This permit is issued to Mr Birkholtz for disturbance of site P3-1 during the construction of the R5 pipeline between Mamelodi and Vlakfontein. The closest stone packed wall is located next to the servitude and about 5m from the pipeline itself. SAHRA understands that the stone packed walling and heaps north of the pipeline may be disturbed during construction.
Conditions:
- If Mr Birkholtz is not to be present on the site at all times, SAHRA must be provided with the names and qualifications of the authorised representatives.
- Monitoring of the site by Mr Birkholtz, or a representative approved by SAHRA, is compulsory for the entire duration of the work undertaken in proximity of site P3-1.
- Adequate recording methods as specified in the Regulations and Guidelines pertaining to the National Heritage Resources Act must be employed. The position of all stones removed must be marked on a plan of site.
- An annual progress report on the results of the excavations and analyses must be submitted to SAHRA by the end of April 2015. A final report is due on or before the end of April 2016.
- Reprints of all published papers or copies of theses and/or reports resulting from this work must be lodged with SAHRA.
- If a published report has not appeared within three years of the lapsing of this permit, the report required in terms of the permit will be made available to researchers on request.
- SAHRA shall not be liable for any losses, damages or injuries to persons or properties as a result of any activities in connection with this permit.
- SAHRA reserves the right to cancel this permit by notice to the permit holder.