Permits

THIS IS THE ARCHIVE FOR SAHRIS 1.0


THIS SITE IS NOW AN ARCHIVE AND IS NOT SUITABLE FOR MAKING APPLICATIONS

Please be aware that no content and application creation or changes to information on this version of SAHRIS will be retained.

To make applications or utilise SAHRIS for the creation of information, please use the new site:

https://sahris.org.za

Changes to SAHRIS!

The South African Heritage Resources Information System (SAHRIS) has undergone a generational upgrade and restructure. These changes to the site include, but are not limited to:

  • A new & modernised look and layout
  • Improved site usage flows with respect to applications and content creation
  • Improved site performance and stability

Launch for the new version of SAHRIS occurred on Monday the 30th of October 2023.

The new site can be found here:

SAHRIS | SAHRIS

West Coast Fossil Park - Bulk Metering unit

HeritageAuthority: 

PermitID: 

2050

PermitHolder: 

PermitDate: 

Wednesday, July 8, 2015 to Sunday, July 31, 2016

Activities: 

SiteReference: 

Conditions: 


This permit is issued to Ms Pippa Haarhoff as representative of the Management Authority of the West Coast Fossil Park (WCFP) National Heritage Site for the construction of a meter kiosk, bulk metering unit and connecting cables on portion 29 of the farm Langeberg, Malmesbury number 185. The development will be adjacent to an existing substation. 

Conditions:

1. If P. Haarhoff is not to be present on the site at all times then SAHRA must be provided with the names and qualifications of the authorised representatives. 

2. All waste material and left over equipment will be removed from the site once the installation has been completed, and the site will be left in the manner it was found (save for the new installation).

3. P. Haarhoff should be on site on the first day of the installation.

4. It is understood that the WCFP MA will photograph the affected area prior to the installation, and again after the installation has been completed.

5. A final report on the results of the maintenance activities should be submitted to SAHRA by the end of July 2016.

6. It is the responsibility of the permit holder to ensure that she has an understanding concerning: the number of visitors and workers; speed limits on access roads; possible prohibitions on off-road driving; size, type and number of vehicles permitted; possible prohibitions on trespassing beyond the site; disturbing fauna, flora or substrate; appropriate hours of visiting and working on the Site; use of firewood, electricity and water; lighting fires and the prevention of uncontrolled fires and any fencing necessary to protect livestock. 

8. SAHRA shall not be liable for any losses, damages or injuries to persons or properties as a result of any activities in connection with this permit.

9. SAHRA reserves the right to cancel this permit by notice to the permit holder. 

PermitFeePaidDate: 

08/07/2015

PDF of Permit: 

AttachmentSize
PDF icon 7886 permit_WCFP_meter_unit.pdf134.72 KB
 
 

Search form