THIS IS THE ARCHIVE FOR SAHRIS 1.0
THIS SITE IS NOW AN ARCHIVE AND IS NOT SUITABLE FOR MAKING APPLICATIONS
Please be aware that no content and application creation or changes to information on this version of SAHRIS will be retained.
To make applications or utilise SAHRIS for the creation of information, please use the new site:
https://sahris.org.za
Changes to SAHRIS!
The South African Heritage Resources Information System (SAHRIS) has undergone a generational upgrade and restructure. These changes to the site include, but are not limited to:
- A new & modernised look and layout
- Improved site usage flows with respect to applications and content creation
- Improved site performance and stability
Launch for the new version of SAHRIS occurred on Monday the 30th of October 2023.
The new site can be found here:
SAHRIS | SAHRIS
Displaying 17901 - 17950 of 18975
ReportRef | ReportTitle | ReportType | ReportDate | Authors | AuthoringBody | CommissioningCompany | Post date |
---|---|---|---|---|---|---|---|
Integrated Cultural Resources Management Study for the proposed Mfolozi-Mbewu 765KV Transmission Line | Integrated Cultural Resources Management Study and HIA for the proposed Mfolozi-Mbewu 765KV Transmission Line, Zululand and King Cetshwayo District Municipality, KwaZulu-Natal. | Heritage Impact Assessment Specialist Reports | 20/12/2018 | Cherene de Bruyn | MOKGOPE CONSULTING CC | 20/12/2018 - 13:37 | |
Heritage Impact Assessment for the proposed Aggeneys Wind and Solar Facility | Heritage Impact Assessment for the proposed Aggeneys Wind and Solar Facility | Heritage Impact Assessment Specialist Reports | 01/09/2022 | Jaco van der Walt | Beyond Heritage | Enviro-Insight CC | 07/11/2022 - 09:17 |
Dalpark Shopping Centre | Heritage Impact Assessment for the Proposed Dalpark Shopping Centre, Gauteng Province | Heritage Impact Assessment Specialist Reports | 30/06/2021 | Jaco van der Walt | HCAC Heritage Consultants | Mills and Otten Environmental Consultants | 11/08/2021 - 15:18 |
Heritage Impact Assessment FOR KHUMANI IRON ORE MINE NEW WATER RETURN DAM, PIPELINES AND WATER CONTAINMENT FACILITY, SISHEN, NORTHERN CAPE | HERITAGE IMPACT ASSESSMENT FOR KHUMANI IRON ORE MINE NEW WATER RETURN DAM, PIPELINES AND WATER CONTAINMENT FACILITY, SISHEN, NORTHERN CAPE | Heritage Impact Assessment Specialist Reports | 01/04/2019 | Jaco van der Walt | Heritage Contracts and Archaeological Consulting | Envirogistics (Pty) Ltd | 13/07/2019 - 03:14 |
Heritage Assessment - Ilanga CSP2 | Archaeological Impact Assessment Report for the Proposed Establishment of the Ilganga CSP 2 Project, near Upington, Northern Cape Province | Heritage Impact Assessment Specialist Reports | 18/04/2016 | Jaco van der Walt | Heritage Contracts and Archaeological Consulting | Savannah Environmental (Pty) Ltd | 22/04/2016 - 16:59 |
Hoogland 1 Wind Farm and Hoogland 2 Wind Farm Heritage Report | HERITAGE IMPACT ASSESSMENT: PROPOSED HOOGLAND 1 WIND FARM AND HOOGLAND 2 WIND FARM, BEAUFORT WEST MAGISTERIAL DISTRICT, WESTERN CAPE | Heritage Impact Assessment Specialist Reports | 01/07/2022 | Jayson Orton, Elize Butler | ASHA Consulting(Pty) Ltd, Banzai Environmental (Pty) Ltd | SLR Consulting (South Africa) (Pty) Ltd | 22/03/2022 - 13:39 |
CULTURAL HERITAGE RESOURCES IMPACT ASSESSMENT FOR THE CONSTRUCTION OF A PROPOSED PEDESTRIAN PATHWAY AND CYCLE PATH AT HAMMANSKRAAL GAUTENG PROVINCE | CULTURAL HERITAGE RESOURCES IMPACT ASSESSMENT FOR THE CONSTRUCTION OF A PROPOSED PEDESTRIAN PATHWAY AND CYCLE PATH AT HAMMANSKRAAL GAUTENG PROVINCE | Heritage Impact Assessment Specialist Reports | 22/05/2013 | Udo Kusel | African Heritage Consultants CC | SPOOR Environmental Services (PTY) Ltd. | 19/09/2013 - 17:55 |
SIB4276 HIA | Heritage Impact Assessment for the Millsite TSF Complex | Heritage Impact Assessment Specialist Reports | 30/11/2017 | Justin du Piesanie | Digby Wells Environmental | Sibanye Gold Limited | 19/12/2017 - 08:13 |
musina housing development | The Proposed Musina Housing Development on farm Messina 4MT Within Musina Local Municipality In The Vhembe District Municipality, Limpopo Province. | Heritage Impact Assessment Specialist Reports | 27/11/2018 | Ndivhuwo Eric Mathoho | Millennium Heritage Group | Naledzi Environmental Consultants | 07/03/2019 - 11:46 |
HIA report Proposed Establishment of a Township at Siyandani in Giyani | Heritage Impact Assessment Report. Proposed Demarcation of Sites and Township Development in Siyandani Village on the Portion of The Remaining Extent of Farm Greater Giyani 891 LT within Greater Giyani Local Municipality of Mopani District, Limpopo Province. | Heritage Impact Assessment Specialist Reports | 20/10/2020 | Frans Roodt | Phaki Phakanani | 20/10/2020 - 06:46 | |
Taung Skull heritage site- protection of the core area | Taung Skull heritage site- protection of the core area | Heritage Impact Assessment Specialist Reports | 05/12/2013 | Gilbert Balinda | Mashabane Rose Associates | Independent Development Trust | 03/03/2014 - 15:14 |
HIA for the Proposed 100MW PV Plant at the Samancor Chrome Operations, Steelpoort, Limpopo | HERITAGE IMPACT ASSESSMENT FOR THE PROPOSED 100MW PV PLANT AT THE SAMANCOR CHROME OPERATIONS, STEELPOORT, LIMPOPO | Heritage Impact Assessment Specialist Reports | 20/05/2021 | Wouter Fourie | PGS Heritage (Pty) Ltd | Royal Haskoning DHV | 03/11/2021 - 16:50 |
Ikwezi Mining Powerline and Substation Heritage Report | CULTURAL HERITAGE IMPACT ASSESSMENT OF G IKWEZI MINING 20 MVA 88/22KV SUBSTATION AND ASSOCIATED INGAGANE/UTRECHT/IKWEZI 88KV POWERLINE | Heritage Impact Assessment Specialist Reports | 23/05/2013 | 03/09/2013 - 18:48 | |||
Putfontein 52 - 54 HIA report | Putfontein 52 - 54 Heritage Impact Assessment report | Heritage Impact Assessment Specialist Reports | 11/02/2015 | 20/04/2015 - 09:35 | |||
Heritage Impact Assessment Alpha PV | Cultural heritage impact assessment for the development of the proposed Alpha Solar Power Plant on a portion of the Farm Middel Pan 605IN, Vryburg Region, North West Province | Heritage Impact Assessment Specialist Reports | Johnny Van Schalkwyk | 04/03/2016 - 11:46 | |||
HIA FOR PRP KZN30/5/1/2/11361PR | Archaeological and Heritage Impact Assessment for Prospecting Right Application for Lithium, Feldspar, Tin, Tantalum, Zinc, and Dimension Stone (general) on Various Farms, Situated in the Magisterial District of uGu (Port Shepstone), Kwazulu NataL Province | Heritage Impact Assessment Specialist Reports | 19/05/2023 | Trust Mlilo | Integrated Specialist Services | Integrated Specialist Services (Pty) Ltd | 10/06/2023 - 20:50 |
Wildebeestkuil PV 2 Heritage Impact Report | DEVELOPMENT OF THE 9.9MW WILDEBEESTKUIL 1 SOLAR PV PLANT & 132KV POWER LINE, 9.9MW WILDEBEESTKUIL 2 SOLAR PV PLANT & 132KV POWER LINE AND ASSOCIATED INFRASTRUCTURE NEAR LEEUDORINGSTAD IN THE NORTH WEST PROVINCE Heritage Impact Assessment | Heritage Impact Assessment Specialist Reports | 05/05/2021 | Wouter Fourie | PGS Heritage (Pty) Ltd | SiVEST SA (Pty) Ltd | 21/06/2021 - 13:40 |
Zonnebloem HIA - Mar'18 | Heritage Impact Assessment Report for the Construction of the Zonnebloem Switching Station (132/22kv) and Two Loop-In Loop-Out Power Lines (132kV), Middelburg, Mpumalanga Province. | Heritage Impact Assessment Specialist Reports | 27/03/2018 | Jaco van der Walt | Heritage Contracts and Archaeological Consulting | Savannah Environmental (Pty) Ltd | 13/04/2018 - 11:40 |
Mbeki Sun Heritage Report | Heritage Studies for Mbeki Sun | Heritage Impact Assessment Specialist Reports | 09/10/2019 | A Abzhanov | HMS Auckland and HMS Londondery | Crane Registered Quantity Surveyors | 07/10/2021 - 15:54 |
Proposed NOOA Bayhead Tank Farm | Heritage Impact Assessment Report Proposed Bayhead Tank Farm Ambrose Park Durban Harbour eThekweni. | Heritage Impact Assessment Specialist Reports | 10/12/2017 | Len van Schalkwyk | eThembeni Cultural Heritage | Kantey & Templer Consulting Engineers | 14/02/2018 - 14:34 |
Grypoort Klipfontein Archaeological and Palaeontological study | Archaeological and Paleontological study of footprint area of proposed new Grypoort Klipfontein powerline. | Heritage Impact Assessment Specialist Reports | 27/12/2018 | Lloyd Rossouw | SiVEST - Durban | 10/01/2018 - 09:47 | |
HIA for the proposed township establishment on Portion 16 of the farm Tweefontein 915LS | Heritage Impact Assessment Report: Proposed Township Establishment on Portion 16 of the Farm Tweefontein within Polokwane Local Municipality of The Capricorn District, Limpopo Province. | Heritage Impact Assessment Specialist Reports | 27/05/2021 | Frans Roodt | Phaki Phakanani | 27/05/2021 - 15:58 | |
HIA for the proposed Tirisano PV Solar Power Project | HIA for the proposed Tirisano PV Solar Power Project | Heritage Impact Assessment Specialist Reports | Johnny Van Schalkwyk | Subsolar Energy | 28/03/2020 - 08:03 | ||
A PHASE 1 HIA REPORT FOR THE PROPOSED TOWNSHIP DEVELOPMENT OF MALAMULELE | A PHASE 1 HIA REPORT FOR THE PROPOSED TOWNSHIP DEVELOPMENT OF MALAMULELE EXTENTION E AT MALAMULELE, WITHIN THE COLLINS CHABANE LOCAL MUNICIPALITY, LIMPOPO PROVINCE. | Heritage Impact Assessment Specialist Reports | 22/07/2022 | Anton Pelser | APELSER ARCHAELOGICAL CONSULTING | 24/10/2022 - 11:44 | |
SAPS Shooting Range Heritage Report | Survey of the proposed Ulundi Police Academy Shooting Range, KwaZulu-Natal | Heritage Impact Assessment Specialist Reports | 21/07/2016 | Gavin Anderson | KwaZulu-Natal Amafa and Research Institute | Umlando: Archaeological Surveys & Heritage Management | 25/07/2016 - 19:58 |
Heritage Report for Madadeni Sewer pipeline | CULTURAL HERITAGE IMPACT ASSESSMENT FOR THE MADADENI BULK SEWER PIPELINE, NEWCASTLE REGION, KWAZULU-NATAL | Heritage Impact Assessment Specialist Reports | 01/06/2014 | Johnny Van Schalkwyk | Envirolution Consulting (Pty) Ltd | Envirolution Consulting (Pty) Ltd | 13/10/2014 - 13:25 |
Heritage Impact Assessment, Hakskeen Pan, in the Dawid Kruiper Local Municipality, Northern Cape, in relation to tourism and event-related development: Final Report (Revised) David Morris (Order OR-002815: Supplier E4234) 15 December | Heritage Impact Assessment, Hakskeen Pan, in the Dawid Kruiper Local Municipality, Northern Cape, in relation to tourism and event-related development: Final Report (Revised) David Morris (Order OR-002815: Supplier E4234) 15 December | Heritage Impact Assessment Specialist Reports | David Morris | McGregor Museum | Enviroafrica CC | 13/02/2017 - 08:56 | |
Heritage Impact Assessment: Gamohaan Seokama 22kV powerline | Heritage Impact Assessment Specialist Reports | 31/05/2022 | 07/06/2022 - 11:27 | ||||
Heritage Impact Assessment Report | Heritage Impact Scoping Report for the Mining Rights Application for the Remaining, Portions 2, 3, 4 & 5 of the Farm Kapstewel 436 near the town of Postmasburg in the Northern Cape Pvovinge | Heritage Impact Assessment Specialist Reports | 11/03/2014 | Stephan Gaigher | G&A Heritage Management Consultants | G&A Heritage Management Consultants | 27/02/2015 - 13:28 |
Capital Park X5 | PROPOSED HOUSING DEVELOPMENT TO BE KNOWN AS CAPITAL PARK EXTENSION 5, CITY OF TSHWANE, GAUTENG PROVINCE | Heritage Impact Assessment Specialist Reports | 01/02/2016 | Johnny Van Schalkwyk | JA van Schalkwyk Heritage Consultant | LEAP - Lanscape Architect Environmental Planner | 26/01/2016 - 14:01 |
HIA Stanger Piggery, KZN | CULTURAL HERITAGE IMPACT ASSESSMENT OF PROPOSED ESTABLISHMENT OF THE MANDALAY PIGGERY, KWADUKUZA (STANGER), KWAZULU-NATAL | Heritage Impact Assessment Specialist Reports | Frans Prins | Active Heritage CC | Green Door Environmental | 01/04/2016 - 08:11 | |
TEVREDENHEID / FARM 81, BARKLY WEST | FIRST PHASE ARCHAEOLOGICAL & HERITAGE ASSESSMENT OF THE PROPOSED PROSPECTING AND MINING ACTIVITIES AT THE FARM TEVREDENHEID / FARM 81, BARKLY WEST, NORTHERN CAPE | Heritage Impact Assessment Specialist Reports | 31/01/2015 | Cobus Dreyer | Milnex | Milnex | 27/05/2015 - 21:39 |
HIA Apex Bulk Outfall Sewer | Heritage Impact Assessment for the Proposed Upgrade to Apex Bulk Outfall Sewer Line Phase 1 and Phase 2 near Benoni, Ekurhuleni Metropolitan Municipality, Gauteng Province. | Heritage Impact Assessment Specialist Reports | 03/05/2017 | 05/06/2017 - 11:09 | |||
Phezukomoya Split 1 HIA and Walkthrough Report | Heritage Impact Assessment Specialist Reports | John Gribble | ACO Associates CC | Arcus Consulting | 27/09/2019 - 14:17 | ||
EC-KZN Group 2 Heritage Report | Heritate assessment of Group 2 Sites of the proposed EC-KZN Afforestation EIA | Heritage Impact Assessment Specialist Reports | 20/07/2017 | Len van Schalkwyk | eThembeni Cultural Heritage | Sigwela and Associates | 17/02/2019 - 02:18 |
Parliamentary Precinct Security Upgrades | PARLIAMENTARY PRECINCT SECURITY UPGRADES Road Reserve Bouquet Street, Road Reserve Lelie Lane, Erf 3740 Parliament, Erf 95164 Parliament, Erf 7723 Parliament Street, Erf 95183 Gallery Lane, Re erf 3805 off Plein Street Belvedere House situated on Erf 95187, Corner of Bouquet Street and St John’s Road CITY OF CAPE TOWN, GARDENS | Heritage Impact Assessment Specialist Reports | 17/06/2020 | Sarah Winter | Sarah Winter Heritage Practitioner | Coega Development Corporation (Pty) Ltd | 25/07/2020 - 12:45 |
HERITAGE SURVEY OF THE PROPOSED NGODINI | HERITAGE SURVEY OF THE PROPOSED NGODINI BORDER CAVE DEVELOPMENT | Heritage Impact Assessment Specialist Reports | 07/03/2017 | Gavin Anderson | Umlando: Archaeological Surveys & Heritage Management | Nzingwe Consultancy | 27/03/2017 - 08:46 |
Umfolozi DBAR Heritage Report. | Cultural Heritage Impact Assessment Of The Proposed Coal-Link Project, Umfolozi-Eqwasha Traction, Kwazulu-Natal. | Heritage Impact Assessment Specialist Reports | 21/02/2014 | Frans Prins | Active Heritage CC | Sivest - Gauteng | 22/04/2015 - 12:53 |
Construction of gravel road in JD eNhlalakahle Village | Proposed upgrading of existing 4.9 km gravel road in JD Village, eNhlalakahle Msinga LM, Mzinyathi District DM, KwaZulu-Natal. | Heritage Impact Assessment Specialist Reports | 06/10/2017 | Len van Schalkwyk | eThembeni Cultural Heritage | Magalela & Associates (Pty) Ltd | 10/11/2017 - 16:21 |
Rustenburg Pedestrian Bridge | The proposed development of a pedestrian bridge | Heritage Impact Assessment Specialist Reports | 15/11/2016 | 09/05/2017 - 18:04 | |||
Cultural heritage impact assessment | Cultural heritage impact assessment for THE DEVELOPMENT OF THE PROPOSED KAGISO SOLAR POWER PLANT ON THE REMAINING EXTENT OF THE FARM KAMEELAAR NO 315 REGISTRATION DIVISION KURUMAN, NORTHERN CAPE PROVINCE | Heritage Impact Assessment Specialist Reports | 01/03/2016 | Johnny Van Schalkwyk | 30/05/2016 - 14:21 | ||
HIA report Gemsbok Solar PV2 | HERITAGE IMPACT ASSESSMENT FOR THE PROPOSED GEMSBOK SOLAR PV2 FACILITY, KENHARDT MAGISTERIAL DISTRICT, NORTHERN CAPE | Heritage Impact Assessment Specialist Reports | 21/07/2014 | Jayson Orton | ASHA Consulting(Pty) Ltd | Mulilo Renewable Project Developments (Pty) Ltd | 13/01/2015 - 15:58 |
HIA - Final EIR | Heritage Impact Assessment, Proposed Hartebeest Wind Farm At Moorreesburg, Western Cape | Heritage Impact Assessment Specialist Reports | 30/11/2016 | Timothy Hart | ACO Associates CC | Savannah Environmental (Pty) Ltd | 07/03/2017 - 10:53 |
CONSTRUCTION ENVIRONMENTAL MANAGEMENT PROGRAMMES FOR THE STEELPOORT TO MARBELHALL 400KV POWER-LINE | COMPILATION OF CONSTRUCTION ENVIRONMENTAL MANAGEMENT PROGRAMMES FOR THE STEELPOORT TO MARBELHALL 400KV POWER-LINE AND THE STEELPOORT INTEGRATION PROJECT:HERITAGE RESOURCES ASSESSMENT | Heritage Impact Assessment Specialist Reports | 25/01/2013 | Johnny Van Schalkwyk | Iliso Consulting (Pty) Ltd | 07/05/2013 - 15:11 | |
HIA Aggeneys PV1 | Heritage Impact Assessment: Proposed Aggeneys 1 – 100MW Solar PV Facility and Associated Infrastructure Near Aggeneys, Namakwaland Magisterial District, Northern Cape | Heritage Impact Assessment Specialist Reports | 31/03/2019 | Jayson Orton | ASHA Consulting(Pty) Ltd | Savannah Environmental (Pty) Ltd | 24/04/2019 - 09:30 |
The Rehabilitation of Diepkloof Dam | The Rehabilitation of Diepkloof Dam Located in the Larger Soweto Region, City of Johannesburg Metropolitan Municipality, Gauteng Province | Heritage Impact Assessment Specialist Reports | 25/05/2020 | Johan van Schalkwyk | 16/09/2020 - 23:26 | ||
HIA for Upgrade of Inner City Transportatino Hub, Strand Street, Cape Town | Inner City Transportation Hub: Project A: Replacement of Pedestrian Bridge and Project B: Vehicular down ramp Site Name: Erven RE 14888, RE 4651 and 148638, Cape Town Location: Strand Street Cape, Town Heritage Impact Assessment | Heritage Impact Assessment Specialist Reports | Sarah Winter | City of Cape Town Metropolitan Municipality | 24/10/2016 - 13:48 | ||
HIA Ergo SEF (Phase 1) | HERITAGE IMPACT ASSESSMENT FOR THE PROPOSED ERGO MINING SOLAR (PV) ENERGY: PHASE 1 PROJECT, GAUTENG PROVINCE | Heritage Impact Assessment Specialist Reports | 15/07/2021 | Jaco van der Walt | Tshedza 1 Pre Project Development (Pty) Ltd | HCAC Heritage Consultants | 17/09/2021 - 17:25 |
Hollingwood Subsidised Housing HIA | Heritage Survey of the Proposed Hollingwood Low Cost Housing Project. Pietermaritzburg, KwaZulu Natal | Heritage Impact Assessment Specialist Reports | 26/06/2015 - 09:32 | ||||
HIA for MAhlathini Road | CULTURAL HERITAGE IMPACT ASSESSMENT FOR THE PROPOSED UPGRADING OF MAHLATHINI ROAD | Heritage Impact Assessment Specialist Reports | 06/05/2016 | Frans Prins | 09/05/2016 - 12:37 |