Heritage Cases

THIS IS THE ARCHIVE FOR SAHRIS 1.0


THIS SITE IS NOW AN ARCHIVE AND IS NOT SUITABLE FOR MAKING APPLICATIONS

Please be aware that no content and application creation or changes to information on this version of SAHRIS will be retained.

To make applications or utilise SAHRIS for the creation of information, please use the new site:

https://sahris.org.za

Changes to SAHRIS!

The South African Heritage Resources Information System (SAHRIS) has undergone a generational upgrade and restructure. These changes to the site include, but are not limited to:

  • A new & modernised look and layout
  • Improved site usage flows with respect to applications and content creation
  • Improved site performance and stability

Launch for the new version of SAHRIS occurred on Monday the 30th of October 2023.

The new site can be found here:

SAHRIS | SAHRIS

SAHRA Application Closure

Please note the following concerning applications submitted to the South African Heritage Resources Agency (SAHRA) during the December 2023 to January 2024 period.

The full notice is available here: Notice

Special Notice

Following comments received on the proposed Revised Schedule of Fees for applications made to the South African Heritage Resources Agency (SAHRA), made in terms of Section 25(2)(l) of the National Heritage Resources Act No. 25 of 1999 (NHRA) and published in the Government Gazette of 22 July 2022, SAHRA hereby publishes the final Revised Schedule of Fees for Applications made to SAHRA. Applications for provision of services submitted to the South African Heritage Resources Authority (SAHRA), in terms of the National Heritage Resources Act, No. 25 of 1999 (NHRA) must be accompanied by a payment of the appropriate fee, taking effect from 1 January 2023

Revised Schedule of Fees for Applications made to the South African Heritage Resources Agency (SAHRA)

Langaville Ext 12 Sewer and Water

CaseViews

CaseHeader

Status: 

HeritageAuthority(s): 

Development Type: 

ProposalDescription: 

The City of Ekurhuleni’s Human Settlements Department has identified the requirement for a bulk water and sewer line to be implemented for the earmarked Langaville Ext. 12 housing development. The proposed Langaville Ext.12 development consists of a mixed residential type of housing units planned for the lower income housing market. The proposed bulk sewer pipeline and upgrade to the water pipeline will provide bulk services to the housing development. This is to take place within the Gauteng Province.

Expanded_Motivation: 

The following bulk water and sewer reticulation lines and proposed diameters have been identified: 1. Bulk Water Line:  Installation of 4000m x 400/450mm Ø parallel reinforcement pipeline  Installation of 800m x 250mm Ø parallel reinforcement pipeline  Installation of 1050m x 250mm Ø pipeline  Installation of 100m x 160mm Ø pipeline The water lines required to service the proposed development are the 1050m and 100m lines that will connect onto the existing municipal infrastructure. These two water lines are newly added lines into the network system. The 1050m line will start from Rokhana Street and will run parallel to Tonk Meter Road (M86) in a southerly direction and then turn west towards the proposed development. This line will provide a connection point at the north-eastern corner for the proposed development. The 100m line will start at the unknown street running from Masibeni Street to Maziya Street at the north-western boundary of the site and terminate at 100m to the proposed development. Refer to drawing no. CE103-1100-Rev A (1050m & 100m Water Line). The water lines required to address the pressure problem within the system are the 4000m and 800m lines. These lines have been horizontally aligned to replace existing AC (Asbestos Cement pipes). 2. Bulk Sewer Line:  Installation of 315mm Ø pipeline  Installation of 250mm Ø pipeline The GLS report has indicated the current sewer collector system has sufficient capacity to receive the outflow from the proposed development. The new bulk sewer line will connect the development from its bottom south-east corner and travel east, crossing Tonk Meter Road, towards the collector sewer located in Wentzel Street. The proposed development can be accommodated within the Grundlingh Waste Water Treatment Plant (WWTP) drainage area.

ApplicationDate: 

Monday, June 7, 2021 - 16:00

CaseID: 

16587

OtherReferences: 

DeadlineDate
28/06/2021