Heritage Cases

THIS IS THE ARCHIVE FOR SAHRIS 1.0


THIS SITE IS NOW AN ARCHIVE AND IS NOT SUITABLE FOR MAKING APPLICATIONS

Please be aware that no content and application creation or changes to information on this version of SAHRIS will be retained.

To make applications or utilise SAHRIS for the creation of information, please use the new site:

https://sahris.org.za

Changes to SAHRIS!

The South African Heritage Resources Information System (SAHRIS) has undergone a generational upgrade and restructure. These changes to the site include, but are not limited to:

  • A new & modernised look and layout
  • Improved site usage flows with respect to applications and content creation
  • Improved site performance and stability

Launch for the new version of SAHRIS occurred on Monday the 30th of October 2023.

The new site can be found here:

SAHRIS | SAHRIS

SAHRA Application Closure

Please note the following concerning applications submitted to the South African Heritage Resources Agency (SAHRA) during the December 2023 to January 2024 period.

The full notice is available here: Notice

Special Notice

Following comments received on the proposed Revised Schedule of Fees for applications made to the South African Heritage Resources Agency (SAHRA), made in terms of Section 25(2)(l) of the National Heritage Resources Act No. 25 of 1999 (NHRA) and published in the Government Gazette of 22 July 2022, SAHRA hereby publishes the final Revised Schedule of Fees for Applications made to SAHRA. Applications for provision of services submitted to the South African Heritage Resources Authority (SAHRA), in terms of the National Heritage Resources Act, No. 25 of 1999 (NHRA) must be accompanied by a payment of the appropriate fee, taking effect from 1 January 2023

Revised Schedule of Fees for Applications made to the South African Heritage Resources Agency (SAHRA)

Eskom Woestalleen

CaseViews

CaseHeader

Status: 

HeritageAuthority(s): 

Development Type: 

ProposalDescription: 

Envirolution Consulting (Pty) Ltd was appointed by Eskom Holdings SOC Limited (Eskom) to conduct the Basic Assessment (BA) Process for the proposed development of the 132 kV Chikadee power line between existing Bothashoek/Speculate 132 kV power line and the proposed Woestalleen Traction Station within the Steve Tshwete Local Municipality, Mpumalanga Province. ALTERNATIVES/DEVIATIONS CONSIDERED: A Preferred Alternative 1 (Orange route) has been proposed for the 132 kV Chikadee power line between the existing Bothashoek/Speculate 132 kV power line and the proposed Woestalleen traction substation, which will span for approximately 450 m. One other alignment (Alternative 2) has been proposed as the alternative and spans for approximately 560 m. Both alternative alignments are proposed to have 32 m servitude. It must be noted that a corridor of 100 m (50 m either side) will be assessed for both alternatives for the purpose of this basic assessment. Alternative 1 (preferred): The length of power line Alternative 1 is approximately 450 m in total and it will originate from the proposed Woestalleen substation. The power line will start at the proposed Woestalleen substation and span in a north easterly direction before turning north west over the railway, before connecting to the Bothashoek / Speculate power line. This power line servitude is 32 m and traverses Woestalleen 477 JS, Woestalleen 477 JS Portion 8 and De Groote Rietpan 479 JS Portion 2. Alternative 2: The length of power line Alternative 2 is approximately 560 m in total and it will exit the Woestalleen Substation in a northerly direction over the railway, before turning north east and connecting to the Bothashoek / Speculate power line.. This power line servitude is 32 m and traverses Woestalleen 477 JS, Woestalleen 477 JS Portion 8 and De Groote Rietpan 479 JS Portion 2. No Go Alternative: The No-go option implies that the Project does not proceed, and will thus comprise of Eskom not going ahead with the construction of the proposed power line and substation expansion. Ideally, this would be the preferred alternative as the status quo of the environment remains unchanged, however due to the growing demand for energy and activities that will require electricity in the area, this alternative is not preferred. This option is assessed as the “No go” alternative in this basic assessment report. Important Note: An environmental authorisation from Department of Environmental Affairs (DEA) has been granted to Transnet (SOC) Ltd, hereafter Transnet, for the proposed Woestalleen substation (DEA Ref: 14/12/16/3/3/1/1437) (see Appendix J1). The proposed Woestalleen substation’s footprint servitude belongs to Transnet however, Eskom will install feeder equipment on a section of this servitude footprint of the substation in order to accommodate the proposed 132 kV Chikadee line will connect from the Woestalleen substation to the existing Bothashoek/Speculate 132 kV power line. At the time of compilation of this BAR, construction of the Woestalleen substation had commenced. The proposed Woestalleen substation will be located directly adjacent to the existing Transnet traction station. As mentioned above, the objective for this specific development is to assist Transnet in increasing its export coal capacity to 81MTPA and to upgrade the DC sections on the Transnet traction site as well as on the corresponding Eskom sides.

Expanded_Motivation: 

Eskom Holdings is the biggest producer of electricity in South Africa and is a vertically integrated company licensed to generate, transmit and distribute electricity. A distribution operation constructs and maintains equipment that transforms the power supply to the type that meets the customer's needs. Reliable network performance targets necessitate that Eskom Distribution improves present distribution network performance levels. The need and desirability for this specific development is to assist Transnet (SOC) Ltd (Transnet) in increasing its export coal capacity to 81MTPA and to upgrade the Direct Current (DC) sections on the Woestalleen Transnet traction site as well as on the corresponding Eskom sides. Local benefits of the proposed development include benefits to the local economy through possible job creation and local supplier procurement during the construction phase as well as during the operational phase of the development. The project qualifies as a Strategic Infrastructure Project (SIP 10), namely “Electricity transmission and distribution for all”. The project serves to “expand the transmission and distribution network to address historical imbalances, provide access to electricity for all and support economic development. Align the 10-year transmission plan, the services backlog, the national broadband roll-out and the freight rail line development to leverage off regulatory approvals, supply chain and project development capacity”.

ApplicationDate: 

Thursday, January 18, 2018 - 09:52

CaseID: 

12131

OtherReferences: 

Heritage Reports: 

ReferenceList: 

Images
 
 

Search form