Heritage Cases

THIS IS THE ARCHIVE FOR SAHRIS 1.0


THIS SITE IS NOW AN ARCHIVE AND IS NOT SUITABLE FOR MAKING APPLICATIONS

Please be aware that no content and application creation or changes to information on this version of SAHRIS will be retained.

To make applications or utilise SAHRIS for the creation of information, please use the new site:

https://sahris.org.za

Changes to SAHRIS!

The South African Heritage Resources Information System (SAHRIS) has undergone a generational upgrade and restructure. These changes to the site include, but are not limited to:

  • A new & modernised look and layout
  • Improved site usage flows with respect to applications and content creation
  • Improved site performance and stability

Launch for the new version of SAHRIS occurred on Monday the 30th of October 2023.

The new site can be found here:

SAHRIS | SAHRIS

SAHRA Application Closure

Please note the following concerning applications submitted to the South African Heritage Resources Agency (SAHRA) during the December 2023 to January 2024 period.

The full notice is available here: Notice

Special Notice

Following comments received on the proposed Revised Schedule of Fees for applications made to the South African Heritage Resources Agency (SAHRA), made in terms of Section 25(2)(l) of the National Heritage Resources Act No. 25 of 1999 (NHRA) and published in the Government Gazette of 22 July 2022, SAHRA hereby publishes the final Revised Schedule of Fees for Applications made to SAHRA. Applications for provision of services submitted to the South African Heritage Resources Authority (SAHRA), in terms of the National Heritage Resources Act, No. 25 of 1999 (NHRA) must be accompanied by a payment of the appropriate fee, taking effect from 1 January 2023

Revised Schedule of Fees for Applications made to the South African Heritage Resources Agency (SAHRA)

The proposed upgrading of Olifantspoort and Ebenezer Water Supply Schemes

CaseViews

CaseHeader

Status: 

HeritageAuthority(s): 

Development Type: 

ProposalDescription: 

The proposed upgrading of Olifantspoort Water Supply Scheme including Olifantspoort Water Scheme, Ebenezer Water Scheme, and the refurbishment of the Ebenezer WTW.

Expanded_Motivation: 

The proposed upgrading of Olifantspoort Water Supply Scheme, Phase 1 from Olifantspoort WTW to Krugersburg Reservoirs, and Upgrading of Ebenezer Water Supply Scheme, Phase 1 from Ebenezer Pumpstation to Rustfontein, and Mankweng reservoir off-take, will includes the following components of the water conveyance and storage infrastructure: Olifantspoort Water Scheme: The total pipeline length for Olifantspoort Scheme upgrade is 86km from olifants river (abstraction) to Krugersburg reservoirs. There are components of water conveyance and storage infrastructure along the pipeline route, as outlined below: The upgrading of Olifantspoort weir and raw water abstraction works; Construction of 200 000m2 Olifantspoort off-channel storage dam with 5m embarkment height, Construction of 1500mmø raw water mains ( 350m from Olifantspoort abstraction to off-stream storage dam, and 450m from off-stream storage dam to Olifantspoort WTW); Refurbishment of the Olifantspoort Water Treatment Works (WTW); Upgrading of the existing Olifantspoort WTW by constructing new 60 Mℓ/d module; Refurbishment of Pump Station (PS): PS1, PS2 and PS3; Upgrading of Specon Storage Reservoirs; Constructing a new pump stations at PS1 (Olifantspoort WTW) and PS2 and PS3; Duplicate/dualisation of approximately 28.3km (800mmø) existing main by adding another (1500mmø) rising main from Olifantspoort WTW (PS1) to Specon; Duplicate/dualisation of approximately 23.6km (790mmø) existing main by adding another (1500mmø) main from Specon to PS2, and from PS2 Witkos Reservoir; Duplicate/dualisation of approximately 14.6km (740mmø) existing main by adding another(1200mmø) main from Witkos Reservoir to PS3 and Palmietfontein Reservoir; Construction of new reservoirs at Witkos (30Mℓ) and Palmietfontein (50Mℓ); Construction of approximately 8.5km (1200mmø) pumping main with pumping rate of (1900 ℓ/s) from Palmietfontein Reservoirs to OSA164; Construction of approximately 11km (1200mmø) gravity main with pumping rate of (1900 ℓ/s) from OSA 164 to Krugersburg reservoirs. Ebenezer Water Scheme: The total pipeline length for Ebenezer Scheme upgrade is approximately 13.5km. There are components of water conveyance and storage infrastructure along the pipeline route, as outlined below: The refurbishment of the Ebenezer WTW; Refurbishment and modifications to Ebenezer high-lift pump station; Construction of approximately11km(900mmø) new pumping main with a pumping rate of (1250ℓ/s), corresponding to 89 Mℓ /day from Ebenezer high-lift pump station to Rustfontein reservoirs complex; Extension of approximately 2.5km (600mmø) pumping main (Pipeline B) from Chamber GB73 to the Mankweng reservoir off-take. Both of the proposed pipeline upgrades and refurbishment between Olifantspoort and Ebenezer Schemes’ water conveyance and storage infrastructure merge to supply the Polokwane Municipal Area. This will enable an additional 40Mℓ/day to be supplied to Polokwane City (25Mℓ/day from Olifantspoort and 15Mℓ/day from Ebenezer). The total length of pipeline upgrade for these two schemes is approximately 99.5km.

ApplicationDate: 

Monday, March 7, 2022 - 14:46

CaseID: 

18069

OtherReferences: 

ApplicationType

ReferenceList: 

Images
 
 

Search form