Sites

THIS IS THE ARCHIVE FOR SAHRIS 1.0


THIS SITE IS NOW AN ARCHIVE AND IS NOT SUITABLE FOR MAKING APPLICATIONS

Please be aware that no content and application creation or changes to information on this version of SAHRIS will be retained.

To make applications or utilise SAHRIS for the creation of information, please use the new site:

https://sahris.org.za

Changes to SAHRIS!

The South African Heritage Resources Information System (SAHRIS) has undergone a generational upgrade and restructure. These changes to the site include, but are not limited to:

  • A new & modernised look and layout
  • Improved site usage flows with respect to applications and content creation
  • Improved site performance and stability

Launch for the new version of SAHRIS occurred on Monday the 30th of October 2023.

The new site can be found here:

SAHRIS | SAHRIS

2825DA/ Electrical infrastructure/ Farm Cornelia 1550/Site 872

Group

SiteHeader

SiteID: 

130012

FullSiteName: 

Grinding groove

SiteCategory: 

PropertyIsSite: 

No

ReferenceList: 

CitationReferenceType
Orton J, 2015. Scoping and Environmental Impact Assessment for the proposed development of Edison PV 100 MW Photovoltaic Facility

Relationships: 

Group content visibility: 

Use group defaults

Author: 

Ethe.Mngceke

FeaturedSite?: 

NO
Post date: 19/03/2020
Site Comments:

Dolerite rock on the crest of a low hill with grinding patches on it. There are also three proper grooves. Another rock a few meters away has two more ground patches. No artefacts were seen. In a few places in the overall project area some grinding hollows and grooves were located. The best examples were at waypoints 872 and 874 where a number of them were located on a low rocky hill right inside the edge of the EGI corridor. These may have been used for grinding seeds. They are not very old because they have yet to develop patina. No other artefacts were seen on the hill.

 
 

Search form