Permits

THIS IS THE ARCHIVE FOR SAHRIS 1.0


THIS SITE IS NOW AN ARCHIVE AND IS NOT SUITABLE FOR MAKING APPLICATIONS

Please be aware that no content and application creation or changes to information on this version of SAHRIS will be retained.

To make applications or utilise SAHRIS for the creation of information, please use the new site:

https://sahris.org.za

Changes to SAHRIS!

The South African Heritage Resources Information System (SAHRIS) has undergone a generational upgrade and restructure. These changes to the site include, but are not limited to:

  • A new & modernised look and layout
  • Improved site usage flows with respect to applications and content creation
  • Improved site performance and stability

Launch for the new version of SAHRIS occurred on Monday the 30th of October 2023.

The new site can be found here:

SAHRIS | SAHRIS

Permit for the impact of a pipeline on the Late Iron Age site P3-10

HeritageAuthority: 

PermitID: 

1626

PermitHolder: 

PermitDate: 

Thursday, April 17, 2014 to Thursday, April 30, 2015

NHRA: 

Activities: 

SiteReference: 

Conditions: 

This permit is issued to Mr Birkholtz for disturbance of site P3-10 during the construction of the R5 pipeline between Mamelodi and Vlakfontein. SAHRA understands that at least four stone features and a section of the stone wall located within the pipeline servitude will be affected by the development. 

Conditions:

  1. If Mr Birkholtz is not to be present on the site at all times, SAHRA must be provided with the names and qualifications of the authorised representatives.
  2. Monitoring of the site by Mr Birkholtz, or a representative approved by SAHRA, is compulsory for the entire duration of the work undertaken in proximity of site P3-10. 
  3. Adequate recording methods as specified in the Regulations and Guidelines pertaining to the National Heritage Resources Act must be employed.  The position of all stones removed must be marked on a plan of site.
  4. An annual progress report on the results of the excavations and analyses must be submitted to SAHRA by the end of April 2015. A final report is due on or before the end of April 2016.
  5. Reprints of all published papers or copies of theses and/or reports resulting from this work must be lodged with SAHRA.
  6. If a published report has not appeared within three years of the lapsing of this permit, the report required in terms of the permit will be made available to researchers on request.
  7. SAHRA shall not be liable for any losses, damages or injuries to persons or properties as a result of any activities in connection with this permit.
  8. SAHRA reserves the right to cancel this permit by notice to the permit holder.

PermitFeeReference: 

APMBIRKHOLTZ75020950

PermitFeePaidDate: 

03/04/2014

PDF of Permit: 