Permits

THIS IS THE ARCHIVE FOR SAHRIS 1.0


THIS SITE IS NOW AN ARCHIVE AND IS NOT SUITABLE FOR MAKING APPLICATIONS

Please be aware that no content and application creation or changes to information on this version of SAHRIS will be retained.

To make applications or utilise SAHRIS for the creation of information, please use the new site:

https://sahris.org.za

Changes to SAHRIS!

The South African Heritage Resources Information System (SAHRIS) has undergone a generational upgrade and restructure. These changes to the site include, but are not limited to:

  • A new & modernised look and layout
  • Improved site usage flows with respect to applications and content creation
  • Improved site performance and stability

Launch for the new version of SAHRIS occurred on Monday the 30th of October 2023.

The new site can be found here:

SAHRIS | SAHRIS

Kakamas Hydro-Electric Power Plant, Northern Cape

HeritageAuthority: 

PermitID: 

151

PermitHolder: 

PermitDate: 

Thursday, November 15, 2012 to Sunday, December 1, 2013

NHRA: 

Activities: 

SiteReference: 

Conditions: 

Conditions:

  1. If the permit holder is not to be present on the site at all times then the heritage authority must be provided with the names and qualifications of the authorised representatives.
  2. Adequate recording methods as specified in the Regulations and Guidelines pertaining to the National Heritage Resources Act must be employed.  Note that the position of all objects collected must be marked on a plan of site.
  3. A standard site record form must be lodged with the McGregor Museum in Kimberley.
  4. All archaeological material collected, as well as field notes and records, will be curated by the McGregor Museum in Kimberley.
  5. A final report on the results of the collection, recording and analyses must be submitted to the heritage authority issuing this permit on or before the 1st of December 2013.
  6. Reprints of all published papers or copies of theses and/or reports resulting from this work must be lodged with the heritage authority.
  7. If a published report has not appeared within three years of the lapsing of this permit, the report required in terms of the permit will be made available to researchers on request.
  8. It is the responsibility of the permit holder to obtain permission from the landowner for each visit, and conditions of access imposed by the landowner must be observed.
  9. It is the responsibility of the permit holder to fill in excavations and protect sites during and after excavation to the satisfaction of the heritage authority and the landowner.
  10. The heritage authority shall not be liable for any losses, damages or injuries to persons or properties as a result of any activities in connection with this permit.
  11. The heritage authority reserves the right to cancel this permit by notice to the permit holder.

PermitFeeReference: 

AP302DESn ORTON ACO

PermitFeePaidDate: 

19/10/2012

PDF of Permit: 

AttachmentSize
PDF icon Orton_Zwaart_Boois_Berg_Annex.pdf164 KB
 
 