Heritage Cases

THIS IS THE ARCHIVE FOR SAHRIS 1.0


THIS SITE IS NOW AN ARCHIVE AND IS NOT SUITABLE FOR MAKING APPLICATIONS

Please be aware that no content and application creation or changes to information on this version of SAHRIS will be retained.

To make applications or utilise SAHRIS for the creation of information, please use the new site:

https://sahris.org.za

Changes to SAHRIS!

The South African Heritage Resources Information System (SAHRIS) has undergone a generational upgrade and restructure. These changes to the site include, but are not limited to:

  • A new & modernised look and layout
  • Improved site usage flows with respect to applications and content creation
  • Improved site performance and stability

Launch for the new version of SAHRIS occurred on Monday the 30th of October 2023.

The new site can be found here:

SAHRIS | SAHRIS

SAHRA Application Closure

Please note the following concerning applications submitted to the South African Heritage Resources Agency (SAHRA) during the December 2023 to January 2024 period.

The full notice is available here: Notice

Special Notice

Following comments received on the proposed Revised Schedule of Fees for applications made to the South African Heritage Resources Agency (SAHRA), made in terms of Section 25(2)(l) of the National Heritage Resources Act No. 25 of 1999 (NHRA) and published in the Government Gazette of 22 July 2022, SAHRA hereby publishes the final Revised Schedule of Fees for Applications made to SAHRA. Applications for provision of services submitted to the South African Heritage Resources Authority (SAHRA), in terms of the National Heritage Resources Act, No. 25 of 1999 (NHRA) must be accompanied by a payment of the appropriate fee, taking effect from 1 January 2023

Revised Schedule of Fees for Applications made to the South African Heritage Resources Agency (SAHRA)

132kV Powerline and new MCWAP2 substation

CaseViews

CaseHeader

Status: 

HeritageAuthority(s): 

Development Type: 

ProposalDescription: 

Eskom SOC Limited is proposing the development of electrical infrastructure to connect the Thabazimbi Combined Substation with a 132kV transmission power line to the new proposed MCWAP2 substation, and to ensure that the Department of Water and Sanitation (DWS) are able to supply the water demand and needs for the general area. The proposed transmission line and associated infrastructure would include a 132 kV transmission line, an on-site substation, and the use of existing service and access roads for maintenance purposes. In terms of the NEMA and the 2014 NEMA EIA Regulations (as amended) promulgated in Government Gazette 40772 and GN R326, R327, R325 and R324 on 7 April 2017, a Basic Assessment (BA) Process is required for the construction of the proposed transmission line and electrical infrastructure. An Application for EA will be lodged with the DFFE with the submission of the draft BA Report for the transmission line project.

Expanded_Motivation: 

The Department of Water and Sanitation has mandated TCTA for the implementation of the MCWAP-2 Scheme. MCWAP-2 comprises of an abstraction weir and low lift pump station in the Crocodile River at Vlieepoort near Thabazimbi, de-silting facilities with a high lift pump station and an approximate 1,8 m diameter rising pipeline over 29-km, gravity pipeline over 90 km varying between 1,9m and 2,3m diameter pipe with brake pressure and balancing reservoirs and gravity pipeline of 1,3 m diameter over 38 km to a new point of supply for Medupi Power Station near Medupi. MCWAP-2 would deliver 75 million m3 per annum to Steenbokpan. One of the National Development Plan’s primary objectives is to unlock the Northern Mineral Belt with the Waterberg as the catalyst, through the Presidential Infrastructure Co-ordinating Committee and Strategic Infrastructure Project 1. The water demand for the anticipated energy developments driven by the Waterberg coal fields in Lephalale area in the Limpopo Province and the consequential secondary and tertiary developments exceed the water availability in the Mokolo River Catchment which is the current water source for the area. The following would be undertaken: • Construction of 100X100 m (1 Hectare) of 2x20MVA 132kV MCWAP new substation (Study Buffer zone of 2 Hectare) • Installation of 2x20MVA 132/11kV fully equipped transformer bays, 132kV busbar and 2x132kV line bays (one equipped initially with the other for future use) • Building a control room adequate to cater for all secondary plant equipment • Construction of a 12km of 132kV Kingbird Power line9 (Study Corridor for 1km of which will be 500m from the centre of the power line both site) • Building an Access Road of 6m width and 200m length.

ApplicationDate: 

Wednesday, November 30, 2022 - 11:26

CaseID: 

20262

OtherReferences: 

CaseReferenceDepartmentApplicationTypeContactPerson
14/12/16/3/3/1/2642