Commissioning Company Reports

THIS IS THE ARCHIVE FOR SAHRIS 1.0


THIS SITE IS NOW AN ARCHIVE AND IS NOT SUITABLE FOR MAKING APPLICATIONS

Please be aware that no content and application creation or changes to information on this version of SAHRIS will be retained.

To make applications or utilise SAHRIS for the creation of information, please use the new site:

https://sahris.org.za

Changes to SAHRIS!

The South African Heritage Resources Information System (SAHRIS) has undergone a generational upgrade and restructure. These changes to the site include, but are not limited to:

  • A new & modernised look and layout
  • Improved site usage flows with respect to applications and content creation
  • Improved site performance and stability

Launch for the new version of SAHRIS occurred on Monday the 30th of October 2023.

The new site can be found here:

SAHRIS | SAHRIS

Displaying 1 - 24 of 24
HeritageReport
PROPOSED NEW THEMBALETHU SECONDARY SCHOOL
Paleontological report-Sigma
HIA for mixed use development on farm 15961 Madadeni
Construction of the New Nzalo (Mqwabe) 400/88kV, 160MVA Substation with associated 88kV and 400kV turn in power lines East of Vryheid, KwaZulu-Natal Province
Mukope HIA
Mathulini AIA
APPLICATION FOR EXEMPTION FROM CONDUCTING A PHASE I ARCHAEOLOGICAL IMPACT ASSESSMENT
APPLICATION FOR EXEMPTION FROM CONDUCTING A PHASE I ARCHAEOLOGICAL IMPACT ASSESSMENT
APPLICATION FOR EXEMPTION FROM CONDUCTING A PHASE I ARCHAEOLOGICAL IMPACT ASSESSMENT
HIA for Matai Mining Right Application
PHASE I ARCHAEOLOGICAL AND CULTURAL HERITAGE IMPACT ASSESSMENT SPECIALIST REPORT FOR THE PROPOSED CONSTRUCTION OF APPROXIMATELY 170KM 1 X 400KV POWERLINE FROM MAPHUTHA SUBSTATION TO WITKOP SUBSTATION
M2 Precious and Base Metals HIA Report
M2 Precious and Base Metals HIA Report
DESKTOP PALAEONTOLOGY ASSESSMENT FOR LEC
Archaeological and Cultural Heritage Impact Assessment
IFIDI Bridge HIA for ISolendalo Environmental Consulting
ISolendalo Environmental Consulting
ARCHAEOLOGICAL IMPACT ASSESSMENT SPECIALIST STUDY REPORT FOR THE PROPOSED TUBATSE STRENGTHENING PHASE I – SENAKANGWEDI B INTEGRATION
PROPOSED UPGRADE (GRAVEL TO TAR) OF 21KM ROAD D3634 AND D3778 AND REFURBISHMENT OF BRIDGE AND CULVERT
ARCHAEOLOGICAL IMPACT ASSESSMENT SPECIALIST STUDY REPORT FOR THE PROPOSED NEW METEOR SUBSTATION
Tubatse B HIA Report
Abersethin Heritage report
PHASE 1 AIA FOR THE PROPOSED ERMELO TOWNSHIP ESTABLISHMENT
Ermelo Township Establishment
 
 

Search form