CaseNo:
PermitID:
PermitHolder:
PermitDate:
NHRA:
Activities:
SiteReference:
Conditions:
This permit is issued to Mr Polke Birkholtz for the disturbance of the historical stone wall which will be affected by the laying of a pipe line between Mamelodi and Vlakfontein. Mr Birkholtz will be monitoring the site while disturbance of the stone wall is undertaken on site.
Conditions:
- If Mr Birkholtz is not to be present on the site at all times, then SAHRA must be provided with the names and qualifications of the authorised representatives.
- Monitoring of the site by Mr Birkholtz, or a representative approved by SAHRA, is compulsory for the entire duration of the work undertaken in proximity of site P3-7.
- Adequate recording methods as specified in the Regulations and Guidelines pertaining to the National Heritage Resources Act must be employed. The position of all stones removed must be marked on a plan of site.
- The stones removed from the wall may be stored on site.
- An annual progress report on the results of the excavations and analyses must be submitted to SAHRA by the end of April 2015. A final report is due on or before the end of April 2016.
- Reprints of all published papers or copies of theses and/or reports resulting from this work must be lodged with SAHRA.
- If a published report has not appeared within three years of the lapsing of this permit, the report required in terms of the permit will be made available to researchers on request.
- SAHRA shall not be liable for any losses, damages or injuries to persons or properties as a result of any activities in connection with this permit.
- SAHRA reserves the right to cancel this permit by notice to the permit holder.
PermitFeeReference:
PermitFeePaidDate:
PDF of Permit:
Attachment | Size |
---|---|
Permit.pdf | 135.29 KB |