THIS IS THE ARCHIVE FOR SAHRIS 1.0
THIS SITE IS NOW AN ARCHIVE AND IS NOT SUITABLE FOR MAKING APPLICATIONS
Please be aware that no content and application creation or changes to information on this version of SAHRIS will be retained.
To make applications or utilise SAHRIS for the creation of information, please use the new site:
https://sahris.org.za
Changes to SAHRIS!
The South African Heritage Resources Information System (SAHRIS) has undergone a generational upgrade and restructure. These changes to the site include, but are not limited to:
- A new & modernised look and layout
- Improved site usage flows with respect to applications and content creation
- Improved site performance and stability
Launch for the new version of SAHRIS occurred on Monday the 30th of October 2023.
The new site can be found here:
SAHRIS | SAHRIS
Displaying 1 - 50 of 18975
ReportRef | ReportTitle | ReportType | ReportDate | Authors | AuthoringBody | CommissioningCompany | MapID < 2009 | Post date |
---|---|---|---|---|---|---|---|---|
SECTION 34 DEMOLITION APPLICATION FOR CERTAIN STRUCTURES AT THE BLACK ROCK KOPPIE, WITHIN THE ASSMANG BLACK ROCK MINING OPERATIONS (BRMO), NORTHERN CAPE PROVINCE | SECTION 34 DEMOLITION APPLICATION FOR CERTAIN STRUCTURES AT THE BLACK ROCK KOPPIE, WITHIN THE ASSMANG BLACK ROCK MINING OPERATIONS (BRMO), NORTHERN CAPE PROVINCE | BE & CL Phase 1 | 19/10/2022 | Anton van Vollenhoven | Archaetnos CC | EScience | 31/10/2022 - 17:21 | |
A REPORT ON A SECOND ARCHAEOLOGICAL IMPACT ASSESSMENT FOR THE PROPOSED NEW RAILWAY BRIDGE AT THE BLACK ROCK MINING OPERATIONS, CLOSE TO HOTAZEL, NORTHERN CAPE PROVINCE | A REPORT ON A SECOND ARCHAEOLOGICAL IMPACT ASSESSMENT FOR THE PROPOSED NEW RAILWAY BRIDGE AT THE BLACK ROCK MINING OPERATIONS, CLOSE TO HOTAZEL, NORTHERN CAPE PROVINCE | Archaeological Specialist Reports | 05/11/2019 | Prof. Anton van Vollenhoven | Archaetnos Culture & Cultural Resource Consultants | EScience Associates (Pty) Ltd | 02/12/2019 - 13:45 | |
HIA FOR THE PROPOSED KOMSBERG EAST AND WEST WIND ENERGY FACILITIES (SHARED) | HIA FOR THE PROPOSED KOMSBERG EAST AND WEST WIND ENERGY FACILITIES (SHARED) | Heritage Impact Assessment Specialist Reports | 15/11/2015 | Timothy Hart | ACO Associates CC | Arcus Consulting | 17/05/2016 - 13:46 | |
Phase 1 Cultural Heritage Impact Assessment: | PROSPECTING RIGHT APPLICATION FOR PORTION 35 OF RIETVLEI 150, VRYHEID REGION, ABAQULUSI LOCAL MUNICIPALITY, KWAZULU-NATAL | HIA Phase 1 | 01/06/2020 | J.A. van Schalkwyk | Information Decision Systems | 02/07/2020 - 10:16 | ||
Phase 2 Study PIA | Palaeontological Impact Assessment for the Proposed Prospecting Rights Application on Rietvlei 150 HU, ~20km east of Vryheid, KwaZulu-Natal Province | PIA Phase 2 | 27/08/2019 | Marion Bamford | 19/03/2020 - 11:39 | |||
(HIA) FOR THE PROPOSED DEVELOPMENT OF AGRICULTURAL FACILITIES ON THE FARM WELTEVREDEN 278-JP | PHASE 1 HERITAGE IMPACT ASSESSMENT (HIA) FOR THE PROPOSED DEVELOPMENT OF AGRICULTURAL FACILITIES ON THE FARM WELTEVREDEN 278-JP, ZEERUST, NORTH WEST PROVINCE | HIA Phase 1 | 07/07/2021 | Leonie Marais Heritage Practitioner | Leonie Marais Heritage Practitioner | EnviroSynergy Consulting (Pty) Ltd | 06/07/2021 - 06:38 | |
(PPM) PROPOSED ROCK WASTE DUMP EXTENSION | A HERITAGE IMPACT ASSESSMENT (HIA) STUDY FOR PILANESBURG PLATINUM MINES’ (PPM) PROPOSED ROCK WASTE DUMP EXTENSION NEAR THE PILANESBERG IN THE NORTH-WEST PROVINCE OF SOUTH AFRICA | HIA Phase 1 | 06/06/2009 | Julius CC Pistorius | Pilanesberg Platinum Mines (Pty) Ltd | SLR Consulting (Africa) | 21/11/2013 - 17:18 | |
281 Retief Street Pietermaritzburg | Application for Additions to 281 Retief Street Pietermaritzburg | Built Environment and Cultural Landscapes | 26/09/2023 | JOHARA ANANDLAL | LEI DESIGN STUDIOS | LEI DESIGN STUDIOS | 27/09/2023 - 00:28 | |
ARCHAEOLOGICAL AND CULTURAL HERITAGE IMPACT ASSESSMENT SPECIALIST REPORT | PHASE I ARCHAEOLOGICAL AND CULTURAL HERITAGE IMPACT ASSESSMENT SPECIALIST REPORT FOR THE PROPOSED DEVELOPMENT OF EXXARO DORSTFONTEIN WEST DISCARD DUMP FACILITY AND TRANSPORTATION OF COAL FROM DCM WEST TO DCM EAST WITHIN EMALAHLENI LOCAL MUNICIPALITY OF NKANGALA DISTRICT IN MPUMALANGA PROVINCE. | AIA Phase 1 | 10/03/2020 | Munyadziwa Magoma | Nsovo Environmental Consulting | 09/09/2020 - 13:03 | ||
ARCHAEOLOGICAL SURVEY | PHASE 1 ARCHAEOLOGICAL SURVEY ON PORTION 3 OF THE FARM EZAKHENI C 16863 GS IN ALFRED DUMA LOCAL MUNICIPALITY, KWAZULU NATAL PROVINCE | AIA Phase 1 | 10/07/2019 | Churchill Mpiyesizwe Guduza | Nkululeko Environment and Development Agency | Nkululeko Environment and Development Agency | 06/02/2020 - 18:29 | |
Construction of a Substation and 132kV Power Line from Heilbron (via Frankfort) to Villiers, Free State Province. | Heritage Impact Walkdown Report for the Construction of a Substation and 132kV Power Line from Heilbron (via Frankfort) to Villiers, Free State Province. | HIA Phase 1 | 19/06/2017 | Stephan Gaigher | G&A Heritage Management Consultants | Eskom Distribution Free State Operating Unit | 20/07/2017 - 14:28 | |
Croydon/Germiston River Crossings HIA | Phase 1 Cultural Heritage Impact Assessment for THE PROPOSED CONSTRUCTION OF RIVER CROSSINGS ALONG UNDERGROUND HV FEEDER CABLES IN GERMISTON AND CROYDON, EKURHULENI DISTRICT MUNICIPALITY, GAUTENG PROVINCE | HIA Phase 1 | 15/12/2017 | 20/02/2018 - 10:51 | ||||
EIA FOR CSP IN BOKPOORT, NORTHERN CAPE | AMENDMENT: EIA APPLICATION FOR CSP IN BOKPOORT, NORTHERN CAPE | Heritage Impact Assessment Specialist Reports | 06/03/2018 | Johan van Schalkwyk, Cobus Dreyer | 16/03/2018 - 16:30 | |||
Erf 924, Bo-Kaap | Nr. 54 Chiappini Street, Erf 924, Bo-Kaap, Cape Town renovation | Heritage Statement | 03/10/2013 | 03/10/2013 - 13:42 | ||||
ERG6028 - Project Status and Close-out Memo | City Dump Burial Ground Mitigation Process - Proposed Way Forward and Proposed Project Close out | Non Impact Assessment Related Reports | 29/05/2023 | Shannon Hardwick | Digby Wells Environmental | Ergo Mining (Pty) Ltd | 29/05/2023 - 11:49 | |
Golden Mole Mall - PTA east - Phase 1 AIA_v1 | PHASE 1 ARCHAEOLOGICAL IMPACT ASSESSMENT For The Proposed Golden Mole Mall on Farm Portions 218 and 220 of the Farm Tweefontein 372 JR, Pretoria, Gauteng | AIA Phase 1 | 12/11/2021 | Tobias Coetzee | Tobias Coetzee | Eco Elementum (Pty) Ltd | 02/12/2021 - 21:06 | |
Heritage Impact Assessment & Palaeontological Desktop Assessment | Heritage Impact Assessment and Palaeontological Desktop Assessment | Heritage Impact Assessment Specialist Reports | 27/05/2021 | Wouter Fourie | PGS Heritage (Pty) Ltd | Savannah Environmental (Pty) Ltd | 27/05/2021 - 10:10 | |
Heritage Impact Assessment for the for the Proposed New Residential Township Development Of Vanderbijl Park South West No 8 Ext 1, Situated On Holding 23, Lasiandra Ah, Emfuleni Local Municipality, Sedibeng District Municipality, Gauteng Province | Heritage Impact Assessment for the for the Proposed New Residential Township Development Of Vanderbijl Park South West No 8 Ext 1, Situated On Holding 23, Lasiandra Ah, Emfuleni Local Municipality, Sedibeng District Municipality, Gauteng Province | HIA Phase 1 | 09/11/2022 | Jaco van der Walt | Beyond Heritage | Isquare Environmental Planning and GIS | 20/12/2022 - 13:52 | |
Heritage Impact Assessment for the proposed residential township development on Portion 34 of the Farm Rietspruit 152-IR, Ekurhuleni Metropolitan Municipality | Heritage Impact Assessment for the proposed residential township development on Portion 34 of the Farm Rietspruit 152-IR, Ekurhuleni Metropolitan Municipality | HIA Phase 1 | 18/11/2022 | Jaco van der Walt | Beyond Heritage | Isquare Environmental Planning and GIS | 07/02/2023 - 21:49 | |
Heritage Impact Assessment for the Proposed Residential Township Establishment to be known as Erand Gardens Ext 125, Gauteng Province | Heritage Impact Assessment for the Proposed Residential Township Establishment to be known as Erand Gardens Ext 125, Gauteng Province | HIA Phase 1 | 21/02/2022 | Jaco van der Walt | Beyond Heritage | Exigent Engineering Consultants | 03/03/2022 - 14:43 | |
Heritage Impact Assessment for the proposed Roan 1 PV facility and associated infrastructure near Hartbeesfontein, North-West Province | Heritage Impact Assessment for the proposed Roan 1 PV facility and associated infrastructure near Hartbeesfontein, North-West Province | HIA Phase 1 | 06/04/2022 | Jaco van der Walt | Beyond Heritage | Cape Environmental Assessment Practitioners | 11/05/2022 - 08:12 | |
HERITAGE IMPACT ASSESSMENT FOR THE PROPOSED VUTSHINI-NKANDLA WATER SCHEME (NORTH): PHASE 1 WITHIN THE NKANDLA | HERITAGE IMPACT ASSESSMENT FOR THE PROPOSED VUTSHINI-NKANDLA WATER SCHEME (NORTH): PHASE 1 WITHIN THE NKANDLA LOCAL MUNICIPALITY, NORTHERN KWAZULU-NATAL. | HIA Letter of Exemption | 28/01/2015 | Len van Schalkwyk | eThembeni Cultural Heritage | ACER (Africa) Environmental Management Consultants | 24/02/2015 - 13:04 | |
Heritage input optimised layout | SE2602 Wind Garden App S6 - Heritage input optimised layout | Heritage Statement | 28/04/2022 | Cherene de Bruyn | PGS Heritage (Pty) Ltd | Savannah Environmental (Pty) Ltd | 04/05/2022 - 13:30 | |
Heritage input optimised layout | SE2602 Fronteer App S6 - Heritage input optimised layout | Heritage Statement | 28/04/2022 | Cherene de Bruyn | PGS Heritage (Pty) Ltd | Savannah Environmental (Pty) Ltd | 04/05/2022 - 14:47 | |
Heritage Report For Popo Molefe | Heritage Report : Popo Molefe | HIA Phase 1 | 25/08/2020 | A Stone | Bobo Productions | Maropeng 'a Afrika | 04/09/2020 - 16:02 | |
HIA | A REPORT ON A PHASE 1 HERITAGE IMPACT ASSESSMENT FOR A MINING RIGHT APPLICATION ON PORTION 1 OF THE FARM KLEINZUIKERBOSCHPLAAT 5IS NEAR OGIES, SITUATED IN THE EMALAHLENI MAGISTERIAL DISTRICT IN THE MPUMALANGA PROVINCE | HIA Phase 1 | 01/05/2018 | Anton Pelser | APELSER ARCHAEOLOGICAL CONSULTING | Ndlelehle Mining and Consulting | 12/02/2019 - 05:40 | |
HIA Borrow Pit 12 | Phase 1 Heritage Impact Assessment of a new borrow pit (BP 12) at Dithakong, located northeast of Kuruman, NC Province | HIA Phase 1 | 02/09/2019 | Lloyd Rossouw | 04/12/2019 - 08:29 | |||
HIA Caledon Wind Farm | Environmental Impact Assessment for the Establishment of the Caledon Wind Farm, Western Cape Province | HIA Phase 1 | 01/10/2011 | Timothy Hart | ACO Associates CC | Arcus Gibb (Pty) Ltd | CTS_329679 | 08/09/2015 - 12:27 |
HIA De Kleine Oliphantskop 1481 | Remainder Farm De Kleine Oliphantskop 1481 HERITAGE ASSESSMENT In terms of Section 38(1) 0f the NationaI Heritage Resources Act (Act 25 of 1999) | HIA Phase 1 | 01/03/2009 | Quahnita Samie | Vidamemoria Heritage Consultants | VASSIL PANTCHEV | CTS_329607 | 04/09/2015 - 12:03 |
HIA Exemption for Sugar Cane Agricultural Development by Senekal Boerdery near Mkuze | Application for Exemption from a Phase 1 Heritage Impact Assessment for the Proposed agricultural development by Senekal Boerdery near Mkuze,uMkhanyakude District Municipality, KwaZulu-Natal, South Africa | HIA Letter of Exemption | 28/01/2015 | Len van Schalkwyk | eThembeni Cultural Heritage | ACER (Africa) Environmental Management Consultants | 03/03/2015 - 14:02 | |
HIA for In-situ Rural Subsidised Housing Project , Qadi Ward 8, Maphumulo | Cultural Heritage Impact Assessment of the Proposed Rural Subsidised Housing Project , Qadi Traditional Authority (Ward 8), Maphumulo. | HIA Phase 1 | 08/08/2014 | Frans Prins | Active Heritage CC | Simon Vines TRP (SA) | 02/09/2014 - 05:04 | |
HIA Gonubie Filling Station | Heritage Impact Assessment Report: Proposed Gonubie Filling Station, Located On Farm No. 809, Portion 66 (Of Portion 9), Buffalo City Metropolitan Municipality, Eastern Cape Province | HIA Phase 1 | 20/02/2022 | Alexander Antonites | Kantey & Templer Consulting Engineers | 20/02/2022 - 11:31 | ||
INGLESBY 580 OLIFANTSHOEK, | FIRST PHASE ARCHAEOLOGICAL & HERITAGE INVESTIGATION OF THE PROPOSED MINE PROSPECTING AT THE REMAINING EXTENT OF THE FARM INGLESBY 580 NEAR OLIFANTSHOEK, NORTHERN CAPE PROVINCE | Heritage Impact Assessment Specialist Reports | 10/05/2014 | Cobus Dreyer | RE A Kgona General Services CC | RE A Kgona General Services CC | 27/09/2014 - 21:35 | |
IXOPO RENEWAL ENERGY PLANT | A REPORT ON A CULTURAL HERITAGE IMPACT ASSESSMENT DONE FOR THE PROPOSED IXOPO RENEWAL ENERGY PLANT, KWAZULU-NATAL PROVINCE | HIA Phase 1 | 23/06/2016 | Prof. Anton van Vollenhoven | A.C. van Vollenhoven | EON Consulting | 21/10/2016 - 16:06 | |
Kudu Solar Facility 5 Heritage Scoping Report | HERITAGE SPECIALIST SCOPING REPORT INPUTS: Scoping and Environmental Impact Assessment (EIA) Process for the Proposed Development of a Solar Photovoltaic Facility (Kudu Solar Facility 5) and associated infrastructure, near De Aar, Northern Cape Province | Heritage Scoping | 18/08/2022 | Jayson Orton | ASHA Consulting(Pty) Ltd | CSIR | 11/12/2022 - 21:19 | |
Lebone Solar Farm - HIA | Phase 1 Archaeological Impact Assessment & Palaeontological Assessment Lebone Solar Farm The Remaining Extent of the Farm Onverwag No. 728 and Portion 2 of the Farm Vaalkranz Np. 220, Welkom, Free State Province | Heritage Impact Assessment Specialist Reports | 17/10/2013 | Karen Van Ryneveld, Gideon Groenewald | ArchaeoMaps Archaeological Consultancy | Enviroworks | 12/11/2013 - 15:08 | |
Lougot Logistics Industrial Park, Cato Ridge | Phase 1 Heritage Impact Assessment Report: Proposed Subdivision for Lougot Logistics Industrial Park on Portion of the Remainder of a Portion of Portion 30 of The Farm Uitkomst and Doornrug No. 852, Cato Ridge, eThekwini Metropolitan Municipality, KwaZulu-Natal | HIA Phase 1 | 14/10/2014 | Elizabeth Wahl | eThembeni Cultural Heritage | Lougot Property Investments (Pty) Ltd | 15/10/2014 - 12:39 | |
M1562 Oribi Gorge Dams Heritage Screener | M1562 Oribi Gorge Dams Heritage Screener (CTS15_005) | 28/07/2015 | Kyla Bluff, Mariagrazia Galimberti, Peter Kloos, Nicholas Wiltshire | CTS Heritage | Envirosol - Environmental Solutions | 28/07/2015 - 14:20 | ||
Moletjie Grave Rescue Project | Rescue Exhumation and Relocation of a Human Skeleton at Moletjie, Polokwane, Limpopo Province | Archaeological Permit Report | 20/07/2015 | Stephan Gaigher | G&A Heritage Management Consultants | Polokwane Local Municipality | 24/07/2015 - 12:32 | |
MURUNWA VODACOM TELEMAST, LIMPOPO PROVINCE. | PROPOSED CONSTRUCTION OF THE BONISWA SITE 2021, MURUNWA VODACOM TELEMAST, LIMPOPO PROVINCE. | Heritage Impact Assessment Specialist Reports | 16/03/2022 | Stephan Gaigher | Tekplan Environmental | 30/03/2022 - 12:30 | ||
Nzalo DBAR Heritage Report | Phase One Heritage Impact Assessment Of The Proposed Coal-Link, Nzalo (Mqabe) Near Vryheid, Kzn. | Heritage Impact Assessment Specialist Reports | 21/02/2014 | Frans Prins | Sivest - Gauteng | 22/04/2015 - 10:45 | ||
Olievenhoutpoort | Evaluation of existing built structures on: Portion 662 of the Farm Olievenhoutpoort 196 IQ Johannesburg, Gauteng In terms of Section 34 of the National Heritage Resources Act | HIA Phase 2 | 01/04/2017 | Engela White | 31/08/2017 - 11:49 | |||
Palmietfontein_Ventersdorp_AIA_Revised+desktop | Palmietfontein_Ventersdorp_AIA_Revised+desktop | Archaeological Specialist Reports | 22/02/2020 | Tobias Coetzee | 28/02/2020 - 11:05 | |||
PHASE 1 HIA & REPORT FOR THE PROPOSED RIETVLEI EXTENSION 24 TOWNSHIP DEVELOPMENT | A PHASE 1 HIA & REPORT FOR THE PROPOSED RIETVLEI EXTENSION 24 TOWNSHIP DEVELOPMENT LOCATED ON PORTION 712 OF THE FARM DOORNKLOOF 391JR TSHWANE METROPOLITAN AREA, GAUTENG | HIA Phase 1 | 09/12/2021 | 04/01/2022 - 09:41 | ||||
PROPOSED KHULU TSF PROJECT ARCHAEOLOGICAL SITE SELECTION REPORT | ARCHAEOLOGICAL SITE SELECTION REPORT FOR THE PROPOSED KHULU TSF PROJECT, LIMPOPO PROVINCE | Archaeological Specialist Reports | 01/06/2021 | Jaco van der Walt | HCAC Heritage Consultants | Envirogistics (Pty) Ltd | 27/07/2021 - 20:18 | |
PROPOSED KHULU TSF PROJECT HERITAGE SCOPING REPORT | HERITAGE SCOPING REPORT FOR THE PROPOSED NEW KHULU TAILINGS STORAGE FACILITY AND ASSOCIATED INFRASTRUCTURE PROJECT, LIMPOPO PROVINCE. | Heritage Scoping | 18/06/2021 | Jaco van der Walt | HCAC Heritage Consultants | Envirogistics (Pty) Ltd | 27/07/2021 - 20:21 | |
Proposed KiPower 400kV loop-in and loop-out transmission lines to connect the KiPower IPP to the national grid | A phase I Heritage Impact Assessment (HIA) study for the proposed KiPower 400kV loop-in and loop-out transmission lines to connect the KiPower IPP to the national grid on the eastern Highveld in the Mpumalanga province | HIA Phase 1 | 12/05/2016 | Julius CC Pistorius | Dr Julius CC Pistorious Archaeologist and heritage Consultant | Jones & Wagener Engineering and Environmental Consultants | 19/05/2016 - 15:03 | |
REMAINING EXTENT OF FARM FAIRFIELD 520, HAY DISTRICT | PHASE 1 ARCHAEOLOGICAL IMPACT ASSESSMENT REPORT ON A 4 HA PORTION OF THE REMAINING EXTENT OF FARM FAIRFIELD 520, SITUATED ~30 KM NORTH OF CAMPBELL, HAY MAGISTERIAL DISTRICT, NORTHERN CAPE PROVINCE | AIA Phase 1 | 12/02/2013 | Peter Beaumont | De Beers Consolidated Mines - Kimberley Mines | McGregor Museum | 04/04/2013 - 12:25 | |
ROODEPOORT COLLIERY ARCHAEOLOGICAL IMPACT ASSESSMENT | A REPORT ON AN ARCHAEOLOGICAL IMPACT ASSESSMENT FOR THE PROPOSED ROODEPOORT MINING PROJECT, CLOSE TO PULLENS HOPE, MPUMALANGA PROVINCE | Heritage Impact Assessment Specialist Reports | 27/01/2021 | Anton van Vollenhoven | Archaetnos Culture & Cultural Resource Consultants | 14/06/2021 - 15:45 | ||
Rustfontein Dam WTW facility HIA | Phase 1 Heritage Impact Assessment of the proposed extension of the Rustfontein Dam WTW facility, Free State Province. | HIA Phase 1 | 21/03/2015 | Lloyd Rossouw | Paleo Field Services | Aryx Consulting Limited | 08/12/2015 - 12:52 |