THIS IS THE ARCHIVE FOR SAHRIS 1.0
THIS SITE IS NOW AN ARCHIVE AND IS NOT SUITABLE FOR MAKING APPLICATIONS
Please be aware that no content and application creation or changes to information on this version of SAHRIS will be retained.
To make applications or utilise SAHRIS for the creation of information, please use the new site:
https://sahris.org.za
Changes to SAHRIS!
The South African Heritage Resources Information System (SAHRIS) has undergone a generational upgrade and restructure. These changes to the site include, but are not limited to:
- A new & modernised look and layout
- Improved site usage flows with respect to applications and content creation
- Improved site performance and stability
Launch for the new version of SAHRIS occurred on Monday the 30th of October 2023.
The new site can be found here:
SAHRIS | SAHRIS
Displaying 17151 - 17200 of 18975
ReportRef | ReportTitle | ReportType | ReportDate | Authors | AuthoringBody | CommissioningCompany | MapID < 2009 | Post date |
---|---|---|---|---|---|---|---|---|
Swartwater AE01343V | A REPORT ON A CULTURAL HERITAGE IMPACT ASSESSMENT FOR THE PROPOSED SWARTWATER SOLAR PV POWER FACILITY, CLOSE TO PETRUSVILLE, NORTHERN CAPE PROVINCE | HIA Phase 1 | 30/07/2013 | Anton van Vollenhoven | Archaetnos Culture & Cultural Resource Consultants | USK Consulting | 30/07/2013 - 16:45 | |
HIA STRUMOSA URBAN AGRI | A REPORT ON A CULTURAL HERITAGE IMPACT ASSESSMENT FOR THE PROPOSED STRUMOSA URBAN AGRI AND WASTE EDUCATION CENTRE IN RUSTENBURG | HIA Phase 1 | 11/11/2012 | AECOM SA - Head Office | 11/12/2012 - 11:25 | |||
Heritage Impact Assessment for Setlabotsha | A REPORT ON A CULTURAL HERITAGE IMPACT ASSESSMENT FOR THE PROPOSED SETLABOSHA PROJECT, CLOSE TO STANDERTON, MPUMALANGA PROVINCE | HIA Phase 1 | 18/03/2016 | Anton van Vollenhoven | Archaetnos CC | SRK Consulting (Pty) Ltd - Johannesburg | 29/07/2016 - 15:57 | |
AIA_Secunda_Industrial_Park_Van_Vollenhoven_AC_May09 | A report on a Cultural Heritage Impact Assessment for the proposed Secunda Industrial Park in the Mpumalanga Province. | AIA Phase 1 | 01/05/2009 | Anton van Vollenhoven, Anton Pelser | Archaetnos CC | MAPID_03425 | 16/06/2012 - 14:49 | |
Heritage Report for the R34 | A REPORT ON A CULTURAL HERITAGE IMPACT ASSESSMENT FOR THE PROPOSED SANRAL R34 PROJECT BETWEEN SCHWEIZER-RENEKE AND VRYBURG, NORTHWEST PROVINCE | HIA Phase 1 | 31/12/2015 | Anton van Vollenhoven | Archaetnos CC | WSP | 19/05/2016 - 11:49 | |
Heritage Report for the R34 | A REPORT ON A CULTURAL HERITAGE IMPACT ASSESSMENT FOR THE PROPOSED SANRAL R34 PROJECT BETWEEN SCHWEIZER-RENEKE AND VRYBURG, NORTHWEST PROVINCE | HIA Phase 1 | 31/12/2015 | Anton van Vollenhoven | Archaetnos CC | WSP | 19/05/2016 - 11:49 | |
CULTURAL HERITAGE IMPACT ASSESSMENT - PROPOSED RUSTENBURG X 31 | A REPORT ON A CULTURAL HERITAGE IMPACT ASSESSMENT FOR THE PROPOSED RUSTENBURG X 31 HOUSING DEVELOPMENT, CLOSE TO RUSTENBURG, NORTH WEST PROVINCE | HIA Phase 1 | 05/07/2017 | Prof. Anton van Vollenhoven | Archaetnos CC | Lokisa Environmental Consulting CC | 15/01/2018 - 13:01 | |
CULTURAL HERITAGE IMPACT ASSESSMENT - PROPOSED RUSTENBURG X 31 | A REPORT ON A CULTURAL HERITAGE IMPACT ASSESSMENT FOR THE PROPOSED RUSTENBURG X 31 HOUSING DEVELOPMENT, CLOSE TO RUSTENBURG, NORTH WEST PROVINCE | HIA Phase 1 | 05/07/2017 | Prof. Anton van Vollenhoven | Archaetnos CC | Lokisa Environmental Consulting CC | 16/01/2018 - 09:01 | |
New Kleinfontein Return Water Dam | A Report on a Cultural Heritage Impact Assessment for the proposed Return Water Dam at the New Kleinfontein Gold Mine close to Springs, Gauteng Province | AIA Phase 1 | 01/08/2012 | Anton van Vollenhoven | Archaetnos CC | Prime Resources (Pty) Ltd | 22/10/2012 - 11:55 | |
AIA_Refenkgotso_Knoppiesfontein_94_Pelser_AJ_Nov09 | A REPORT ON A CULTURAL HERITAGE IMPACT ASSESSMENT FOR THE PROPOSED REFENKGOTSO EXTENSION TOWNSHIP DEVELOPMENT ON THE REMAINDER OF THE FARM KNOPPIESFONTEIN NO 94, FREE STATE PROVINCE | AIA Phase 1 | 01/11/2009 | Anton Pelser, Anton van Vollenhoven | Archaetnos CC | 16/06/2012 - 14:49 | ||
CULTURAL HERITAGE IMPACT ASSESSMENT | A REPORT ON A CULTURAL HERITAGE IMPACT ASSESSMENT FOR THE PROPOSED PROSPECTING OF THE GLOSAM MINE CLOSE TO POSTMASBURG, NORTHERN CAPE PROVINCE. | HIA Phase 1 | 19/01/2018 | Anton van Vollenhoven | A.C. van Vollenhoven | A.C. van Vollenhoven | 19/01/2018 - 11:19 | |
Heritage Impact Assessment for Wepex Trading (Pty) Ltd | A REPORT ON A CULTURAL HERITAGE IMPACT ASSESSMENT FOR THE PROPOSED PROSPECTING OF THE GLOSAM MINE CLOSE TO POSTMASBURG, NORTHERN CAPE PROVINCE. | HIA Phase 1 | 19/01/2018 | Prof. Anton van Vollenhoven | Archaetnos CC | Archaetnos Culture & Cultural Resource Consultants | 27/02/2019 - 12:56 | |
Heritage Impact Assessment for Wepex Trading (Pty) Ltd | A REPORT ON A CULTURAL HERITAGE IMPACT ASSESSMENT FOR THE PROPOSED PROSPECTING OF THE GLOSAM MINE CLOSE TO POSTMASBURG, NORTHERN CAPE PROVINCE | HIA Phase 1 | 27/03/2019 | Prof. Anton van Vollenhoven | Archaetnos Culture & Cultural Resource Consultants | 27/02/2019 - 13:50 | ||
Heritage Impact Assessment for Wepex Trading (Pty) Ltd | A REPORT ON A CULTURAL HERITAGE IMPACT ASSESSMENT FOR THE PROPOSED PROSPECTING OF THE GLOSAM MINE CLOSE TO POSTMASBURG, NORTHERN CAPE PROVINCE | HIA Phase 1 | 28/03/2019 | Prof. Anton van Vollenhoven | Archaetnos Culture & Cultural Resource Consultants | 28/02/2019 - 12:02 | ||
A report on a cultural Heritage Impact Assessment for the proposed power line known as Eskom Madibeng Route Alternative 3, North West Province | A report on a cultural Heritage Impact Assessment for the proposed power line known as Eskom Madibeng Route Alternative 3, North West Province | HIA Phase 1 | 08/01/2010 | Anton van Vollenhoven | Archaetnos CC | 16/06/2012 - 08:54 | ||
HIA FOR THE PROPOSED PHOTOVOLTIC POWER PLANT AND EMP AMENDMENT FOR THE NORTHAM PLATINUM ZONDEREINDE MINE CLOSE TO NORTHAM, NORTHWEST PROVINCE | A REPORT ON A CULTURAL HERITAGE IMPACT ASSESSMENT FOR THE PROPOSED PHOTOVOLTIC POWER PLANT AND EMP AMENDMENT FOR THE NORTHAM PLATINUM ZONDEREINDE MINE CLOSE TO NORTHAM, NORTHWEST PROVINCE | HIA Phase 1 | 01/03/2013 | Anton van Vollenhoven | Archaetnos Culture & Cultural Resource Consultants | 19/02/2021 - 12:02 | ||
Msebe Phase 1 Heritage Impact Assessment | A REPORT ON A CULTURAL HERITAGE IMPACT ASSESSMENT FOR THE PROPOSED OPENCAST MINING AT MSEBE BLOCK, NONGOMA DISTRICT, KWAZULU-NATAL PROVINCE | HIA Phase 1 | 19/02/2014 | Anton van Vollenhoven | Archaetnos CC | Prime Resources (Pty) Ltd | 08/04/2014 - 10:31 | |
Msebe Phase 1 Heritage Impact Assessment | A REPORT ON A CULTURAL HERITAGE IMPACT ASSESSMENT FOR THE PROPOSED OPENCAST MINING AT MSEBE BLOCK, NONGOMA DISTRICT, KWAZULU-NATAL PROVINCE | HIA Phase 1 | 19/02/2014 | Anton van Vollenhoven | Archaetnos CC | Prime Resources (Pty) Ltd | 08/04/2014 - 10:31 | |
9-2-233-0002-20080601-ACC | A Report on a Cultural Heritage Impact Assessment for the Proposed Nungu Akasia Witfontein Project on Portion 95 (a Portion of Portion 12) of the Farm Witfontein 301 JR, Gauteng Province | AIA Phase 1 | 01/06/2008 | Anton van Vollenhoven, Anton Pelser | Archaetnos CC | MAPID_02146 | 16/06/2012 - 14:38 | |
Middelburg Eastern Bypass | A Report on a Cultural Heritage Impact Assessment for the proposed Middelburg Eastern Bypass Route (As Revised), Middelburg, Mpumalanga Province | AIA Phase 1 | 12/06/2012 | Anton van Vollenhoven | Archaetnos CC | 22/06/2012 - 12:09 | ||
Middelburg Eastern Bypass | A REPORT ON A CULTURAL HERITAGE IMPACT ASSESSMENT FOR THE PROPOSED MIDDELBURG EASTERN BYPASS ROUTE (AS REVISED), MIDDELBURG, MPUMALANGA PROVINCE | AIA Phase 1 | 01/06/2012 | Anton van Vollenhoven | Archaetnos CC | 28/06/2012 - 15:52 | ||
HIA FOR THE PROPOSED MIDDELBURG EASTERN BYPASS ROUTE (AS REVISED), MIDDELBURG, MPUMALANGA PROVINCE | A REPORT ON A CULTURAL HERITAGE IMPACT ASSESSMENT FOR THE PROPOSED MIDDELBURG EASTERN BYPASS ROUTE (AS REVISED), MIDDELBURG, MPUMALANGA PROVINCE | Heritage Impact Assessment Specialist Reports | 24/06/2012 | Anton van Vollenhoven | Archaetnos CC | Wandima Environmental Services cc | 25/09/2013 - 13:01 | |
HIA_Lindleyspoort_Damplaats_Van_Vollenhoven_AC_Sep08 | A Report on a Cultural Heritage Impact Assessment for the Proposed Lindleyspoort/ Damplaats Country Estate on the Farms Lindleyspoort 220 JP and Damplaats 221 JP, North West Province | HIA Phase 1 | 01/09/2008 | Anton van Vollenhoven, Anton Pelser | Archaetnos CC | MAPID_02088 | 16/06/2012 - 14:52 | |
HIA_PROPOSED KANGWANE ANTHRACITE MINE | A REPORT ON A CULTURAL HERITAGE IMPACT ASSESSMENT FOR THE PROPOSED KANGWANE ANTHRACITE MINE, CLOSE TO KOMATIPOORT, MPUMALANGA PROVINCE | HIA Phase 1 | 01/10/2012 | Anton van Vollenhoven | Prime Resources (Pty) Ltd | 06/03/2013 - 14:58 | ||
CULTURAL HERITAGE IMPACT ASSESSMENT FOR THE PROPOSED ISIBONELO COLLIERY BLOCK Z | A REPORT ON A CULTURAL HERITAGE IMPACT ASSESSMENT FOR THE PROPOSED ISIBONELO COLLIERY BLOCK Z OPENCAST MINE, CLOSE TO KRIEL, MPUMALANGA PROVINCE | Heritage Impact Assessment Specialist Reports | Anton van Vollenhoven | Archaetnos CC | 03/07/2014 - 11:01 | |||
Heritage impact assessment for the Isibonelo Colliery Block Z Opencast Mine | A REPORT ON A CULTURAL HERITAGE IMPACT ASSESSMENT FOR THE PROPOSED ISIBONELO COLLIERY BLOCK Z OPENCAST MINE, CLOSE TO KRIEL, MPUMALANGA PROVINCE | Heritage Impact Assessment Specialist Reports | 30/04/2014 | Anton van Vollenhoven | Archaetnos CC | Anglo American Thermal Coal: Isibonelo Colliery | 11/08/2014 - 13:11 | |
AIA_Waterval_Smallholdings_Van_Vollenhoven_AC_Sep08 | A Report on a Cultural Heritage Impact Assessment for the Proposed Industrial Town Development on Holdings Re/31 and 3/31 of the Waterval Smallholdings, North West Province | AIA Phase 1 | 01/09/2008 | Anton van Vollenhoven | Archaetnos CC | MAPID_02071 | 16/06/2012 - 14:51 | |
HIA for a housing development on farm Rockdale 442 JS, Middelburg Mpumalanga | A report on a cultural heritage impact assessment for the proposed housing development on the Remaining Extent of the farm Rockdale 442 JS, close to Middelburg, Mpumalanga Province. | HIA Phase 1 | 29/08/2017 | Prof. Anton van Vollenhoven | Archaetnos Culture & Cultural Resource Consultants | AdiEnvironmental cc | 13/11/2017 - 15:59 | |
HIA_Ellisras_Extension_Van_Vollenhoven_AC_Dec08 | A Report on a Cultural Heritage Impact Assessment for the Proposed Housing Development at Extension 89 Ellisras on the Farm Onverwacht 503 LQ, Lephalale, Limpopo Province | HIA Phase 1 | 01/12/2008 | Anton van Vollenhoven | Archaetnos CC | MAPID_02260 | 16/06/2012 - 14:52 | |
AIA_Onverwacht_503_LQ_-_Ext_88_&_90_Van_Vollenhoven_AC_Dec08 | A Report on a Cultural Heritage Impact Assessment for the Proposed Housing Development at Extension 88 and 90 Ellisras on the Farm Onverwacht 503 LQ, Lephalale, Limpopo Province | AIA Phase 1 | 01/12/2008 | Anton van Vollenhoven | Archaetnos CC | MAPID_02095 | 16/06/2012 - 14:48 | |
AIA_Onverwacht_503_LQ_-_Ext_86_Van_Vollenhoven_AC_Dec08 | A Report on a Cultural Heritage Impact Assessment for the Proposed Housing Development at Extension 86 Ellisras on the Farm Onverwacht 503 LQ, Lephalale, Limpopo Province | AIA Phase 1 | 01/12/2008 | Anton van Vollenhoven | Archaetnos CC | MAPID_02094 | 16/06/2012 - 14:48 | |
AIA_Onverwacht_503_LQ_-_ERF_1522_Van_Vollenhoven_AC_Dec08 | A Report on a Cultural Heritage Impact Assessment for the Proposed Housing Development at Erf 1522 Ellisras on the Farm Onverwacht 503 LQ, Lephalale, Limpopo Province | AIA Phase 1 | 01/12/2008 | Anton van Vollenhoven | Archaetnos CC | MAPID_02093 | 16/06/2012 - 14:48 | |
Friedenheim Office Complex | A REPORT ON A CULTURAL HERITAGE IMPACT ASSESSMENT FOR THE PROPOSED EXTENTION OF THE FRIEDENHEIM OFFICE COMPLEX, NELSPRUIT, MBOMBELA LOCAL MUNICIPALITY, MPUMALANGA | AIA Phase 1 | 28/06/2012 | Anton van Vollenhoven | Archaetnos CC | Aurecon - Head Office | 28/06/2012 - 12:10 | |
Heritage Impact Assessment for Belfast Silica Mine, Belfast, Mpumalanga | A Report on a Cultural Heritage Impact Assessment for the Proposed Extension of the Mining Area at the Belfast Silica Mine, Close to Belfast, Mpumalanga Province. | HIA Phase 1 | 17/11/2014 | Anton van Vollenhoven | Archaetnos CC | Clean Stream Environmental Services | 08/12/2014 - 17:14 | |
HIA for Jacomynspan Project | A REPORT ON A CULTURAL HERITAGE IMPACT ASSESSMENT FOR THE PROPOSED EXPLORATION ACTIVITIES AT THE JACOMYNSPAN PROJECT, NORTHERN CAPE PROVINCE | Heritage Impact Assessment Specialist Reports | 10/02/2014 | Anton van Vollenhoven | Archaetnos CC | GCS Water and Environmental Consultants - Head Office JHB | 02/06/2014 - 12:45 | |
HIA_Lichtenburg_Correctional_Facility_Van_Vollenhoven_AC_Aug09 | A Report on a Cultural Heritage Impact Assessment for the Proposed Expansion Work at the Lichtenburg Correctional Facility, Lichtenburg, North West | HIA Phase 1 | 01/08/2009 | Anton van Vollenhoven, Anton Pelser | Archaetnos CC | 16/06/2012 - 14:52 | ||
Heritage Impact Assessment for SBPM Fine Chrome Recovery Plants and Railway extension site | A REPORT ON A CULTURAL HERITAGE IMPACT ASSESSMENT FOR THE PROPOSED EXPANSION OF THE MASA CHROME PLANTS, RAILWAY TRACK EXTENSION AND NEW LOADING PADS AT THE SIYANDA BAKGATLA PLATINUM MINE NEAR SWARTKLIP IN THE LIMPOPO AND NORTH WEST PROVINCES | HIA Phase 1 | 07/09/2020 | Archaetnos Culture & Cultural Resource Consultants | 14/04/2021 - 13:02 | |||
9-2-212-0013-20080801-ACC | A Report on a Cultural Heritage Impact Assessment for the Proposed Elandsdrift EMPR, near Mooinooi, Northwest Province | AIA Phase 1 | 01/08/2008 | Anton van Vollenhoven, Anton Pelser | Archaetnos CC | MAPID_02216 | 16/06/2012 - 14:38 | |
Selati HIA | A REPORT ON A CULTURAL HERITAGE IMPACT ASSESSMENT FOR THE PROPOSED DEVELOPMENT OF UPMARKET TOURISM ACCOMMODATION ON THE SELATI RAILWAY BRIDGE, SKUKUZA, KRUGER NATIONAL PARK, MPUMALANGA PROVINCE | HIA Phase 1 | 08/03/2018 | Anton van Vollenhoven | Archaetnos CC | Kruger Selati (Pty) Ltd | 21/03/2018 - 06:42 | |
9-2-238-0006-20080401-ACC | A Report on a Cultural Heritage Impact Assessment for the Proposed Development of the New Khunotswana Rural Village Located in the Ramotshere Moiloa Local Municipality, Northwest Province | AIA Phase 1 | 01/04/2008 | Anton van Vollenhoven, Anton Pelser | Archaetnos CC | MAPID_02230 | 16/06/2012 - 14:39 | |
9-2-262-0001-20080501-ACC | A Report on a Cultural Heritage Impact Assessment for the Proposed Development of the Bellevue Extension 3 Residential Town, Located in the Rustenburg Local Municipality, Northwest Province | AIA Phase 1 | 01/05/2008 | Anton van Vollenhoven, Anton Pelser | Archaetnos CC | MAPID_02176 | 16/06/2012 - 14:40 | |
9-2-263-0003-20080601-ACC | A Report on a Cultural Heritage Impact Assessment for the Proposed Development of Marang Estates Located in Mafikeng, Northwest Province | AIA Phase 1 | 01/06/2008 | Anton van Vollenhoven, Anton Pelser | Archaetnos CC | MAPID_02229 | 16/06/2012 - 14:40 | |
9-2-263-0003-20080401-ACC | A Report on a Cultural Heritage Impact Assessment for the Proposed Development of Lethabong Ext 3 Located in the Rustenburg Local Municipality, Northwest Province | AIA Phase 1 | 01/04/2008 | Anton van Vollenhoven, Anton Pelser | Archaetnos CC | MAPID_02154 | 16/06/2012 - 14:40 | |
Revised Arbor Rural Village Heritage Impact Assessment | A Report on a Cultural Heritage Impact Assessment for the Proposed Development of a Rural Village on a Portion of Portion 5 of the Farm Vlakvarkfontein 213 IR and a Portion of the Remaining Extent of Van Dyksput 214 IR, Delmas, Mpumalanga Province. | HIA Phase 1 | 29/10/2018 | Prof. Anton van Vollenhoven | Archaetnos Culture & Cultural Resource Consultants | AdiEnvironmental cc | 06/08/2019 - 10:12 | |
Arbor Rural Village Heritage Impact Assessment | A Report on a Cultural Heritage Impact Assessment for the Proposed Development of a Rural Village on a Portion of Portion 5 of the Farm Vlakvarkfontein 213 IR and a Portion of the Remaining Extent of Van Dyksput 214 IR, Delmas, Mpumalanga Province | HIA Phase 1 | 29/10/2018 | Prof. Anton van Vollenhoven | Archaetnos Culture & Cultural Resource Consultants | AdiEnvironmental cc | 14/01/2019 - 10:50 | |
Arbor Rural Village Heritage Impact Assessment | A Report on a Cultural Heritage Impact Assessment for the Proposed Development of a Rural Village on a Portion of Portion 5 of the Farm Vlakvarkfontein 213 IR and a Portion of the Remaining Extent of Van Dyksput 214 IR, Delmas, Mpumalanga Province | HIA Phase 1 | 29/10/2018 | Prof. Anton van Vollenhoven | Archaetnos Culture & Cultural Resource Consultants | AdiEnvironmental cc | 14/01/2019 - 11:06 | |
Heritage Impact Assessment, Rondebosch Residential Development, Mpumalanga | A Report on a Cultural Heritage Impact Assessment for the Proposed Development of a Residential Area on a Portion of Portion 93 of the Farm Rondebosch 403 JS, Middelburg, Mpumalanga Province. | HIA Phase 1 | 05/12/2018 | Prof. Anton van Vollenhoven | Archaetnos Culture & Cultural Resource Consultants | AdiEnvironmental cc | 13/12/2018 - 09:53 | |
9-2-258-0005-20080801-ACC | A Report on a Cultural Heritage Impact Assessment for the Proposed Development of a Lodge on the Farm Broederstroom 481 JQ, Northwest Province | AIA Phase 1 | 01/08/2008 | Anton van Vollenhoven, Anton Pelser | Archaetnos CC | MAPID_02175 | 16/06/2012 - 14:40 | |
HIA: Transalloys Elandsfontein 309 | A REPORT ON A CULTURAL HERITAGE IMPACT ASSESSMENT FOR THE PROPOSED DEVELOPMENT AT TRANSALLOYS ON PORTIONS 34 AND 35 (PORTION OF PORTION 34) OF THE FARM ELANDSFONTEIN 309 JS AND PORTIONS 20 AND 24 OF THE FARM SCHOONGEZICHT 308 JS, CLOSE TO EMALAHLENI, MPUMALANGA PROVINCE | HIA Phase 1 | 07/03/2014 | Anton van Vollenhoven | Archaetnos CC | HydroScience | 31/03/2014 - 16:21 | |
AIA_Ptn_3_Knoppiesfontein94_AE967_Pelser_AJ_Nov09 | A REPORT ON A CULTURAL HERITAGE IMPACT ASSESSMENT FOR THE PROPOSED DENEYSVILLE EXTENTION TOWNSHIP DEVELOPMENT ON A PART OF THE REMAINING EXTENT OF PORTION 3 OF THE FARM KNOPPIESFONTEIN NO 94, FREE STATE PROVINCE AE967 | AIA Phase 1 | 01/11/2009 | Anton Pelser, Johan van Vollenhoven | Archaetnos CC | 16/06/2012 - 14:49 |