Permits

THIS IS THE ARCHIVE FOR SAHRIS 1.0


THIS SITE IS NOW AN ARCHIVE AND IS NOT SUITABLE FOR MAKING APPLICATIONS

Please be aware that no content and application creation or changes to information on this version of SAHRIS will be retained.

To make applications or utilise SAHRIS for the creation of information, please use the new site:

https://sahris.org.za

Changes to SAHRIS!

The South African Heritage Resources Information System (SAHRIS) has undergone a generational upgrade and restructure. These changes to the site include, but are not limited to:

  • A new & modernised look and layout
  • Improved site usage flows with respect to applications and content creation
  • Improved site performance and stability

Launch for the new version of SAHRIS occurred on Monday the 30th of October 2023.

The new site can be found here:

SAHRIS | SAHRIS

Filming at Swartkrans, Kush Communication

HeritageAuthority: 

PermitID: 

1508

PermitHolder: 

PermitDate: 

Thursday, March 20, 2014 to Tuesday, March 31, 2015

NHRA: 

Activities: 

SiteReference: 

Conditions: 

Conditions:

  1. SAHRA has noted the names of crew on site during filming to be Ms Bridget Osborne, the producer and Mr Henry Smith, the cameraman.
  2. SAHRA noted the equipment to be brought on site to be a camera, a tripod, microphones and small, portable LED lights. 
  3. We understand that Prof. Thackeray will assist with monitoring. Such monitoring should take place at all times when your crew is on site.
  4. Prof. Thackeray must be consulted prior to activities commencing on site to advise the crew on any archaeologically sensitive areas which must be avoided.
  5. The amount of traffic, i.e. numbers of people on site, should be minimized as much as possible to avoid excessive disturbance of the site.
  6. A report on activities related to the permit must be submitted to the heritage authority on or before the end of March 2015. SAHRA reserves the right to withhold further permits if a report is not received or is not satisfactory.
  7. Copies of films resulting from this work must be lodged with the SAHRA.
  8. It is the responsibility of Ms Osborne to obtain permission from the landowner for each visit and to ensure that she has an understanding with the landowner concerning: the number of visitors and workers; speed limits on access roads; possible prohibitions on off-road driving; size, type and number of vehicles permitted; possible prohibitions on trespassing beyond the site; disturbing fauna, flora or substrate; appropriate hours of visiting and working on the site; use of electricity and water; lighting fires and the prevention of uncontrolled fires and any fencing necessary to protect livestock. Conditions of access imposed by the landowner must be observed.
  9. Ms Osborne shall be responsible for the activities and impacts of all colleagues and employees under her supervision and for their compliance with the terms of the permit.
  10. It is the responsibility of Ms Osborne to protect sites during and after filming and to) to the satisfaction of the heritage authority and the landowner.
  11. It is the responsibility of Ms Osborne to ensure that all other permits requested for filming at Swartkrans are adhered to.
  12. SAHRA shall not be liable for any losses, damages or injuries to persons or properties as a result of any activities in connection with this permit.
  13. SAHRA reserves the right to cancel this permit upon notice to the permit holder.

PermitFeeReference: 

Payment for film permit

PermitFeePaidDate: 

06/03/2014

PDF of Permit: 

AttachmentSize
PDF icon Permit_filming_Swartkrans.pdf135.7 KB
 
 

Search form