Heritage Cases

THIS IS THE ARCHIVE FOR SAHRIS 1.0


THIS SITE IS NOW AN ARCHIVE AND IS NOT SUITABLE FOR MAKING APPLICATIONS

Please be aware that no content and application creation or changes to information on this version of SAHRIS will be retained.

To make applications or utilise SAHRIS for the creation of information, please use the new site:

https://sahris.org.za

Changes to SAHRIS!

The South African Heritage Resources Information System (SAHRIS) has undergone a generational upgrade and restructure. These changes to the site include, but are not limited to:

  • A new & modernised look and layout
  • Improved site usage flows with respect to applications and content creation
  • Improved site performance and stability

Launch for the new version of SAHRIS occurred on Monday the 30th of October 2023.

The new site can be found here:

SAHRIS | SAHRIS

SAHRA Application Closure

Please note the following concerning applications submitted to the South African Heritage Resources Agency (SAHRA) during the December 2023 to January 2024 period.

The full notice is available here: Notice

Special Notice

Following comments received on the proposed Revised Schedule of Fees for applications made to the South African Heritage Resources Agency (SAHRA), made in terms of Section 25(2)(l) of the National Heritage Resources Act No. 25 of 1999 (NHRA) and published in the Government Gazette of 22 July 2022, SAHRA hereby publishes the final Revised Schedule of Fees for Applications made to SAHRA. Applications for provision of services submitted to the South African Heritage Resources Authority (SAHRA), in terms of the National Heritage Resources Act, No. 25 of 1999 (NHRA) must be accompanied by a payment of the appropriate fee, taking effect from 1 January 2023

Revised Schedule of Fees for Applications made to the South African Heritage Resources Agency (SAHRA)

Gas to Power Powership at Port of Saldanha

CaseViews

CaseHeader

Status: 

HeritageAuthority(s): 

Development Type: 

ProposalDescription: 

The Project entails the generation of electricity from one Powership moored in the Port of Saldanha Bay, fueled with natural gas supplied from a second ship, a FSRU. The two ships will be moored in the port for the Project’s contracted 20-year lifespan (as per the RMIPPPP requirements). A LNGC will bring in LNG and offload it to the FSRU approximately once every 20 to 30 days, dependent on power demand which is determined by the buyer, ESKOM. The FSRU stores the LNG onboard and turns the liquid form into gaseous form (Natural Gas) upon demand from the Powership (Regasification). Natural gas will be transferred from the FSRU to the Powership via a subsea gas and overland pipeline. Electricity will be generated on the Powership by 24 reciprocating engines, each having a heat input in excess of 10MW (design capacity of 18.32MW each at full capacity). Heat generated by operation of the reciprocating engines is captured, and that energy is used to create steam to drive two steam turbines that each have a heat input of circa 15.45MW. The contracted capacity of 320MW, which will be measured at the Point of Utility Connection located at the new switching station, and which cannot be exceeded under the terms of the RMIPPPP, will be evacuated via a 132 kV transmission line. This line of approximately 7.5km in length will interconnect the Powership to the National Grid utilising the existing Aurora- Saldanha Steel network via a new 132kV on shore switching station.

Expanded_Motivation: 

The proposed Gas to Power Powership Project at the Port of Saldanha has been formulated in response to the Request for Proposals (RFP) for New Generation Capacity under the Risk Mitigation IPP Procurement Programme issued by the Department of Mineral Resources and Energy to alleviate the immediate and future capacity deficit as well as the limited, unreliable and poorly diversified provision of power generating technology with its adverse environmental and economic impacts. The Project triggers a number of activities listed under the National Environmental Management Act 107 of 1998 (NEMA) which require environmental authorisation prior to commencement. Because these listed activities include activities described in the EIA Regulations Listing Notice 2 of 2014, the process that is required to be applied to the application for environmental authorisation is Scoping and Environmental Impact Reporting (S&EIR). The project is located within the Western Cape

ApplicationDate: 

Wednesday, October 28, 2020 - 16:07

CaseID: 

15687

OtherReferences: 

ApplicationTypeDeadlineDateContactPerson
13/12/2022

ReferenceList: 

 
 