Heritage Cases

THIS IS THE ARCHIVE FOR SAHRIS 1.0


THIS SITE IS NOW AN ARCHIVE AND IS NOT SUITABLE FOR MAKING APPLICATIONS

Please be aware that no content and application creation or changes to information on this version of SAHRIS will be retained.

To make applications or utilise SAHRIS for the creation of information, please use the new site:

https://sahris.org.za

Changes to SAHRIS!

The South African Heritage Resources Information System (SAHRIS) has undergone a generational upgrade and restructure. These changes to the site include, but are not limited to:

  • A new & modernised look and layout
  • Improved site usage flows with respect to applications and content creation
  • Improved site performance and stability

Launch for the new version of SAHRIS occurred on Monday the 30th of October 2023.

The new site can be found here:

SAHRIS | SAHRIS

SAHRA Application Closure

Please note the following concerning applications submitted to the South African Heritage Resources Agency (SAHRA) during the December 2023 to January 2024 period.

The full notice is available here: Notice

Special Notice

Following comments received on the proposed Revised Schedule of Fees for applications made to the South African Heritage Resources Agency (SAHRA), made in terms of Section 25(2)(l) of the National Heritage Resources Act No. 25 of 1999 (NHRA) and published in the Government Gazette of 22 July 2022, SAHRA hereby publishes the final Revised Schedule of Fees for Applications made to SAHRA. Applications for provision of services submitted to the South African Heritage Resources Authority (SAHRA), in terms of the National Heritage Resources Act, No. 25 of 1999 (NHRA) must be accompanied by a payment of the appropriate fee, taking effect from 1 January 2023

Revised Schedule of Fees for Applications made to the South African Heritage Resources Agency (SAHRA)

UMSOBOMVU SUBSTATIONS, CONCRETE TOWER MANUFACTURING FACILITIES AND TEMPORARY LAYDOWN AREA, UMSOBOMVU LOCAL MUNICIPALITY (NORTHERN CAPE) AND INXUBA YETHEMBA LOCAL MUNICIPALITY (EASTERN CAPE)

CaseViews

CaseHeader

Status: 

HeritageAuthority(s): 

Development Type: 

ProposalDescription: 

Umsobomvu Wind Power (Pty) Ltd is proposing the development of infrastructure to supplement the development of the authorised Wind Energy Facilities (WEFs) in proximity to the infrastructure site. The proposed infrastructure is situated on Portion 8 of Uitzicht Farm 3, the Remaining Extent (RE) of Winterhoek Farm 118, and the RE of Elands Kloof Farm 135. These properties are situated within the Umsobomvu Local Municipality in the Northern Cape Province and the Inxuba Yethemba Local Municipality in the Eastern Cape Province.

Expanded_Motivation: 

The proposed development includes the following and will require up to 18.75 ha (187 500 m²) of vegetation clearance within the three (3) assessment areas: • The assessment of one (1) 600 m x 900 m area which will include: o An IPP 132 kV Substation up to 22 500 m2; o 132 kV Distribution Collector Substation up to 22 500 m2; o Operation and Maintenance (O&M) Building up to 22 500 m2; and o Two (2) 132 kV Overhead Lines (OHL) of up to 500 m in length. • The assessment of two (2) 300 m x 300 m areas which will include: o Area 1: A Concrete Tower Manufacturing Facility (CTMF) and Temporary Laydown Area of up to 60 000 m2; and o Area 2: A CTMF and Temporary Laydown Area of up to 60 000 m2. • The construction of an up to 3.5 km new access road, including a new intersection, with sections of the road route requiring the widening of existing roads to 12 m in width during construction which will then be rehabilitated to 8 m in width during operation.

ApplicationDate: 

Friday, February 18, 2022 - 17:07

CaseID: 

17975

OtherReferences: 

CaseReferenceDepartmentApplicationTypeDeadlineDate
DFFE Reference Number: 14/12/16/3/3/1/2487
22/03/2022

ReferenceList: 

 
 