Heritage Cases

THIS IS THE ARCHIVE FOR SAHRIS 1.0


THIS SITE IS NOW AN ARCHIVE AND IS NOT SUITABLE FOR MAKING APPLICATIONS

Please be aware that no content and application creation or changes to information on this version of SAHRIS will be retained.

To make applications or utilise SAHRIS for the creation of information, please use the new site:

https://sahris.org.za

Changes to SAHRIS!

The South African Heritage Resources Information System (SAHRIS) has undergone a generational upgrade and restructure. These changes to the site include, but are not limited to:

  • A new & modernised look and layout
  • Improved site usage flows with respect to applications and content creation
  • Improved site performance and stability

Launch for the new version of SAHRIS occurred on Monday the 30th of October 2023.

The new site can be found here:

SAHRIS | SAHRIS

SAHRA Application Closure

Please note the following concerning applications submitted to the South African Heritage Resources Agency (SAHRA) during the December 2023 to January 2024 period.

The full notice is available here: Notice

Special Notice

Following comments received on the proposed Revised Schedule of Fees for applications made to the South African Heritage Resources Agency (SAHRA), made in terms of Section 25(2)(l) of the National Heritage Resources Act No. 25 of 1999 (NHRA) and published in the Government Gazette of 22 July 2022, SAHRA hereby publishes the final Revised Schedule of Fees for Applications made to SAHRA. Applications for provision of services submitted to the South African Heritage Resources Authority (SAHRA), in terms of the National Heritage Resources Act, No. 25 of 1999 (NHRA) must be accompanied by a payment of the appropriate fee, taking effect from 1 January 2023

Revised Schedule of Fees for Applications made to the South African Heritage Resources Agency (SAHRA)

The Proposed Construction of Hlabisa Bulk Sewer Pipeline and Wastewater Treatment Works Upgrades, within Big 5 Hlabisa Local Municipality, KZN.

CaseViews

CaseHeader

HeritageAuthority(s): 

Development Type: 

ProposalDescription: 

The proposed upgrading of the Hlabisa Sanitation system entails the construction of Pipelines and the upgrading of water treatment work. This development will take place within Hlabisa town and surrounding areas. Other infrastructures include the construction of a pump station. 1. Construction of Bulk Sewer Pipeline. 2. Construction of two sewer pump stations. 3. The upgrading of existing Hlabisa WWTW. The Project will take place in KwaZulu Natal province within Hlabisa Area, at Hlabisa-Abakwa farm no. 17435, 17435; Hlabisa Reserve No 12 farm 15832 portion 1 and portion 14.

Expanded_Motivation: 

1. Construction of Bulk Sewer Pipeline: The Construction of a 3230m (250mmø) uPVC Bulk Sewer Gravity Main from Matshamnyama – Ward 13 to Emabhanoyini; Construction of the Hlabisa Town Intermediate 3294m (200mmø) uPVC Sewer Main; Construction of the Hlabisa Town Collector 5270m (160mmø) uPVC Sewer Main; Construction of the Matshamnyama Intermediate 750m (200mmø) uPVC Sewer Main; Construction of the Matshamnyama Collector 1184m (160mmø) uPVC Sewer Main; Construction of the Emacekeni Intermediate 1220m (200mmø) uPVC Sewer Main; Construction of the Emacekeni Collector 2450m (160mmø) uPVC Sewer Main; Construction of the Emabhanoyini Intermediate 822m (200mmø) uPVC Sewer Main; Construction of the Emabhanoyini Collector 2007m (160mmø) uPVC Sewer Main; Construction of a 1300m (160mmø) uPVC Bulk Sewer Rising Main 1; Construction of a 1200m (160mmø) uPVC Bulk Sewer Rising Main 2 from Emabhanoyini to Hlabisa WWTW. 2. Construction of two sewer pumpstations: The two sewer pumpstation supports the two rising main to WWTW, and will entail the following: The dimensions of the two pumpstations are (5mx5mx3m); The pumpstations will have the capacity of 12ℓ/s for Pumpstation 1 and 5ℓ/s for Pumpstation 2. 3. The upgrading of existing Hlabisa WWTW: The provision of a formal wastewater treatment facility of capacity of 1.5 Mℓ/day(1500m3/day). This will include the construction of the following: Tie15.5m X 6.5m equalization tank; 21m X 10.4m anoxic tank and 21m X 14m aeration tank; Three Sludge Maturation Ponds: Pond 1 (30m X 30m X 1.5m); Pond 2 (30m X 30m X 1.5m); Pond 3 (22m X 22m X 1.5m); Two 3.5m X 12mØ (396m3)settling tanks; The Project will take place in KwaZulu Natal province within Hlabisa Area, at Hlabisa-Abakwa farm no. 17435, 17435; Hlabisa Reserve No 12 farm 15832 portion 1 and portion 14.

ApplicationDate: 

Monday, November 7, 2022 - 12:48

CaseID: 

20032