Heritage Cases

THIS IS THE ARCHIVE FOR SAHRIS 1.0


THIS SITE IS NOW AN ARCHIVE AND IS NOT SUITABLE FOR MAKING APPLICATIONS

Please be aware that no content and application creation or changes to information on this version of SAHRIS will be retained.

To make applications or utilise SAHRIS for the creation of information, please use the new site:

https://sahris.org.za

Changes to SAHRIS!

The South African Heritage Resources Information System (SAHRIS) has undergone a generational upgrade and restructure. These changes to the site include, but are not limited to:

  • A new & modernised look and layout
  • Improved site usage flows with respect to applications and content creation
  • Improved site performance and stability

Launch for the new version of SAHRIS occurred on Monday the 30th of October 2023.

The new site can be found here:

SAHRIS | SAHRIS

SAHRA Application Closure

Please note the following concerning applications submitted to the South African Heritage Resources Agency (SAHRA) during the December 2023 to January 2024 period.

The full notice is available here: Notice

Special Notice

Following comments received on the proposed Revised Schedule of Fees for applications made to the South African Heritage Resources Agency (SAHRA), made in terms of Section 25(2)(l) of the National Heritage Resources Act No. 25 of 1999 (NHRA) and published in the Government Gazette of 22 July 2022, SAHRA hereby publishes the final Revised Schedule of Fees for Applications made to SAHRA. Applications for provision of services submitted to the South African Heritage Resources Authority (SAHRA), in terms of the National Heritage Resources Act, No. 25 of 1999 (NHRA) must be accompanied by a payment of the appropriate fee, taking effect from 1 January 2023

Revised Schedule of Fees for Applications made to the South African Heritage Resources Agency (SAHRA)

PROPOSED AMENDMENTS TO THE AUTHORISED RAINMAKER SPREEUKLOOF WIND ENERGY FACILITIES NEAR MOLTENO IN THE EASTERN CAPE

CaseViews

CaseHeader

Status: 

HeritageAuthority(s): 

Development Type: 

ProposalDescription: 

Rainmaker Energy Projects (Pty) Ltd received an Environmental Authorisation (EA) for the construction of the Spreeukloof Wind Energy Facility, including overhead power line and associated infrastructure on a site (the ‘Property’) near Molteno in the Eastern Cape Province (DEA ref: 12/12/20/1778/5) on 02 November 2012. The original EIA (which received environmental authorisation in May 2011) and associated specialist studies considered five wind energy facilities collectively referred to as the Dorper Wind Farm (DEA ref: 12/12/20/1778). The Dorper Wind Farm consisted of five phases: Dorper Wind Energy Facility, Loperberg Wind Energy Facility, Malabar Wind Energy Facility, Spinning Head Wind Energy Facility and Spreeukloof Wind Energy Facility. The authorisation for the Spreeukloof Wind Energy Facility was received following the application to amend the Dorper Wind Farm authorisation (i.e. splitting of the project into phases) for the broader facility. Subsequent amendments have been granted for the project as follows: DFFE Ref: 12/12/20/1778/5 (dated 20 May 2013): Amendment to the properties specified for the project, as well as turbine specification changes. DFFE Ref: 12/12/20/1778/5/AM3 (dated 13 June 2016): Amendment to the EA validity (extension) DFFE Ref: 12/12/20/1778/5/AM4 (dated 15 November 2018): Amendment to the EA validity (extension) The proponent is now applying for a substantive amendment (Part II) towards amending the EA with the following amendments: Amendment of turbine specifications, to be as follows: Wind turbine generators (up to 12 turbines), comprising a hub height of ‘up to 120m’ and rotor diameter of ‘up to 176m’, as opposed to the currently authorised number of 21, with hub height and rotor diameter of 120 and 125, respectively. A reduction in the authorised number of turbines from the currently authorised 21 turbines, to reflect as ‘up to 12’ wind turbines. An updated layout will be provided for the amendment towards reflecting the removal of turbines from the currently authorised. Update of the project description to reflect the revised 132KV grid connection line routing and substation location, respectively. Removal of the specification of the facility capacity within the EA, to rather reflect the number of authorised turbines as per the revised layout. Extension of the Environmental Authorisation (EA) validity by an additional two years Amendment to the holder of the Environmental Authorisation Amendment to the capacity of the Spreeukloof Wind Farm The purpose of the facility will be to provide up to 52.5MW of power to be exported to the national energy grid. The project is intended to be bid into future rounds of the Department of Energy’s (DoE) Renewable Energy Independent Power Producers Procurement (REIPPP) Programme. The Wind Energy Facility, including overhead powerline, substation infrastructure and all associated infrastructure will occupy and area of up to 1310ha, and include the following: Wind turbines and associated foundations to support the turbine towers. Underground electrical distribution cabling between the turbines. A shared substation with Malabar Wind Farm project for evacuation to the national energy grid. Internal access roads Offices and workshop buildings for maintenance Laydown areas.

ApplicationDate: 

Friday, July 30, 2021 - 11:07

CaseID: 

16896

OtherReferences: 

CaseReferenceDepartmentApplicationTypeContactPersonFinalDecision
12/12/20/1778/5/AM/6
12/12/20/1778/5/AM7

ReferenceList: 

AdditionalDocuments
 
 

Search form