Heritage Cases

THIS IS THE ARCHIVE FOR SAHRIS 1.0


THIS SITE IS NOW AN ARCHIVE AND IS NOT SUITABLE FOR MAKING APPLICATIONS

Please be aware that no content and application creation or changes to information on this version of SAHRIS will be retained.

To make applications or utilise SAHRIS for the creation of information, please use the new site:

https://sahris.org.za

Changes to SAHRIS!

The South African Heritage Resources Information System (SAHRIS) has undergone a generational upgrade and restructure. These changes to the site include, but are not limited to:

  • A new & modernised look and layout
  • Improved site usage flows with respect to applications and content creation
  • Improved site performance and stability

Launch for the new version of SAHRIS occurred on Monday the 30th of October 2023.

The new site can be found here:

SAHRIS | SAHRIS

SAHRA Application Closure

Please note the following concerning applications submitted to the South African Heritage Resources Agency (SAHRA) during the December 2023 to January 2024 period.

The full notice is available here: Notice

Special Notice

Following comments received on the proposed Revised Schedule of Fees for applications made to the South African Heritage Resources Agency (SAHRA), made in terms of Section 25(2)(l) of the National Heritage Resources Act No. 25 of 1999 (NHRA) and published in the Government Gazette of 22 July 2022, SAHRA hereby publishes the final Revised Schedule of Fees for Applications made to SAHRA. Applications for provision of services submitted to the South African Heritage Resources Authority (SAHRA), in terms of the National Heritage Resources Act, No. 25 of 1999 (NHRA) must be accompanied by a payment of the appropriate fee, taking effect from 1 January 2023

Revised Schedule of Fees for Applications made to the South African Heritage Resources Agency (SAHRA)

HIA FOR THE PROPOSED BORWA VENT SHAFT & BULK POWER SUPPLY PROJECT, SEKHUKHUNE DISTRICT MUNICIPALITY, LIMPOPO PROVINCE

CaseViews

CaseHeader

Status: 

HeritageAuthority(s): 

Development Type: 

ProposalDescription: 

HERITAGE IMPACT ASSESSMENT (HIA) ON THE REMAINDER OF FARM MALOKELA 370 KT AND PORTION 7 OF FARM THORNCLIFFE 374 KT FOR THE PROPOSED BORWA VENT SHAFT & BULK POWER SUPPLY PROJECT, SEKHUKHUNE DISTRICT MUNICIPALITY, LIMPOPO PROVINCE

Expanded_Motivation: 

CES was appointed by Anglo American Platinum to undertake the environmental impact assessment process (EIA) for the proposed construction of three ventilation shafts and associated infrastructure as well as up and down cast bulk power supply at Mototolo Mine’s Borwa Shaft (hereafter referred to as the “Borwa Vent Shaft & Bulk Power Supply Project). The project is located on the Remainder of Farm Malokela 370 KT and Portion 7 of Farm Thorncliffe 374 KT, Sekhukhune District Municipality in the Limpopo Province”). VENTILATION AND EMULSION SHAFTS The proposed development will include the construction of one downcast shaft, two exhaust (upcast) shafts and an emulsion shaft. The following details are currently available for the proposed ventilation and emulsion shafts. BORROW PITS Construction materials will be sourced from two borrow pits, namely: • Borrow pit 01, located near the entrance to the project area, immediately to the south of the main Borwa Shaft mining area, which will encompass an area of 1 950 m2; and • Borrow pit 02, located near the Northern Upcast Vent Shaft, which will encompass an area of 2 138 m2. ACCESS ROADS The proposed development will require the upgrading of the existing access roads on site, given their current eroded condition, as well as the generally rugged terrain of the project area. Upgraded access roads will be required to each ventilation shaft / emulsion hole and will be included in the applications. Access will be required enable construction of the ventilation shaft and for future inspections. Road will need to be designed to accommodate environmental and physical vehicle requirements to lessen effect on the environment and enable safe use of the road by vehicles. POWERLINES The proposed development will require the construction of three new unshielded 11 kV pole mounted Fox overhead feeder lines (constructed to 33 kV specifications) with three 630 kVA 11 / 0.55 kV ONAN Dyn11 Type B minisub stations feeding Borwa, including: • The Ventilation Line South (Borwa-South), 2 600 m in length; • The Ventilation Line North (Borwa-North), 2 000 m in length; and • The Downcast Line, 1200 m in length (Figure 1.1). CONSTRUCTION SITE CAMP The proposed development will require the establishment of a site camp, within or near the project area, with the following basic services: • Ablution facilities • Tanks for water for drilling operations • Site offices • Security and access control • Illumination.

ApplicationDate: 

Wednesday, October 18, 2023 - 10:18

CaseID: 

22712

OtherReferences: 

ReferenceList: 

 
 

Search form