FindReports

THIS IS THE ARCHIVE FOR SAHRIS 1.0


THIS SITE IS NOW AN ARCHIVE AND IS NOT SUITABLE FOR MAKING APPLICATIONS

Please be aware that no content and application creation or changes to information on this version of SAHRIS will be retained.

To make applications or utilise SAHRIS for the creation of information, please use the new site:

https://sahris.org.za

Changes to SAHRIS!

The South African Heritage Resources Information System (SAHRIS) has undergone a generational upgrade and restructure. These changes to the site include, but are not limited to:

  • A new & modernised look and layout
  • Improved site usage flows with respect to applications and content creation
  • Improved site performance and stability

Launch for the new version of SAHRIS occurred on Monday the 30th of October 2023.

The new site can be found here:

SAHRIS | SAHRIS

Advanced options
ReportRef ReportTitlesort descending ReportType ReportDate Authors AuthoringBody CommissioningCompany Post date
Lady Grey and Sterkfontein HIA Phase 1 Cultural Heritage Impact Assessment: THE DEVELOPMENT OF INTERNAL ROADS AND DAMS ON NEW SECTIONS OF THE LARGER NYATI WILDERNESS, LADY GREY AND STERKFONTEIN, LEPHALALE LOCAL MUNICIPALITY, LIMPOPO PROVINCE HIA Phase 1 24/01/2023 J.A. van Schalkwyk 12/05/2023 - 12:42
Lady Grey Phase 1 Cultural Heritage Impact Assessment: THE DEVELOPMENT OF INTERNAL ROADS AND DAMS ON NEW SECTIONS OF THE LARGER NYATI WILDERNESS, LADY GREY AND STERKFONTEIN, LEPHALALE LOCAL MUNICIPALITY, LIMPOPO PROVINCE HIA Phase 1 24/01/2023 J A van Schalkwyk 12/05/2023 - 12:47
Dihatshwane Substation HIA Report Phase 1 Cultural Heritage Impact Assessment: THE DIHATSHWANE SUBSTATION AND LOOP IN LOOP OUT (LILO) 88 KV POWER LINE, MAFIKENG LOCAL MUNICIPALITY, NORTH WEST PROVIN HIA Phase 1 30/09/2022 JA VAN SCHALKWYK 24/11/2022 - 17:48
Phase 1 Cultural Heritage Impact Assessment - Eland Mine Consolidation Project Phase 1 Cultural Heritage Impact Assessment: THE ELAND MINE CONSOLIDATION APPLICATION, CONSISTING OF PORTIONS OF THE FARMS ELANDSFONTEIN 440JQ AND DE KROON 444JQ (MAROELABULT) EAST OF BRITS IN THE LOCAL MUNICIPALITY OF MADIBENG, NORTH WEST PROVINCE HIA Phase 1 31/07/2020 J.A. van Schalkwyk JA van Schalkwyk Heritage Consultant JEMS Pty Ltd 27/08/2020 - 13:04
Phase 1 Heritage Assessment for Expansion of existing quarry near Matjiesfontein Phase 1 Cultural Heritage Impact Assessment: THE EXPANSION OF AN EXISTING BORROW PIT ON THE FARM TWEEDSIDE 151 IN THE LAINGSBURG LOCAL MUNICIPALITY OF WESTERN CAPE PROVINCE HIA Phase 1 15/06/2018 Johnny van Schalkwyk Department of Mineral Resources Chameleon Environmental 18/06/2018 - 11:12
Phase 1 Heritage Assessment for borrow pit on the farm Ek Kraal Phase 1 Cultural Heritage Impact Assessment: THE PLANNED DEVELOPMENT OF A BORROW PIT ON THE FARM EK KRAAL 199 IN THE KAROO HOOGLAND LOCAL MUNICIPALITY OF NORTHERN CAPE PROVINCE HIA Phase 1 15/06/2018 Johnny van Schalkwyk Department of Mineral Resources - Northern Cape Chameleon Environmental 18/06/2018 - 11:26
HIA for Bakubung Ledig housing Development Phase 1 Cultural Heritage Impact Assessment: THE PROPOSED BAKUBUNG INTEGRATED MIXED USE DEVELOPMENT ON PORTION 15 OF THE FARM LEDIG 909JQ, BOJANALA DISTRICT MUNICIPALITY, NORTH WEST PROVINCE Heritage Impact Assessment Specialist Reports 13/03/2017 - 09:02
Phase 1 Cultural HIA: THE PROPOSED BOKPOORT II PV SOLAR POWER FACILITIES Phase 1 Cultural Heritage Impact Assessment: THE PROPOSED BOKPOORT II PV SOLAR POWER FACILITIES ON THE FARM BOKPOORT 390 NEAR GROBLERSHOOP, !KHEIS LOCAL MUNICIPALITY, NORTHERN CAPE PROVINCE HIA Phase 1 31/01/2020 Johnny Van Schalkwyk Royal Haskoning DHV 06/03/2020 - 08:31
Sagewood HIA Report Phase 1 Cultural Heritage Impact Assessment: The Proposed Construction of a Bridge Between Sagewood and Noordwyk, Midrand Region, City of Johannesburg Metropolitan Municipality, Gauteng Province AIA Phase 1 15/10/2018 J.A. van Schalkwyk Johannesburg Roads Agency 09/11/2018 - 14:12
Seuwe Bridge HIA Phase 1 Cultural Heritage Impact Assessment: THE PROPOSED CONSTRUCTION OF A ROAD BRIDGE, REFERRED TO AS SEUWE BRIDGE, IN THE GREATER TUBATSE LOCAL MUNICIPALITY, LIMPOPO PROVINCE HIA Phase 1 10/05/2022 Johnny van Schalkwyk J A van Schalkwyk 04/10/2022 - 13:38
HIA for the Proposed 400kV Loop In Loop Out Powerline and Expansion of the Garona Substation for Project DAO, !Kheis Local Municipality Phase 1 Cultural Heritage Impact Assessment: THE PROPOSED CONSTRUCTION OF THE FERRUM – GARONA AND GARONA – NIEWEHOOP 400KV LILO ROUTE AND EXPANSION OF THE GARONA SUBSTATION FOR PROJECT DAO NEAR GROBLERSHOOP, !KHEIS LOCAL MUNICIPALITY, NORTHERN CAPE PROVINCE HIA Phase 1 01/06/2021 Johnny Van Schalkwyk Royal Haskoning DHV 22/07/2021 - 15:20
HIA borrow pit N4 Phase 1 Cultural Heritage Impact Assessment: THE PROPOSED DEVELOPMENT OF A BORROW PIT ADJACENT TO THE N4, WEST OF MALELANE, NKOMAZI LOCAL MUNICIPALITY, MPUMALANGA PROVINCE HIA Phase 1 15/09/2021 J van Schalkwyk Department of Mineral Resources - Mpumalanga Chameleon Environmental 09/12/2021 - 17:14
HIA For Rosaly Farms Vaalwater Phase 1 Cultural Heritage Impact Assessment: THE PROPOSED DEVELOPMENT OF IRRIGATED CROP FIELDS AND THE CONSTRUCTION OF DAMS FOR AGRICULTURAL CROP PRODUCTION, ROSALY FARMS, VAALWATER AREA, LEPHALALE LOCAL MUNICIPALITY, LIMPOPO PROVINCE HIA Phase 1 22/02/2022 Johnny van Schalkwyk SPOOR Environmental Services (PTY) Ltd. SPOOR Environmental Services (PTY) Ltd. 25/03/2022 - 17:04
THE PROPOSED EMERALD VALLEY ESTATE, RIETVALLEIRAND EXTENSION 80 Phase 1 Cultural Heritage Impact Assessment: THE PROPOSED EMERALD VALLEY ESTATE, RIETVALLEIRAND EXTENSION 80, HOLDING 72, WATERKLOOF AGRICULTURAL HOLDINGS, CITY OF TSHWANE METROPOLITAN MUNICIPALITY, GAUTENG PROVINCE HIA Phase 1 22/02/2017 Johnny Van Schalkwyk J Paul van Wyk JA van Schalkwyk Heritage Consultant 23/02/2017 - 09:39
Phase 1 Cultural Heritage Impact Assessment: Phase 1 Cultural Heritage Impact Assessment: THE PROPOSED ESTABLISHMENT OF A TOWNSHIP, TO BE KNOWN AS AMOROSA EXTENSION 57, ON PORTION 1 OF HOLDING 25, AMOROSA AGRICULTURAL HOLDINGS, CITY OF JOHANNESBURG METROPOLITAN MUNCIPALITY, GAUTENG PROVINCE Heritage Impact Assessment Specialist Reports J.A. van Schalkwyk Greenworx Environmental (Pty) Ltd 12/08/2021 - 10:04
Ga-Pila Village Sanitation HIA Phase 1 Cultural Heritage Impact Assessment: THE PROPOSED GA-PILA VILLAGE WATER-BORNE SANITATION SEWER UPGRADE PROJECT, MOGALAKWENA LOCAL MUNICIPALITY, LIMPOPO PROVINCE HIA Phase 2 01/07/2022 J van Schalkwyk 28/07/2022 - 12:19
HIA Report Mohadin Sewer Phase 1 Cultural Heritage Impact Assessment: THE PROPOSED INSTALLATION OF A BULK SEWER PIPELINE IN THE MOHADIN REGION, WESTERN POTCHEFSTROOM REGION, NORTH WEST PROVINCE HIA Phase 1 30/11/2021 Johan van Schalkwyk 03/02/2022 - 16:38
Heritate Impact Assessment Report Phase 1 Cultural Heritage Impact Assessment: THE PROPOSED JOHN DUBE EXTENSION 3 TOWNSHIP SITUATED ON PORTION OF REMAINING EXTENT 1 AND PORTION 83 OF THE FARM GROOTFONTEIN 165-IR, EKURHULENI METROPOLITAN MUNICIPALITY, GAUTENG PROVINCE HIA Phase 1 01/02/2019 Johnny Van Schalkwyk 27/07/2020 - 11:35
Phase 1 Heritage Impact assessment for remainders of portions 279 and 285 of the Farm Garsfontein 374 Phase 1 Cultural Heritage Impact Assessment: THE PROPOSED MIXED-USE DEVELOPMENT ON THE REMAINDERS OF PORTIONS 279 AND 285 OF THE FARM GARSTFONTEIN NO. 374-JR WITHIN THE CITY OF TSHWANE METROPOLITAN MUNICIPALITY, GAUTENG PROVINCE HIA Phase 1 13/08/2021 Johnny van Schalkwyk 07/09/2021 - 13:53
Paardeplaats Residential Area HIA Phase 1 Cultural Heritage Impact Assessment: THE PROPOSED NORTH BLOCK COMPLEX (PTY) LTD PAARDEPLAATS COMMUNITY RESIDENTIAL DEVELOPMENT ON A REMAINDER OF PORTION 13 OF FARM PAARDEPLAATS 380JT IN BELFAST, EMAKHAZENI LOCAL MUNICIPALITY, MPUMALANGA PROVINCE HIA Phase 1 28/09/2021 Johnny van Schalkwyk Ndi GEOLOGICAL CONSULTING SERVICES PTY LTD 17/10/2021 - 15:09
Heritage Impact Assessment Phase 1 Cultural Heritage Impact Assessment: THE PROPOSED PROSPECTING RIGHT APPLICATION COMBINED WITH A WASTE LICENCE APPLICATION TO PROSPECT FOR DIAMOND (ALLUVIAL), DIAMOND (GENERAL) DIAMONDS AND DIAMONDS (KIMBERLITE) NEAR UPINGTON ON PORTION 7 OF THE FARM ADEISESTAD 409, PORTION 1 OF THE FARM KALKPUT 407, REMAINING EXTENT OF PORTION 21 AND PORTION 29 (PORTION OF PORTION 21) OF THE FARM UAP 418 AND ON FARM 596, REGISTRATION DIVISION GORDONIA, NORTHERN CAPE PROVINCE HIA Phase 1 31/05/2022 J A van Schalkwyk J A van Schalkwyk Milnex 189 CC 01/06/2022 - 15:08
Heritage Impact Assessment Phase 1 Cultural Heritage Impact Assessment: THE PROPOSED PROSPECTING RIGHT APPLICATION COMBINED WITH A WASTE LICENCE APPLICATION TO PROSPECT FOR DIAMOND (ALLUVIAL), DIAMOND (GENERAL) DIAMONDS AND DIAMONDS (KIMBERLITE) NEAR UPINGTON ON PORTION 7 OF THE FARM ADEISESTAD 409, PORTION 1 OF THE FARM KALKPUT 407, REMAINING EXTENT OF PORTION 21 AND PORTION 29 (PORTION OF PORTION 21) OF THE FARM UAP 418 AND ON FARM 596, REGISTRATION DIVISION GORDONIA, NORTHERN CAPE PROVINCE HIA Phase 1 J A van Schalkwyk J A van Schalkwyk Milnex 189 CC 01/06/2022 - 15:18
2021JvS002EIA443 Phase 1 Cultural Heritage Impact Assessment: THE PROPOSED PROSPECTING RIGHT APPLICATION FOR A PROSPECTING RIGHT OF DIAMOND ALLUVIAL (DA), DIAMOND GENERAL (D), DIAMONDS (DIA) AND DIAMONDS IN KIMBERLITE (DK), PROSPECTING RIGHT, COMBINED WITH A WASTE WATER LICENCE APPLICATION OF WOUTERSPAN MINING (PTY) LTD, ON THE REMAINING EXTENT, PORTION 1 (UITZICHT) OF THE FARM 392 AND PORTION 1 (TEVREDE) OF THE FARM WINDHOEK 393, REGISTRATION DIVISION: HAY; NORTHERN CAPE PROVINCE HIA Phase 1 29/01/2021 Johnny van Schalkwyk, Elize Butler 02/02/2021 - 10:07
Queenswood Extension 15 Phase 1 cultural heritage Phase 1 Cultural Heritage Impact Assessment: THE PROPOSED QUEENSWOOD EXTENSION 15 RESIDENTIAL DEVELOPMENT, CITY OF TSHWANE METROPOLITAN MUNICIPALITY, GAUTENG PROVINCE HIA Phase 1 01/05/2019 Johnny Van Schalkwyk JA van Schalkwyk Heritage Consultant J Paul van Wyk 15/05/2019 - 09:45
Phase 1 HIA N2 Section 20 Freeway Upgrade Phase 1 Cultural Heritage Impact Assessment: THE PROPOSED REHABILITATION OF NATIONAL ROUTE 2, SECTION 20, BETWEEN MOUNT FRERE AND THE NGCWELENI RIVER BRIDGE, ALFRED NZO DISTRICT MUNICIPALITY, EASTERN CAPE PROVINCE HIA Phase 1 09/06/2023 J A van Schalkwyk J A van Schalkwyk JG AFRIKA 09/05/2023 - 09:47
Phase 1 Cultural Heritage Impact Assessment: THE PROPOSED TOWNSHIP DEVELOPMENT ON PORTIONS 68 & 83 OF THE FARM HARTEBEESTPOORT 328JR Phase 1 Cultural Heritage Impact Assessment: THE PROPOSED TOWNSHIP DEVELOPMENT ON PORTIONS 68 & 83 OF THE FARM HARTEBEESTPOORT 328JR, BRUMMERIA, PRETORIA, CITY OF TSHWANE METROPOLITAN MUNICIPALITY, GAUTENG PROVINCE 30/09/2019 Johnny van Schalkwyk SPOOR Environmental Services (PTY) Ltd. 08/10/2019 - 16:53
Cultural Heritage Assessment R37 between Modikwa Mine and Burgersfort Phase 1 Cultural Heritage Impact Assessment: THE PROPOSED UPGRADE OF A SECTION OF THE R37 ROAD BETWEEN MODIKWE MINE AND BURGERSFORT, LIMPOPO PROVINCE HIA Phase 1 15/08/2017 Johnny Van Schalkwyk SAHRA Council Chameleon Environmental 22/01/2018 - 10:29
Phase 1 Cultural Heritage Impact Assessment: THE PROPOSED UPGRADE OF NATIONAL ROAD R36 SECTION 6 FROM MANCHABENI (KM 4.70) TO TZANEEN (KM 33.40) Phase 1 Cultural Heritage Impact Assessment: THE PROPOSED UPGRADE OF NATIONAL ROAD R36 SECTION 6 FROM MANCHABENI (KM 4.70) TO TZANEEN (KM 33.40), LIMPOPO PROVINCE HIA Phase 1 15/09/2021 Johnny van Schalkwyk Department of Environmental Affairs Chameleon Environmental 29/04/2022 - 11:42
Phase 1 Cultural Heritage Impact Assessment: THE PROPOSED UPGRADE OF NATIONAL ROAD R574 (DISTRICT ROAD D1547) SECTION 1 FROM THE R33 GROBLERSDAL (KM 0.0) TO R579 MORWANENG (KM 38.9), LIMPOPO PROVINCE Phase 1 Cultural Heritage Impact Assessment: THE PROPOSED UPGRADE OF NATIONAL ROAD R574 (DISTRICT ROAD D1547) SECTION 1 FROM THE R33 GROBLERSDAL (KM 0.0) TO R579 MORWANENG (KM 38.9), LIMPOPO PROVINCE HIA Phase 1 14/10/2021 Johnny van Schalkwyk Department of Environmental Affairs Chameleon Environmental 16/03/2022 - 16:24
HIA Stormvoel to Baviaanspoort Road including the Moepel Road Overpass Phase 1 Cultural Heritage Impact Assessment: THE PROPOSED UPGRADING OF PROVINCIAL ROAD R573 (MOLOTO ROAD) AND K139, AS WELL AS THE MOEPEL ROAD OVERPASS, NORTH OF PRETORIA, GAUTENG PROVINCE HIA Phase 1 27/05/2020 Johnny van Schalkwyk JA van Schalkwyk Heritage Consultant GA Environment (Pty) Ltd 24/11/2020 - 10:05
Heritage Report - R504 Section 4 Phase 1 Cultural Heritage Impact Assessment: THE PROPOSED UPGRADING OF SECTION 4 OF ROAD R504, LEEUDORINGSTAD (KM 0.00) TO THE VAAL RIVER BRIDGE (KM 24.1), MAQUASSI HILLS LOCAL MUNICIPALITY, NORTH WEST PROVINCE HIA Phase 1 14/10/2020 Johnny van Schalkwyk SAHRA Council Chameleon Environmental 03/03/2023 - 14:32
Nzalo 2x 88kV power lines HIA Report Phase 1 Cultural Heritage Impact Assessment: TRANSNET COAL LINK UPGRADE PROJECTS: THE PROPOSED CONSTRUCTION OF THE NZALO 2X 88KV TURN-IN POWER LINES NEAR VRYHEID, KWAZULU-NATAL PROVINCE HIA Phase 1 30/03/2021 J.A. van Schalkwyk 19/05/2021 - 13:18
Nzalo 2x 88kV power lines HIA Report Phase 1 Cultural Heritage Impact Assessment: TRANSNET COAL LINK UPGRADE PROJECTS: THE PROPOSED CONSTRUCTION OF THE NZALO 2X 88KV TURN-IN POWER LINES NEAR VRYHEID, KWAZULU-NATAL PROVINCE HIA Phase 1 31/03/2021 J.A. van Schalkwyk 19/05/2021 - 13:38
Vryheid 2x 88 kV Turn-In Power Lines HIA Report Phase 1 Cultural Heritage Impact Assessment: TRANSNET COAL LINK UPGRADE PROJECTS: THE PROPOSED CONSTRUCTION OF THE VRYHEID 2X 88KV TURN-IN POWER LINES IN THE ABAQULUSI LOCAL MUNICIPALITY, KWAZULU-NATAL PROVINCE HIA Phase 1 31/03/2021 J.A. van Schalkwyk 19/05/2021 - 13:58
Phase 1 Cultural Heritage Impact Assessment: Phase 1 Cultural Heritage Impact Assessment: UPGRADING OF EXISTING ROAD D684 AND PROVISION OF A NEW ACCESS ROAD AT SIKHULULIWE VILLAGE NEAR MAFUBE MINE IN THE NKANGALA DISTRICT MUNICIPALITY, MPUMALANGA PROVINCE HIA Phase 1 09/06/2021 J A van Schalkwyk J A van Schalkwyk JG AFRIKA 09/05/2023 - 10:31
Phase 1 Cultural Heritage Impact Assessment Phase 1 Cultural Heritage Impact Assessment: SECTION 24G PROCESS: UNLAWFUL CONSTRUCTION AND INFILLING OF A WATERCOURSE ON THE REMAINDER OF PORTION 274 OF THE FARM TIEGERPOORT 371JR, CITY OF TSHWANE METROPOLITAN MUNICIPALITY, GAUTENG PROVINCE HIA Phase 1 20/04/2023 J A van Schalkwyk J A van Schalkwyk 24/04/2023 - 08:19
HIA for Expansion of Turfgrond Railway Substation Phase 1 Cultural Heritage Impact Assessment: THE PROPOSED EXPANSION OF THE EXISTING TURFGROND ELECTRICITY SUBSTATION NEAR MARIKANA, BOJANALA DISTRICT MUNICIPALITY, NORTH WEST PROVINCE HIA Phase 1 01/06/2019 Johan van Schalkwyk Batatise Consulting Engineers Batatise Consulting Engineers 08/01/2020 - 15:06
HIA: Goedevooruitzicht and Roodepoortje Prospecting Phase 1 Cultural Heritage Impact Assessment: Application of Prospecting Right with Bulk Sampling on portion 3, 7, 8, 9, 10 and Remaining Extent of the farm Goedevooruitzicht 120IP and a portion of portion 18 Roodepoortje 154IP in Lichtenburg Magisterial District, North West Province. HIA Phase 1 01/05/2018 J.A. van Schalkwyk Archean Resources 13/07/2018 - 15:04
Heritage Impact Assessment Phase 1 Cultural Heritage Impact Assessment: GENERAL WASTE DISPOSAL SITE AT THE ESKOM MAJUBA POWER STATION, GERT SIBANDE DISTRICT MUNICIPALITY, MPUMALANGA PROVINCE HIA Phase 1 30/04/2018 J J A van Schalkwyk BTW Consulting (Pty) Ltd 16/11/2021 - 08:29
Phase 1 Cultural Heritage Impact Assessment Phase 1 Cultural Heritage Impact Assessment: MINING PERMIT APPLICATION FOR THE REMOVAL OF DIAMONDS ALLUVIAL AND DIAMOND GENERAL ON A CERTAIN PORTION ON THE REMAINING EXTENT OF PORTION 1 OF THE FARM CHRISTIANA TOWN & TOWNLANDS 325HO, LEKWA-TEEMANE LOCAL MUNICIPALITY, NORTH WEST PROVINCE HIA Phase 1 04/09/2017 Johan van Schalkwyk 05/09/2017 - 09:03
Phase 1 Cultural Heritage Impact Assessment: Phase 1 Cultural Heritage Impact Assessment: MINING PERMIT APPLICATION FOR THE REMOVAL OF DIAMONDS ALLUVIAL AND DIAMOND GENERAL ON A CERTAIN PORTION ON THE REMAINING EXTENT OF PORTION 1 OF THE FARM CHRISTIANA TOWN & TOWNLANDS 325HO, LEKWA-TEEMANE LOCAL MUNICIPALITY, NORTH WEST PROVINCE HIA Phase 1 04/09/2017 Johan van Schalkwyk 05/09/2017 - 09:11
Phase 1 Cultural Heritage Impact Assessment: Phase 1 Cultural Heritage Impact Assessment: MINING PERMIT APPLICATION FOR THE REMOVAL OF DIAMONDS ALLUVIAL AND DIAMOND GENERAL ON A CERTAIN PORTION ON THE REMAINING EXTENT OF PORTION 1 OF THE FARM CHRISTIANA TOWN & TOWNLANDS 325HO, LEKWA-TEEMANE LOCAL MUNICIPALITY, NORTH WEST PROVINCE HIA Phase 1 04/09/2017 Johan van Schalkwyk 05/09/2017 - 09:15
Phase 1 Cultural Heritage Impact Assessment: Finaalspan Phase 1 Cultural Heritage Impact Assessment: Potential Housing Development on The Remainder Of Portion 44 of The Farm Finaalspan 114 IR, Ekurhuleni Metropolitan Municipality, Gauteng Province AIA Phase 1 24/02/2017 Johnny Van Schalkwyk 16/03/2017 - 12:39
Phase 1 Cultural Heritage Impact Assessment: Phase 1 Cultural Heritage Impact Assessment: PROPOSED MINING RIGHT APPLICATION ON PORTIONS 3 AND REMAINDER AND PORTION 9 AND 10 OF THE FARM PIENAARSFONTEIN 113, REGISTRATION DIVISION HO, DR RUTH SEGOMOTSI MOMPATI LOCAL MUNICIPALITY, NEAR SCHWEIZER-RENEKE IN THE NORTH WEST PROVINCE HIA Phase 1 01/03/2021 Johnny van Schalkwyk 10/03/2021 - 19:48
Inkosi Mkhuphukile High School HIA Report Phase 1 Cultural Heritage Impact Assessment: PROPOSED NKOSI MKUPHUKILE HIGH SCHOOL, ALFRED DUMA LOCAL MUNICIPALITY WITHIN UTHUKELA DISTRICT, KWAZULU-NATAL HIA Phase 1 31/03/2020 J.A. van Schalkwyk 18/08/2020 - 11:10
HIA Paradise Solar PV Project Phase 1 Cultural Heritage Impact Assessment: PROPOSED PARADISE 100MW SOLAR PHOTOVOLTAIC (PV) & 40MW BATTERY ENERGY STORAGE SYSTEMS (BESS) PROJECT SOUTH OF BLOEMFONTEIN, FREE STATE PROVINCE HIA Phase 1 14/11/2022 JA VAN SCHALKWYK JA van Schalkwyk Heritage Consultant Nemai Consulting 20/01/2023 - 13:13
Phase 1 Cultural Heritage Impact Assessment Phase 1 Cultural Heritage Impact Assessment: PROSPECTING RIGHT APPLICATION OF DIAMONDS ALLUVIAL AND DIAMONDS GENERAL NEAR CHRISTIANA ON THE REMAINING EXTENT OF PORTION 1 OF THE FARM KAFFRARIA 314HO, LEKWA-TEEMANE LOCAL MUNICIPALITY, NORTH WEST PROVINCE HIA Phase 1 29/09/2017 J.A. van Schalkwyk 13/10/2017 - 15:43
Phase 1 Cultural Heritage Impact Assessment: Phase 1 Cultural Heritage Impact Assessment: PROSPECTING RIGHT APPLICATION ON VARIOUS PORTIONS OF THE FARM READS DRIFT 74, DOUGLAS REGION, PIXLEY KA SEME DISTRICT MUNICIPALITY, NORTHERN CAPE PROVINCE HIA Phase 1 01/11/2019 Johnny van Schalkwyk 02/11/2020 - 08:46
Phase 1 Cultural Heritage Impact Assessment: Johan Smit Phase 1 Cultural Heritage Impact Assessment: PROSPECTING RIGHT APPLICATION WITH BULK SAMPLING ON VARIOUS PORTIONS OF THE FARMS ZONDERHUIS 402, ONDER PLAATS 401 AND NAMAKWARI 656, SIYANDA DISTRICT MUNICIPALITY, NORTHERN CAPE PROVINCE HIA Phase 1 10/12/2019 Johnny van Schalkwyk 24/01/2020 - 10:03
HIA Report_Vorna Valley Water Pipeline Phase 1 Cultural Heritage Impact Assessment: REPLACEMENT OF THE VORNA VALLEY EMERGENCY WATER PIPELINE, MIDRAND REGION, CITY OF JOHANNESBURG METROPOLITAN MUNICIPALITY, GAUTENG PROVINCE HIA Phase 1 28/12/2018 J.A. van Schalkwyk 28/01/2019 - 09:54