Permits

THIS IS THE ARCHIVE FOR SAHRIS 1.0


THIS SITE IS NOW AN ARCHIVE AND IS NOT SUITABLE FOR MAKING APPLICATIONS

Please be aware that no content and application creation or changes to information on this version of SAHRIS will be retained.

To make applications or utilise SAHRIS for the creation of information, please use the new site:

https://sahris.org.za

Changes to SAHRIS!

The South African Heritage Resources Information System (SAHRIS) has undergone a generational upgrade and restructure. These changes to the site include, but are not limited to:

  • A new & modernised look and layout
  • Improved site usage flows with respect to applications and content creation
  • Improved site performance and stability

Launch for the new version of SAHRIS occurred on Monday the 30th of October 2023.

The new site can be found here:

SAHRIS | SAHRIS

Permit for Repair and Maintenance of the Existing Arniston Harbour Slipway

HeritageAuthority: 

PermitID: 

2548

PermitDate: 

Monday, July 3, 2017 to Tuesday, July 3, 2018

NHRA: 

Activities: 

Conditions: 

Based on SAHRA’s research and on the documentation accompanying the permit application, it is noted that the Arniston Harbour Slipway is older than 60 years and a permit application is required in terms of Section 34 of the NHRA.

Since the repair and maintenance of the existing Slipway will not increase the harbour footprint, the MUCH Unit at SAHRA is pleased to approve the aforementioned permit application. The following terms and conditions apply:

1. If the permit holder is not present on the site at all times, the heritage authority must be provided with the names and contact details of her authorised representative(s).

2. This permit gives the holder and/or her authorised representative(s) the sole right to work on the site of the Arniston Harbour Slipway for the duration of the permit period.

3. Work must be limited to rehabilitation of the existing Slipway using the methods outlined in the description of works attached to the permit application. All activities undertaken under the authority of this permit must be for the sole purpose of infrastructure upgrades to the Slipway only.

4. This permit does not give authorisation for any works, or any damage/disturbance of any cultural heritage material not mentioned in (3) above. This permit does not give the holder the authorisation to install a rock revetment. Should any additional cultural heritage material be discovered and be at risk of damage/disturbance as the result of the activities undertaken under the authority of this permit, SAHRA must be notified immediately and work must cease and may not commence until feedback has been received from SAHRA.

5. It is the responsibility of the permit holder or her authorised representative to obtain permission from the landowner for each visit, and conditions of access imposed by the landowner must be observed.

6. The heritage authority shall not be liable for any losses, damages or injuries to persons or properties as a result of any activities in connection with this permit.

7. The heritage authority reserves the right to cancel this permit by notice to the permit holder.

8. The closing report for the rehabilitation works on the Arniston Harbour Slipway must be made available to SAHRA upon the expiry of this permit.

PermitFeePaidDate: 

03/07/2017

PDF of Permit: 

AttachmentSize
PDF icon slipway permit arniston 03-07-17.pdf96.52 KB
 
 