MyProjects

THIS IS THE ARCHIVE FOR SAHRIS 1.0


THIS SITE IS NOW AN ARCHIVE AND IS NOT SUITABLE FOR MAKING APPLICATIONS

Please be aware that no content and application creation or changes to information on this version of SAHRIS will be retained.

To make applications or utilise SAHRIS for the creation of information, please use the new site:

https://sahris.org.za

Changes to SAHRIS!

The South African Heritage Resources Information System (SAHRIS) has undergone a generational upgrade and restructure. These changes to the site include, but are not limited to:

  • A new & modernised look and layout
  • Improved site usage flows with respect to applications and content creation
  • Improved site performance and stability

Launch for the new version of SAHRIS occurred onĀ Monday the 30th of October 2023.

The new site can be found here:

SAHRIS | SAHRIS

Displaying 1 - 12 of 12
CaseID CaseReference ApplicationDate Status
22516 PHASE 1 HIA PLOT 2386 KAKAMAS-SOUTH NORTHERN CAPE 28/09/2023 DRAFT
21917 EXPANSION AND UPGRADE OF RIETFONTEIN CEMETERY, UPINGTON 19/07/2023 Pending & Under Assessment
21916 EXPANSION AND UPGRADE OF PABALLELO JUPITER CEMETERY, UPINGTON 19/07/2023 Closed (Approved)
21108 PART 2 PROPOSED CONSTRUCTION OF THE 765KV GAMMA SUBSTATION AND ASSOCIATED POWERLINE TURN-IN INFRASTRUCTURE 18/04/2023 Closed (Approved)
20644 MOOKODI INTEGRATION PHASE 2: 132KV POWER LINES NEAR VRYBURG, NORTH WEST PROVINCE DEA Ref No: 14/12/16/3/3/1/678 07/02/2023 Studies Pending
20372 PHASE 1 HIA AGRI-INDUSTRIAL FACILITY VAAL KOPPIES UPINGTON 14/12/2022 Closed (Approved)
20046 Kusile Stormwater Drainage and Associated Infrastructure, near Delmas, Mpumalanga 09/11/2022 Closed (Approved)
19578 PROPOSED NEW 132KV GRID CONNECTION AND ASSOCIATED INFRASTRUCTURE FOR THE AUTHORISED EMOYENI WIND ENERGY FACILITIES, NEAR MURRAYSBURG, BEAUFORT WEST AND UBUNTU LOCAL MUNICIPALITIES AND CENTRAL KAROO AND PIXELY KA SEME DISTRICT MUNICIPALITIES 16/09/2022 Closed (Approved)
19053 Proposed waste pyrolysis facility, Sustineri Energy (Pty) Ltd, Centurion, Gauteng 15/07/2022 Studies Pending
18817 Proposed Paarde Valley PV2 Switching Station, 132 kV OHPL to Vetlaagte MTS and associated infrastructure 15/06/2022 Closed (Approved)
15301 FINAL SCOPING REPORT FOR THE PROPOSED TOWNSHIP ESTABLISHMENT ON PORTION OF FARM KLIPFONTEIN 716 AND FARM CERES 626 WITHIN THE MANGAUNG METROPOLITAN MUNICIPALITY 23/07/2020 Studies Pending
13405 Mining Permit Application on Waterfall 133 29/01/2019 Closed (Approved)
 
 

Search form