Heritage Cases

THIS IS THE ARCHIVE FOR SAHRIS 1.0


THIS SITE IS NOW AN ARCHIVE AND IS NOT SUITABLE FOR MAKING APPLICATIONS

Please be aware that no content and application creation or changes to information on this version of SAHRIS will be retained.

To make applications or utilise SAHRIS for the creation of information, please use the new site:

https://sahris.org.za

Changes to SAHRIS!

The South African Heritage Resources Information System (SAHRIS) has undergone a generational upgrade and restructure. These changes to the site include, but are not limited to:

  • A new & modernised look and layout
  • Improved site usage flows with respect to applications and content creation
  • Improved site performance and stability

Launch for the new version of SAHRIS occurred on Monday the 30th of October 2023.

The new site can be found here:

SAHRIS | SAHRIS

SAHRA Application Closure

Please note the following concerning applications submitted to the South African Heritage Resources Agency (SAHRA) during the December 2023 to January 2024 period.

The full notice is available here: Notice

Special Notice

Following comments received on the proposed Revised Schedule of Fees for applications made to the South African Heritage Resources Agency (SAHRA), made in terms of Section 25(2)(l) of the National Heritage Resources Act No. 25 of 1999 (NHRA) and published in the Government Gazette of 22 July 2022, SAHRA hereby publishes the final Revised Schedule of Fees for Applications made to SAHRA. Applications for provision of services submitted to the South African Heritage Resources Authority (SAHRA), in terms of the National Heritage Resources Act, No. 25 of 1999 (NHRA) must be accompanied by a payment of the appropriate fee, taking effect from 1 January 2023

Revised Schedule of Fees for Applications made to the South African Heritage Resources Agency (SAHRA)

Project Infinity - Retrofitting of existing plant at Thabazimbi Mine

CaseViews

CaseHeader

Status: 

HeritageAuthority(s): 

Development Type: 

ProposalDescription: 

Proposed retrofitting of existing plant at Thabazimbi Mine associated with Project Infinity

Expanded_Motivation: 

Proposed new developments associated with Project Infinity New developments (all within the existing mining area) associated with the project include the following: The following activities are related to Mining: • Exploration within existing pit boundaries, • Mining of Low Grade Material within the existing Kumba North and South Pits and re-entry to Vanderbijl pit); • New access and haul roads (Vanderbijl pit), • Stockpiling of low grade ore at various localities on the mining area (Buffelshoek west B1 & B2). Refer to figure 2. • Primary stockpile areas located Donkerpoort and Van der Bijl primary crushers. Refer to figure 3. The project consists of two main components namely the Retrofit Stand-alone Plant. The Retrofit Plant: 3) The following activities are associated with the Processing Plant: (a) Removing old and fitting new 3-way chute between 1° & 2° crushing and washing & screening, (b) Changing current 32mm top decks to 25mm top decks at 1°Screening, (c) Removing old and fitting new 1mm classification circuit to existing washing and screening building, (d) Changing current 8mm decks to 5mm decks at 3° screening, (e) Upgrading of existing DMS Plant equipment for same throughput & media recovery from 2.8 t/m³ to 4.1 t/m³ circuit medium density, (f) Installing new 1mm beneficiation circuit into existing refurbished structural steel above existing plant civils, (g) Increasing existing fines product stockpiling capacity for increased fines: lump ratio from low grade run of mine. The following infrastructure is associated with the Retrofit Plant: 4) (a) Upgrading existing plant discard system for increase Solid waste output from maximum future high & low grade beneficiation circuits, (b) Construction of a new slimes dam 5 before existing run out of capacity, (c) Upgraded slimes handling system. Stand-alone Plant: (2) The following activities are associated with the Stand-alone plant: (a) Stockpiling of 2014 unbeneficiated Low grade lump material, (b) Constructing new stand Alone liberation, classification & beneficiation circuit for future Low grade lump material, (c) Installing fines product blending ability to increased fines product stockpiling. The following infrastructure is associated with the Stand-alone plant; (a) Existing Thabazimbi rail yard to ensure a less than 12 hours turnaround time. Possible construction of new 2° crushing circuit for partial feed to low grade circuit. Most of the listed activities are associated with the slimes dam, pipeline and increase of the discard dump footprint. Retrofitting of the existing plant and construction of the stand alone plant are within a brown field area and no listed activities are triggered for those two activities. This final scoping report is in support of our environmental impact assessment for the slimes dam, pipeline and increase of the discard dump footprint. Retrofitting of the existing plant and construction of the stand alone plant.

ApplicationDate: 

Monday, December 9, 2013 - 15:57

CaseID: 

4390

OtherReferences: 

CaseReferenceApplicationTypeDeadlineDate
548
22/01/2014

ReferenceList: 

 
 

Search form