Heritage Cases

THIS IS THE ARCHIVE FOR SAHRIS 1.0


THIS SITE IS NOW AN ARCHIVE AND IS NOT SUITABLE FOR MAKING APPLICATIONS

Please be aware that no content and application creation or changes to information on this version of SAHRIS will be retained.

To make applications or utilise SAHRIS for the creation of information, please use the new site:

https://sahris.org.za

Changes to SAHRIS!

The South African Heritage Resources Information System (SAHRIS) has undergone a generational upgrade and restructure. These changes to the site include, but are not limited to:

  • A new & modernised look and layout
  • Improved site usage flows with respect to applications and content creation
  • Improved site performance and stability

Launch for the new version of SAHRIS occurred on Monday the 30th of October 2023.

The new site can be found here:

SAHRIS | SAHRIS

SAHRA Application Closure

Please note the following concerning applications submitted to the South African Heritage Resources Agency (SAHRA) during the December 2023 to January 2024 period.

The full notice is available here: Notice

Special Notice

Following comments received on the proposed Revised Schedule of Fees for applications made to the South African Heritage Resources Agency (SAHRA), made in terms of Section 25(2)(l) of the National Heritage Resources Act No. 25 of 1999 (NHRA) and published in the Government Gazette of 22 July 2022, SAHRA hereby publishes the final Revised Schedule of Fees for Applications made to SAHRA. Applications for provision of services submitted to the South African Heritage Resources Authority (SAHRA), in terms of the National Heritage Resources Act, No. 25 of 1999 (NHRA) must be accompanied by a payment of the appropriate fee, taking effect from 1 January 2023

Revised Schedule of Fees for Applications made to the South African Heritage Resources Agency (SAHRA)

Nositha Road Upgrade,Hibiscus Coast , Ugu District, KwaZulu Natal

CaseViews

CaseHeader

Status: 

HeritageAuthority(s): 

Development Type: 

ProposalDescription: 

The upgrading project will start where the road changes from black top to gravel at approximately 30°50'30.0"S 30°19'56.1"E; and ends at 30°49'16.8"S 30°18'44.7"E. The existing road length is 4.4km and will be resurfaced to black top (formal asphalt surfacing) with associated base course and sub base pavement layers. Stormwater drainage management installations such as culverts, kerb, channel and concrete side drains (lined v-drains) infrastructure will also form part of the proposed upgrade. The road will be a 6m wide black top surface (within the existing road footprint) with a road reserve of 10 to 15m. The installation of gabion baskets will be placed at inlet and outlet structures to prevent eroding of the side slopes. The construction of box and pipe culverts will occur at fourteen (14) different positions of existing stormwater infrastructures.

ApplicationDate: 

Thursday, September 22, 2016 - 17:24

CaseID: 

10161

OtherReferences: 

ReferenceList: 

Images
Road and settlement
Landscape
Road
Road and landscape
Road alignment
Road alignment
 
 

Search form