Heritage Cases

THIS IS THE ARCHIVE FOR SAHRIS 1.0


THIS SITE IS NOW AN ARCHIVE AND IS NOT SUITABLE FOR MAKING APPLICATIONS

Please be aware that no content and application creation or changes to information on this version of SAHRIS will be retained.

To make applications or utilise SAHRIS for the creation of information, please use the new site:

https://sahris.org.za

Changes to SAHRIS!

The South African Heritage Resources Information System (SAHRIS) has undergone a generational upgrade and restructure. These changes to the site include, but are not limited to:

  • A new & modernised look and layout
  • Improved site usage flows with respect to applications and content creation
  • Improved site performance and stability

Launch for the new version of SAHRIS occurred on Monday the 30th of October 2023.

The new site can be found here:

SAHRIS | SAHRIS

SAHRA Application Closure

Please note the following concerning applications submitted to the South African Heritage Resources Agency (SAHRA) during the December 2023 to January 2024 period.

The full notice is available here: Notice

Special Notice

Following comments received on the proposed Revised Schedule of Fees for applications made to the South African Heritage Resources Agency (SAHRA), made in terms of Section 25(2)(l) of the National Heritage Resources Act No. 25 of 1999 (NHRA) and published in the Government Gazette of 22 July 2022, SAHRA hereby publishes the final Revised Schedule of Fees for Applications made to SAHRA. Applications for provision of services submitted to the South African Heritage Resources Authority (SAHRA), in terms of the National Heritage Resources Act, No. 25 of 1999 (NHRA) must be accompanied by a payment of the appropriate fee, taking effect from 1 January 2023

Revised Schedule of Fees for Applications made to the South African Heritage Resources Agency (SAHRA)

Kapama Extensions and WWTW Upgrades

CaseViews

CaseHeader

Status: 

HeritageAuthority(s): 

Development Type: 

ProposalDescription: 

Proposed Extensions to River Lodge and WWTW Upgrades in Kapama Private Game Reserve, Limpopo Province

Expanded_Motivation: 

The proposed development entails the expansion of River Lodge and WWTW Upgrades within Kapama Private Game Reserve. The extensions to River Lodge will consist of the construction of a new dining room and approximately 20 tourism accommodation suites. The proposed new dining room will be located just north of the existing dining room complex over a dry river bed. The new dining room will be elevated on stilts and a raised wooden walkway will join the existing dining complex with the new dining complex. The proposed new spa suites at River Lodge will be located to the east of the existing spa suites and will join to the existing building by a raised wooden walkway. Power will be supplied to these two new additions via solar panels. Additionally, new wastewater treat works will be constructed at the four lodges (River Lodge, Buffalo Camp, Karula and Southern Camp) and staff village within Kapama Private Game Reserve. The WWTW proposed is the Moving bio-bed Reactor. This system consists of two reactor tanks with the bacteria required for the process, fixed on carrier media, and a clarifier and is fully automated. All efforts will be made to locate the new WWTW within the existing footprints of the current works, however, if this is not possible then the existing footprint will be extended slightly to accommodate the package plant. At some of the lodges, existing infrastructure (such as pump houses and sand filters) will be utilized for the new WWTW and thereby reducing the footprint. All oxidation ponds/ evaporation dams will be decommissioned, capped and the areas rehabilitated.

ApplicationDate: 

Thursday, February 20, 2020 - 09:37

CaseID: 

14907

OtherReferences: 

Heritage Reports: 

ReferenceList: 

 
 

Search form