Heritage Cases

THIS IS THE ARCHIVE FOR SAHRIS 1.0


THIS SITE IS NOW AN ARCHIVE AND IS NOT SUITABLE FOR MAKING APPLICATIONS

Please be aware that no content and application creation or changes to information on this version of SAHRIS will be retained.

To make applications or utilise SAHRIS for the creation of information, please use the new site:

https://sahris.org.za

Changes to SAHRIS!

The South African Heritage Resources Information System (SAHRIS) has undergone a generational upgrade and restructure. These changes to the site include, but are not limited to:

  • A new & modernised look and layout
  • Improved site usage flows with respect to applications and content creation
  • Improved site performance and stability

Launch for the new version of SAHRIS occurred on Monday the 30th of October 2023.

The new site can be found here:

SAHRIS | SAHRIS

SAHRA Application Closure

Please note the following concerning applications submitted to the South African Heritage Resources Agency (SAHRA) during the December 2023 to January 2024 period.

The full notice is available here: Notice

Special Notice

Following comments received on the proposed Revised Schedule of Fees for applications made to the South African Heritage Resources Agency (SAHRA), made in terms of Section 25(2)(l) of the National Heritage Resources Act No. 25 of 1999 (NHRA) and published in the Government Gazette of 22 July 2022, SAHRA hereby publishes the final Revised Schedule of Fees for Applications made to SAHRA. Applications for provision of services submitted to the South African Heritage Resources Authority (SAHRA), in terms of the National Heritage Resources Act, No. 25 of 1999 (NHRA) must be accompanied by a payment of the appropriate fee, taking effect from 1 January 2023

Revised Schedule of Fees for Applications made to the South African Heritage Resources Agency (SAHRA)

Buffalo 2 Solar Park

CaseViews

CaseHeader

Status: 

HeritageAuthority(s): 

ProposalDescription: 

Proposed renewable energy generation projects by Canis Energy (Pty) Ltd (Buffalo 2 Solar Park) on Farm Vergulde Helm 321 LQ with overhead 132kV powerlines to the Eskom Medupi Substation, within the Lephalale Local Municipality, Waterberg District Municipality, Limpopo Province

Expanded_Motivation: 

Canis Energy (Pty) Ltd (Reg. No. 2022/367172/07) is proposing the development, construction and operation of a renewable energy generation facility (Photovoltaic Power Plant) and associated infrastructure, to be located within the Lephalale Local Municipality, Waterberg District Municipality, Limpopo Province. The proposed development will have a Photovoltaic array footprint of up to 500 ha, located on Farm VERGULDE HELM 321 LQ (1299.9416 ha). The project envisages the establishment of a solar photovoltaic power plant with a maximum generation capacity at the delivery point (Maximum Export Capacity) of up to 240 MW within a Development Area (footprint) up to 500 ha. The proposed Buffalo 2 Solar Park will deliver electrical energy to the Eskom Medupi Substation. Two connection alternatives have been considered for the connection infrastructure: Connection Alternative 2 @ 132kV : One 132 kV power line (double circuit), approximately 9.8 km long, will connect the on-site 132kV switching station to the 132 kV busbar of the Eskom Medupi Substation (Connection Alternative 2 @ 132kV). Connection Alternative 1 @ 400kV, should the connection solution proposed by Eskom be at 400kV: • One 132 kV power line (double circuit), approximately 6.7 km long, will connect the on-site 132kV switching station to the 132 kV busbar of the 132kV/400kV step-up substation and 400kV switching station to be built in proximity of the Eskom Medupi Substation (Connection Alternative 1 @ 400kV). • One 132kV/400kV step-up substation with 2x300MVA 132kV/400kV power transformers, stepping up the voltage to 400kV, and one 400kV busbar with metering and protection devices (switching station), will be built in proximity of the Eskom Medupi Substation (Connection Alternative 1 @ 400kV). This HV substation will form part of the Buffalo 1 Solar Park only. One 400 kV power line, approximately 1.3 km long, will connect the on-site 400kV switching station to the 400 kV busbar of the Eskom Medupi Substation (Connection Alternative 1 @400kV). This 400kV powerline will form part of the Buffalo 1 Solar Park only.

ApplicationDate: 

Friday, May 19, 2023 - 12:08

CaseID: 

21385

OtherReferences: 

CaseReferenceDepartmentApplicationTypeDeadlineDate
14/12/16/3/3/2/2290
19/06/2023

ReferenceList: 

 
 

Search form