Heritage Cases

THIS IS THE ARCHIVE FOR SAHRIS 1.0


THIS SITE IS NOW AN ARCHIVE AND IS NOT SUITABLE FOR MAKING APPLICATIONS

Please be aware that no content and application creation or changes to information on this version of SAHRIS will be retained.

To make applications or utilise SAHRIS for the creation of information, please use the new site:

https://sahris.org.za

Changes to SAHRIS!

The South African Heritage Resources Information System (SAHRIS) has undergone a generational upgrade and restructure. These changes to the site include, but are not limited to:

  • A new & modernised look and layout
  • Improved site usage flows with respect to applications and content creation
  • Improved site performance and stability

Launch for the new version of SAHRIS occurred on Monday the 30th of October 2023.

The new site can be found here:

SAHRIS | SAHRIS

SAHRA Application Closure

Please note the following concerning applications submitted to the South African Heritage Resources Agency (SAHRA) during the December 2023 to January 2024 period.

The full notice is available here: Notice

Special Notice

Following comments received on the proposed Revised Schedule of Fees for applications made to the South African Heritage Resources Agency (SAHRA), made in terms of Section 25(2)(l) of the National Heritage Resources Act No. 25 of 1999 (NHRA) and published in the Government Gazette of 22 July 2022, SAHRA hereby publishes the final Revised Schedule of Fees for Applications made to SAHRA. Applications for provision of services submitted to the South African Heritage Resources Authority (SAHRA), in terms of the National Heritage Resources Act, No. 25 of 1999 (NHRA) must be accompanied by a payment of the appropriate fee, taking effect from 1 January 2023

Revised Schedule of Fees for Applications made to the South African Heritage Resources Agency (SAHRA)

Mandlakazi Bulk Water Supply Scheme Upstream Bulks

CaseViews

CaseHeader

Status: 

HeritageAuthority(s): 

Case Type: 

Development Type: 

ProposalDescription: 

Mandlakazi Bulk Water Supply Scheme Upstream Bulks, Zululand District, KZN

Expanded_Motivation: 

At present the bulk of Mandlakazi Bulk Water Supply Scheme water is sourced from Jozini Dam (Pongolapoort). Water supply is currently abstracted via privately owned infrastructure and pumped to the existing Mandlakazi Water Treatment Works (MWTW). When the Mandlakazi raw water demand exceeds 10 Ml/day the privately owned infrastructure will not have sufficient capacity, and as such, the ZDM will require its own infrastructure to abstract and transfer water from the Pongolapoort Dam to ensure adequate supply to the Mandlakazi WTW. In order to reduce the risks associated with relying on a private entity for water supply to supply raw water for basic human consumption, the Zululand District Municipality (ZDM) has there proposed the development of their own dedicated raw water supply to the Mandlakazi WTW. The overall aim is to provide rural communities and homesteads of Mandlakazi with a reliable bulk potable water supply as there is currently limited and rudimentary supply infrastructure. The project therefor provides a reliable link for the passage of raw water from Jozini Dam to the Mandlakazi Water Treatment Works. The project involves the installation of 30km of bulk pipeline from within the Pongola Nature Reserve at 27°30'27.18"S32° 0'11.64"E and will supply the Mandlakazi Water Treatment Works in the south at end point 27°40'49.86"S 31°54'58.33"E. The proposed 30km pipeline will comprise a 1000mm PVC-o rising main from the new abstraction works to the Mandlakazi WTW. The upstream bulk pipeline infrastructure will traverse 13 watercourses, 12 of which are non-perennial, and the Mkuze River being the only perennial river. The Mkuze River crossing will comprise the construction of a new stilted pipe bridge over the Mkuze River, and the alignment will be to the west of the existing road bridge. The proposed infrastructure will include scour, air valve and isolation chambers at predetermined locations along the proposed alignment. An interim reservoir and Interim Pump Station is proposed near the midpoint at 27°38'28.95"S 31°59'13.03"E and 27°38'29.26"S 31°59'11.83"E respectively.

ApplicationDate: 

Friday, July 8, 2022 - 13:39

CaseID: 

19015

OtherReferences: 

ApplicationType

Heritage Reports: 

ReferenceList: 

Images
Mandlakazi WTW
P234 Road pipeline alignment
Watercourse crossing
Pipeline alignment
Mkuze River Pipeline crossing
 
 