THIS IS THE ARCHIVE FOR SAHRIS 1.0
THIS SITE IS NOW AN ARCHIVE AND IS NOT SUITABLE FOR MAKING APPLICATIONS
Please be aware that no content and application creation or changes to information on this version of SAHRIS will be retained.
To make applications or utilise SAHRIS for the creation of information, please use the new site:
https://sahris.org.za
Changes to SAHRIS!
The South African Heritage Resources Information System (SAHRIS) has undergone a generational upgrade and restructure. These changes to the site include, but are not limited to:
- A new & modernised look and layout
- Improved site usage flows with respect to applications and content creation
- Improved site performance and stability
Launch for the new version of SAHRIS occurred on Monday the 30th of October 2023.
The new site can be found here:
SAHRIS | SAHRIS
Displaying 181 - 210 of 12408
CaseID | CaseRef | ProposalDescription | Case Type | Development Type | ApplicationDate | Status |
---|---|---|---|---|---|---|
3191 | 13/IDC/Khananda | The development proposal for Khananda Interpretive Centre is to adapt the existing facility for... more | Development | Leisure | 2013-08-06 16:29:00 | Decision Passed |
9328 | 132kv Double Circuit Power line And On-Site Substation for The Golden Valley II Wind Energy Facility | Terra Wind Energy Golden Valley (Pty) Ltd received environmental authorisation in April 2011 for... more | Section 38 (1) -... | Wind | 2016-03-29 09:52:00 | SUBMITTED |
CaseID | CaseRef | ProposalDescription | Case Type | Development Type | ApplicationDate | Status |
---|---|---|---|---|---|---|
7475 | 130532230B-Nemakonde | Eskom Holdings SOC Ltd, Limpopo Operating Unit (LOU) intends to construct a powerline for the above... more | Section 38 (1) -... | Electrical Infrastructure | 2015-03-31 11:59:00 | Closed (Approved) |
810 | 132KV Harvard Southdrift | 132KV Power Line between harvard and Southdrift Substations DEA Ref: 14/12/16/3/3/1/464 | Development | Electrical Infrastructure | 2012-10-29 11:28:00 | Studies Pending |
7571 | 132kV Power Line for Eskom Libanon | Eskom Holdings SOC Limited (Eskom) proposes to construct a 132kV power line 500m in length which... more | Section 38 (8) -... | Electrical Infrastructure | 2015-04-28 10:53:00 | Closed (Approved) |
5763 | 14/12/16/3/3/1/1135 | Demolishing of the Ekangala Old Oxidation Ponds on behalf of the City of Tshwane Metropolitan... more | Section 38 (8) -... | Environmental Rehabilitation | 2014-06-02 10:38:00 | Closed (Approved) |
5770 | 14/12/16/3/3/2/606, Proposed Construction of Tubatse Strengethening Phase 1-Senakangwedi B Integration | Proposed Construction of Tubatse Strengethening Phase 1-Senakangwedi B Integration | Section 38 (8) -... | Electrical Infrastructure | 2014-06-02 12:33:00 | Studies Pending |
2739 | 14/12/16/3/3/3/59: N4 Kroondal Filling Station | Filling station and associated infrastructure, including a package treatment plant adjacent to the... more | Development | Commercial | 2013-06-24 13:05:00 | Studies Pending |
CaseID | CaseRef | ProposalDescription | Case Type | Development Type | ApplicationDate | Status |
---|---|---|---|---|---|---|
15118 | 1307- Area 7: Koa South Prospecting Right Application | Environmental Impact Management Services (Pty) Ltd (EIMS) has been appointed by Black Mountain... more | Section 38 (8) -... | Minerals | 2020-05-25 09:17:00 | Closed (Approved) |
20621 | 132 KV GRID CONNECTION TRANSMISSION LINE BETWEEN THE ORANGE RIVER SOLAR FACILITY 1 AND ESKOM’S HIGH VOLTAGE GROBLERSHOOP | The Orange River Solar Facility 1 (PTY) Ltd has initiated the development of a 50 MW photovoltaic... more | Section 38 (8) -... | Electrical Infrastructure | 2023-02-06 08:43:00 | Closed (Approved) |
14697 | 1321:ENEL GREEN POWER – KARUSA WIND ENERGY FACILITY: EXTERNAL NEMA EA AND EMPR AUDIT REPORTS | ACED Renewables Hidden Valley (Pty) Ltd was granted an Environmental Authorisation (EA) (DEA Ref.... more | Section 38 (8) -... | Wind | 2020-01-08 08:52:00 | SUBMITTED |
14699 | 1322:ENEL GREEN POWER – SOETWATER WIND ENERGY FACILITY: EXTERNAL NEMA EA AND EMPR AUDIT REPORTS ENEL GREEN POWER – SOETWATER | Soetwater Wind Farm (Pty) Ltd was granted an Environmental Authorisation (EA) (DEA Ref. no: 12/12/... more | Section 38 (8) -... | Wind | 2020-01-08 09:10:00 | SUBMITTED |
1538 | 132kV Jasper SEF Transmission Line | PROPOSED CONSTRUCTION LINE, A SUBSTATION AND SWITCHYARDS ON A REMAINDER OF THE FARM 469 (HUMANSRUS... more | Section 38 (8) -... | Electrical Infrastructure | 2013-02-12 08:19:00 | Closed (Approved) |
20331 | 13319PR Prospecting Right Application | Addwatt (Pty) Ltd has applied for a prospecting right Application for Iron Ore, Manganese Ore and... more | Section 38 (8) -... | Minerals | 2022-12-09 12:20:00 | Studies Pending |
16339 | 1398 Willet Boedery Pivot Expansion EIA Project | Williet Boerdery (Pty) Ltd has appointed Environmental Impact Management Services (Pty) Ltd (EIMS)... more | Section 38 (8) -... | Agriculture | 2021-04-15 16:05:00 | Closed (Approved) |
CaseID | CaseRef | ProposalDescription | Case Type | Development Type | ApplicationDate | Status |
---|---|---|---|---|---|---|
9437 | 132 kV NKWE ESKOM SUBSTATION AND TWO ± 22 KM POWER LINES, Driekop, Lompopo | The project will entail the following activities: • Construction of the proposed Nkwe 132kV... more | Section 38 (8) -... | Electrical Infrastructure | 2016-04-28 15:38:00 | Studies Pending |
20262 | 132kV Powerline and new MCWAP2 substation | Eskom SOC Limited is proposing the development of electrical infrastructure to connect the... more | Section 38 (1) -... | Electrical Infrastructure | 2022-11-30 11:26:00 | Studies Pending |
CaseID | CaseRef | ProposalDescription | Case Type | Development Type | ApplicationDate | Status |
---|---|---|---|---|---|---|
11943 | 132 kV Powerline from Melkspruit Substation to Rouxville Substation | Proposed 132 kV powerline from Melkspruit Substation, in Aliwal North, Walter Sisulu Local... more | Section 38 (8) -... | Electrical Infrastructure | 2017-11-15 14:06:00 | Closed (Approved) |
CaseID | CaseRef | ProposalDescription | Case Type | Development Type | ApplicationDate | Status |
---|---|---|---|---|---|---|
16662 | 132/11kV Leeudoringstad Solar Plant Substation near Leeudoringstad, North-West Province. | Basic Assessment (BA) for the Proposed Development of the 132/11kV Leeudoringstad Solar Plant... more | Section 38 (8) -... | Renewable Energy | 2021-06-21 13:59:00 | Closed (Approved) |
12985 | 14/12/16/3/3/1/2013 | Proposed expansion of Kgaswane Country Lodge on Portions 21 and 85 of the farm Boschfontein 330JQ,... more | Section 38 (8) -... | Commercial | 2018-10-02 14:19:00 | Closed (Approved) |
CaseID | CaseRef | ProposalDescription | Case Type | Development Type | ApplicationDate | Status |
---|---|---|---|---|---|---|
15289 | 1323 Elandsfontein Extension and Consolidation Project | Elandsfontein Colliery (Pty) Ltd (hereafter referred to as the applicant) has appointed Geo Soil... more | Section 38 (8) -... | Mining | 2020-07-21 13:57:00 | Closed (Approved) |
16335 | 1396 Sasol Irenedale Water Pipeline Project | Sasol Limited (hereafter referred to as the applicant) has appointed The Biodiversity Company (TBC... more | Section 38 (8) -... | Infrastructure | 2021-04-15 14:03:00 | Closed (Approved) |
8217 | 14/12/16/3/3/2/811 Khanyisa Power Station | Proposed construction of a 400kV substation and power line for the Khanyisa Power Station,... more | Section 38 (8) -... | Electrical Infrastructure | 2015-08-04 10:01:00 | Closed (Approved) |
CaseID | CaseRef | ProposalDescription | Case Type | Development Type | ApplicationDate | Status |
---|---|---|---|---|---|---|
5910 | 132kV Booysensdal Switching Station | Proposed Construction of a 132kV Switching Station, Booysensdal area, Portion 12 farm Schaapkraal... more | Section 38 (8) -... | Electrical Infrastructure | 2014-07-02 15:24:22 | DRAFT |
CaseID | CaseRef | ProposalDescription | Case Type | Development Type | ApplicationDate | Status |
---|---|---|---|---|---|---|
15423 | 1360 Kookfontein PR Application | Nimbargo Resources (Pty) Ltd (the Applicant) has submitted an application for a Prospecting Right (... more | Section 38 (8) -... | Sand Mining | 2020-08-25 13:05:00 | For Noting |
CaseID | CaseRef | ProposalDescription | Case Type | Development Type | ApplicationDate | Status |
---|---|---|---|---|---|---|
17774 | 1408 Noblesfontein Wind Energy Facility OEMPr Amendment | Noblesfontein Wind Farm was issued an Environmental Authorisation (EA) during 2012 (DFFE Ref: 12/12... more | Section 38 (8) -... | 2022-01-11 14:37:00 | Closed (Approved) |
CaseID | CaseRef | ProposalDescription | Case Type | Development Type | ApplicationDate | Status |
---|---|---|---|---|---|---|
18764 | 140MW Msenge Emoyeni WEF Final EMPr & Layout | The 140MW Msenge Emoyeni WEF (previously referred to as Amakhala Emoyeni Phase 2) has been selected... more | Section 38 (8) -... | Wind | 2022-06-09 09:42:28 | DRAFT |
18765 | 140MW Msenge Emoyeni WEF Final EMPr & Layout | The 140MW Msenge Emoyeni WEF (previously referred to as Amakhala Emoyeni Phase 2) has been selected... more | Section 38 (8) -... | Wind | 2022-06-09 09:42:28 | DRAFT |
18766 | 140MW Msenge Emoyeni WEF Final EMPr & Layout | The 140MW Msenge Emoyeni WEF (previously referred to as Amakhala Emoyeni Phase 2) has been selected... more | Section 38 (8) -... | Wind | 2022-06-09 09:42:28 | DRAFT |
18767 | 140MW Msenge Emoyeni WEF Final EMPr & Layout | The 140MW Msenge Emoyeni WEF (previously referred to as Amakhala Emoyeni Phase 2) has been selected... more | Section 38 (8) -... | Wind | 2022-06-09 09:42:28 | DRAFT |