Improved site usage flows with respect to applications and content creation
  • Improved site performance and stability

Launch for the new version of SAHRIS occurred on Monday the 30th of October 2023.

The new site can be found here:

SAHRIS | SAHRIS

Advanced options
ReportRef ReportTitle ReportTypesort descending ReportDate Authors AuthoringBody CommissioningCompany MapID < 2009 Post date
Zamazama Filling Station HIA Heritage Impact Assessment Specialist Reports Frans Prins Active Heritage CC 24/06/2022 - 09:45
HIA D3 Power Line and Substation Proposed construction of a 132kV power line, substation and the extension of Homestead substation associated with the 75mw Concentrating Photovoltaic (CPV) / Photovoltaic (PV) plant (PV3) on the farm Droogfontein in Kimberley, Northern Cape Province: Heritage Impact Assessment Heritage Impact Assessment Specialist Reports 25/04/2013 Wouter Fourie 22/05/2013 - 10:56
HIA - H2Energy (Oct'17) Heritage Impact Assessment for the H2 Energy Power Station, Mpumalanga Province Heritage Impact Assessment Specialist Reports 09/10/2017 Jaco van der Walt Heritage Contracts and Archaeological Consulting Savannah Environmental (Pty) Ltd 12/10/2017 - 14:56
Paleo - Pongola Desktop Palaeontological Heritage Impact Assessment Report on the site of a Proposed Solar Power Production Facility known as the Pongola Solar Energy Facility to be located on Portion 260 of the Farm Pongola 61, Kwazulu Natal Province Heritage Impact Assessment Specialist Reports 16/07/2014 Barry Millsteed BM Geological Services Savannah Environmental (Pty) Ltd 25/07/2014 - 09:08
Impala SPP HIA Impala Solar Power Plant Heritage Impact Assessment Heritage Impact Assessment Specialist Reports Johnny van Schalkwyk 02/06/2021 - 12:41
HIA - Clayville (Jun 2018) Heritage Impact Assessment for the Clayville Thermal Plant in the Clayville Industrial Area, Gauteng Province Heritage Impact Assessment Specialist Reports 08/06/2018 Jaco van der Walt Heritage Contracts and Archaeological Consulting Savannah Environmental (Pty) Ltd 27/06/2018 - 10:27
PROPOSED RESIDENTIAL DEVELOPMENT AND ASSOCIATED INFRASTRUCTURE ON A 200 HA PORTION OF THE FARM BESTWOOD 429 RD HERITAGE IMPACT ASSESSMENT REPORT: PROPOSED RESIDENTIAL DEVELOPMENT AND ASSOCIATED INFRASTRUCTURE ON A 200 HA PORTION OF THE FARM BESTWOOD 429 RD AT KATHU, NORTHERN CAPE PROVINCE Heritage Impact Assessment Specialist Reports 03/09/2008 Robert de Jong Cultmatrix CC Rock Environmental Consulting (Pty) Ltd 18/12/2013 - 09:18
ILI3864 - Distribution Powerlines NDA Needs and Desirability Application Form for the Eskom Northern KZN Strengthening Project - Distribution Powerlines Heritage Impact Assessment Specialist Reports 08/06/2018 Justin du Piesanie Digby Wells Environmental Eskom Holdings SOC Limited 08/06/2018 - 12:17
Heritage Impact Assessment for Phenyane to Obhazweni Road Heritage Impact Assessment of the proposed ward 15 Phenyane to Obhazweni Road, Nongoma Municipality in northern KwaZulu-Natal Heritage Impact Assessment Specialist Reports 24/06/2014 Frans Prins Active Heritage CC Nongoma Local Municipality 28/06/2014 - 22:53
Braklaagte Heritage and Palaeontogy walkdown reports PRECONSTRUCTION ARCHAEOLOGICAL SURVEY OF THE MAINSTREAM KENTANI SUITE PV PROJECTS (BRAKLAAGTE), DEALESVILLE, FREE STATE Heritage Impact Assessment Specialist Reports 13/08/2022 Jayson Orton, Elize Butler ASHA Consulting(Pty) Ltd, Banzai Environmental (Pty) Ltd SLR Consulting (South Africa) (Pty) Ltd 01/12/2022 - 02:53
Updated Graskoppies Grid Heritage Impact Assessment Report 2 Graskoppies Wind Energy Facility (WEF) – 132kV Grid connection and substation Heritage Impact Report Heritage Impact Assessment Specialist Reports 20/02/2018 Wouter Fourie PGS Heritage (Pty) Ltd Sivest - Gauteng 20/03/2018 - 13:43
Ergo's proposed reclamation of the City Deep Dumps. Heritage Impact Assessment for Ergo's proposed reclamation of the City Deep Dumps, City of Johannesburg. Heritage Impact Assessment Specialist Reports 03/12/2018 Ilan Smeyatsky PGS Heritage (Pty) Ltd Kongiwe Environmental (Pty) Ltd 04/04/2019 - 14:57
DEPLOYMENT OF A FIBRE NETWORK WITHIN THE SOL PLAATJE MUNICIPAL AREA REDUCED SCALE DEPLOYMENT OF A FIBRE NETWORK WITHIN THE SOL PLAATJE MUNICIPAL AREA REDUCED SCALE (JULY 2021) REV 1 Heritage Impact Assessment Specialist Reports 22/07/2021 christine havenga Frogfoot Networks 18/07/2021 - 19:59
1518 HIA Eskom Gamohaan Heritage Impact Assessment report for the Eskom Gamohaan – Seven Miles 22kV Powerline Heritage Impact Assessment Specialist Reports 08/09/2022 Michelle Sachse PGS Heritage (Pty) Ltd Environmental Impact Management Services (Pty) Ltd 07/10/2022 - 12:22
82 MAZISI KUNENE ROAD Proposed Internal Alterations to Life St Joseph's Psychology Facility. Heritage Impact Assessment Specialist Reports 13/02/2023 Wayne Allen BVA Architects BVA Architects 13/02/2023 - 16:25
ILI3864 - Iphiva-Duma NDA Needs and Desirability Application Form for the Eskom Northern KZN Strengthening Project Iphiva-Duma 400 kV Powerline Heritage Impact Assessment Specialist Reports Justin du Piesanie Digby Wells Environmental Eskom Holdings SOC Limited 13/11/2017 - 15:35
usuthu Dam HIA HERITAGE SURVEY OF THE PROPOSED USUTHU DAM, NONGOMA-NATAL Heritage Impact Assessment Specialist Reports 31/10/2018 Gavin Anderson Umlando: Archaeological Surveys & Heritage Management Enviroedge 11/07/2019 - 11:07
Riverside Cemetery HIA Riverside Cemetery HIA Heritage Impact Assessment Specialist Reports 01/01/2014 Jean Beater Active Heritage CC Enviroedge 16/04/2015 - 15:41
Springhaas Collector Substation A Heritage Impact Assessment Heritage Impact Assessment for the proposed construction and operation of Springhaas Collector Substation A Heritage Impact Assessment Specialist Reports 11/06/2022 Jayson Orton ASHA Consulting(Pty) Ltd ABO Wind Renewable Energies (Pty) Ltd 19/09/2022 - 08:59
Davel Project A Phase I Heritage Impact assessment study for the proposed Davel Project near Bethal in the Mpumalanga Province Heritage Impact Assessment Specialist Reports 01/11/2017 Julius CC Pistorius Jaco K Consulting 21/02/2018 - 17:39
132kv John Dube HIA Report Phase1 Heritage Impact Assessment Report for proposed 132kv ±4km powerline for John Dube Ext 1 Development within City of Ekurhuleni Metropolitan Municipality, Gauteng Heritage Impact Assessment Specialist Reports 13/11/2018 Trust Mlilo Integrated Specialist Services (Pty) Ltd 06/03/2019 - 11:11
Heritage IA Heritage Impact Assessment Specialist Reports 10/07/2013 ACO Associates CC ACO Associates CC 11/11/2013 - 16:16
HIA, upgrade to N7, Section 4 from Trawal to Vanrhynsdorp Heritage Impact Assessment: Proposed upgrade to National Route 7, Section 4 from Trawal to Vanrhynsdorp, Western Cape. Case # 2020 Heritage Impact Assessment Specialist Reports 01/10/2012 Dave Halkett ACO Associates CC SiVEST SA (Pty) Ltd CTS_503786 20/04/2018 - 13:44
HIA Copper Mines Namakwaland HERITAGE IMPACT ASSESSMENT: PROPOSED REOPENING OF THREE COPPER MINES AT CONCORDIA, NAMAKWALAND MAGISTERIAL DISTRICT, NORTHERN CAPE Heritage Impact Assessment Specialist Reports 04/11/2019 Jayson Orton ASHA Consulting(Pty) Ltd ASHA Consulting(Pty) Ltd 19/10/2020 - 09:18
HIA-KonkoonsiesII Heritage Impact Assessment for a Proposed 132kV Power Line and Substation at the Konkoonsies II SEF, Kenhardt Magisterial District, Northern Cape Province Heritage Impact Assessment Specialist Reports 16/08/2015 Jayson Orton ASHA Consulting(Pty) Ltd Savannah Environmental (Pty) Ltd 01/09/2015 - 11:20
Vygenhoek HIA Heritage Impact Assessment Specialist Reports Jaco van der Walt Department of Mineral Resources - Mpumalanga 07/06/2021 - 12:29
MURUNWA VODACOM TELEMAST, LIMPOPO PROVINCE. PROPOSED CONSTRUCTION OF THE BONISWA SITE 2021, MURUNWA VODACOM TELEMAST, LIMPOPO PROVINCE. Heritage Impact Assessment Specialist Reports 16/03/2022 Stephan Gaigher Tekplan Environmental 30/03/2022 - 12:30
CHMP Umsobomvu Cultural Heritage Resources Management Plan for the Proposed Mining Area of the Umsobomvu Coal Mine Close to Dundee,KwaZulu-Natal Province Heritage Impact Assessment Specialist Reports Anton van Vollenhoven Archaetnos CC Umsobomvu Coal (Pty) Ltd 19/06/2015 - 11:22
MMTS 2 Heritage Impact assesment Mooi Mgeni Transfer Scheme Phase 2 Heritage Impact Assesment Report Heritage Impact Assessment Specialist Reports 08/07/2012 Gavin Anderson Coastal & Environmental Services - Grahamstown Trans Caledon Tunnel Authority 13/01/2014 - 10:38
HIA Camden I WEF 132kV Grid Connection Heritage Impact Assessment for the proposed Camden I Wind Grid Connection, Mpumalanga Province Heritage Impact Assessment Specialist Reports 02/05/2022 Jaco van der Walt Beyond Heritage WSP Group Africa (Pty) Ltd 11/05/2023 - 14:01
HERITAGE IMPACT ASSESSMENT OF REM OF THE FARM BIGGS HERITAGE IMPACT ASSESSMENT OF REM OF THE FARM BIGGS NO 14762, GREYTOWN ROAD, KWAZULU-NATAL, SOUTH AFRICA Heritage Impact Assessment Specialist Reports 16/07/2018 eThembeni Cultural Heritage 26/08/2021 - 09:38
N2 Kwabhoboza Interchange HERITAGE SURVEY OF THE PROPOSED KWABHOBOZA INTERCHANGE ON NATIONAL ROUTE 2 SECTION 30 (KM 5.1) MTUBATUBA, KWA-ZULU NATAL Heritage Impact Assessment Specialist Reports 01/09/2012 Gavin Anderson Umlando: Archaeological Surveys & Heritage Management Afzelia Environmental Consultants Pty Ltd 16/07/2013 - 14:33
Wildebeeskuil 5MW Solar PV Power Plant Heritage Report Wildebeestkuil 59 5MW Solar Photovoltaic (PV) Power Plant Heritage Impact Report Heritage Impact Assessment Specialist Reports 10/11/2016 Wouter Fourie PGS Heritage and Grave Relocation Consultants Sivest - Gauteng 16/11/2016 - 17:22
2002_SRK 305804 EMPR Addendum_Heritage Study A cultural Heritage Impact Assessment for the Proposed new open pit for PPRust on the farm Zwartfontein 818LR in the Northern Province of Soutg Africa. Amendment to the PPRust Environmental Management Programme Report Heritage Impact Assessment Specialist Reports Julius CC Pistorius Dr Julius CC Pistorious Archaeologist and heritage Consultant 25/11/2019 - 10:13
COP6679 - NID Notification of Intent to Develop - Environmental Authorisation Process for the Expansion of the Copper Sunset Mining Right Area Heritage Impact Assessment Specialist Reports 02/03/2021 Shannon Hardwick, Justin du Piesanie Digby Wells Environmental Copper Sunset Sand (Pty) Ltd 02/03/2021 - 19:49
Ixopo Railway Station Heritage Impact Assessment of the old railway shed situated on the site of the taxi rank, Ixopo, Sisonke District Municipality Heritage Impact Assessment Specialist Reports 20/09/2013 Deborah Whelan Archaic Consulting Sivest - PMB 23/09/2013 - 08:29
Desktop Heritage Impact Assessment Report Blue Lounge Trading 107 (Pty) Ltd: Prospecting Activities, Desktop Heritage Impact Assessment Report, September 2019 Heritage Impact Assessment Specialist Reports 06/09/2019 Stephan Gaigher G&A Heritage Management Consultants 20/07/2021 - 15:33
AMITOFO CARE CENTRE EDENPARK BLOEMFONTEIN FIRST PHASE ARCHAEOLOGICAL & HERITAGE ASSESSMENT OF THE AMITOFO CARE CENTRE AT EDENPARK / MANDELA VIEW ALONG THE N8, THABA NCHU-BLOEMFONTEIN Heritage Impact Assessment Specialist Reports 17/04/2015 Cobus Dreyer Iliso Consulting (Pty) Ltd Iliso Consulting (Pty) Ltd 27/05/2015 - 20:34
Weltevreden Prospecting right application HIA HERITAGE IMPACT ASSESSMENT FOR A DIAMOND PROSPECTING RIGHT APPLICATION Viljoenskroon and Bothaville District, Free State Province Heritage Impact Assessment Specialist Reports 21/08/2018 Elijah Dumisani Katsetse DKNR Consulting (Pty) Ltd 21/08/2018 - 18:55
Heritage Impact Assessment (Nov'21) Appendix I - Heritage Impact Assessment Heritage Impact Assessment Specialist Reports 11/11/2021 Cherene de Bruyn PGS Heritage (Pty) Ltd Savannah Environmental (Pty) Ltd 12/11/2021 - 08:53
Baltimore MRA A DESKTOP HERITAGE IMPACT ASSESSMENT REPORT FOR THE MADITSE INVESTMENTS (PTY) LTD MINING RIGHTS APPLICATION ON THE FARMS TABANA 133LR, BOEKENHOUTFONTEIN 108LR & PRAIRIE 107LR LEPHALALE LOCAL MUNICIPAL AREA, LIMPOPO PROVINCE - APAC022/68 Heritage Impact Assessment Specialist Reports 21/07/2022 Anton Pelser APELSER ARCHAEOLOGICAL CONSULTING Gudani Consulting 22/07/2022 - 08:06
Nzalo DBAR Heritage Report Phase One Heritage Impact Assessment Of The Proposed Coal-Link, Nzalo (Mqabe) Near Vryheid, Kzn. Heritage Impact Assessment Specialist Reports 21/02/2014 Frans Prins Sivest - Gauteng 22/04/2015 - 10:45
Springhaas Line 3 Heritage Impact Assessment Heritage Impact Assessment: Proposed Powerlines from Springhaas Solar Facility 4 to Collector Substation A within the proposed Springhaas grid connection near Dealesville in the Free State Province Heritage Impact Assessment Specialist Reports 20/06/2022 Jayson Orton ASHA Consulting(Pty) Ltd ABO Wind Renewable Energies (Pty) Ltd 19/09/2022 - 13:23
Phezukomoya HIA v2 with images HERITAGE IMPACT ASSESSMENT FOR THE PROPOSED PHEZUKOMOYA WIND ENERGY FACILITY TO BE SITUATED IN THE NORTHERN CAPE. Heritage Impact Assessment Specialist Reports 27/02/2018 Tim Hart ACO Associates CC Arcus Consulting 28/02/2018 - 11:16
HIA FOR THE PROPOSED KOMSBERG EAST AND WEST WIND ENERGY FACILITIES AND ASSOCIATED GRID CONNECTIONS (SHARED) HERITAGE IMPACT ASSESSMENT FOR THE PROPOSED KOMSBERG EAST AND WEST WIND ENERGY FACILITIES AND ASSOCIATED GRID CONNECTIONS (SHARED) Heritage Impact Assessment Specialist Reports 15/11/2015 Timothy Hart ACO Associates CC Arcus Consulting 18/05/2016 - 10:40
HIA for the Padloper EGI 4, NC & WC HERITAGE IMPACT ASSESSMENT: BASIC ASSESSMENT FOR THE PROPOSED DEVELOPMENT OF A 132 KV OVERHEAD POWER LINE AND ASSOCIATED INFRASTRUCTURE BETWEEN THE PROPOSED PADLOPER SOLAR 4 AND THE PROPOSED AUTHORISED ISHWATI EMOYENI COLLECTOR SUBSTATION (i.e., PADLOPER EGI 4), NEAR MURRAYSBURG, MURRAYSBURG MAGISTERIAL DISTRICT, WESTERN CAPE AND RICHMOND MAGISTERIAL DISTRICT, NORTHERN CAPE Heritage Impact Assessment Specialist Reports 08/09/2023 Jayson Orton ASHA Consulting(Pty) Ltd African Clean Energy Developments (Pty) Ltd 27/09/2023 - 15:11
The proposed upgrade of the Leeuwkuil Wastewater Treatment conveyances, Gauteng Province, South Africa Heritage Impact Assessment for the proposed upgrade of the Leeuwkuil Wastewater Treatment conveyances, Gauteng Province, South Africa Heritage Impact Assessment Specialist Reports 01/07/2022 Lara Lucija Kraljević SAHRA Council Beyond Heritage 31/08/2022 - 20:05
Proposed Construction of the Lodge Uitval and Conference Centre Heritage Survey of the proposed Uitval Lodge & Conference Centre, KwaZulu - Natal Heritage Impact Assessment Specialist Reports 17/09/2018 Gavin Anderson Umlando: Archaeological Surveys & Heritage Management Sesizwile Transport and General Services 24/09/2018 - 09:20
Makhoba HIA Heritage Impact Assessment for the Proposed Development of the Makhoba Cemetery with in Kokstad, Greater Kokstad Local Municipality, KwaZulu-Natal Heritage Impact Assessment Specialist Reports 15/12/2020 Roy Muroyi Tsimba Archaeological Footprints (Pty) Ltd Hanslab (Pty) Ltd 17/03/2021 - 13:19
Proposed Balfour FET College Phase1 Heritage Impact Assessment for the Proposed Further Education Training (FET) College in Balfour. Heritage Impact Assessment Specialist Reports 25/10/2013 Makhosazana Mngomezulu 25/10/2013 - 12:37

Pages

CSV
 
 